ORIGINAL RESEARCH article

Front. Built Environ., 23 January 2024

Sec. Urban Science

Volume 9 - 2023 | https://doi.org/10.3389/fbuil.2023.1334005

Assessment of the challenges influencing the adoption of smart building technologies

  • 1. Architectural Department College of Engineering and Information Technology - Onaizah Colleges, Onaizah, Saudi Arabia

  • 2. College of Engineering & Design, Kingdom University, Manama, Bahrain

  • 3. Faculty of Engineering, Minia University, Minia, Egypt

  • 4. Architectural Engineering and Construction Management Department, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia

  • 5. Interdisciplinary Research Center for Smart Mobility and Logistics, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia

  • 6. Interdisciplinary Research Center of Construction and Building Materials, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia

  • 7. Department of Architecture, The Higher Institute for Engineering and Technology, Obour City, Egypt

Abstract

Introduction: Over the past few decades, there has been an increasing focus on Smart Building Projects (SBP) and the technologies associated with them. Numerous studies have been conducted globally to define smart building technologies (SBT), identify challenges, and explore areas for improvement. This study aims to examine the concept and terminology of SBT and the expertise and experience of participants in SBP in the Arab Gulf countries, specifically Saudi Arabia. The study also investigates the challenges faced by SBT throughout its life cycle.

Methods: To identify and assess the challenges affecting the adoption of smart building technologies. This approach included a literature review, pilot-testing, and a questionnaire survey. The survey targeted a sample of 90 architects/engineers, managers, and contractors.

Results: A total of 55 challenges were identified and categorized into four groups, corresponding to the key phases of the project life cycle. These phases include the programming and feasibility analysis phase, design phase, installation and commissioning phase, and operation and maintenance phase. The findings of this research expand the body of knowledge by providing architects/engineers, managers, and contractors in the architecture, engineering, construction, and facility management (AEC/FM) industry with insights into the influential challenges related to the adoption of SBT. In conclusion, this study sheds light on the concept and terminology of smart building technologies and explores the challenges faced by SBT during its life cycle. By identifying and categorizing these challenges, the study provides valuable information to AEC/FM practitioners, enabling them to overcome obstacles and improve the adoption of SBT.

1 Introduction

The purpose of buildings is to fulfill the requirements and preferences of their inhabitants, with an increasing focus on enhancing comfort within the living environment (). The planning of building systems holds a pivotal position in elevating user contentment and the overall standard of living (). Smart buildings, in particular, have surfaced as a method to enhance the efficiency, safety, and comfort of users’ lives (). The phrase “smart building” made its debut in 1981 when the United Technology Building Systems (UTBS) Corporation in the United States first introduced the concept. Their emphasis was on employing building automated systems (BMS) for the regulation of security and HVAC systems. A notable milestone occurred in 1983 with the construction of the City Place building in the United States, which was proudly marketed as the world’s inaugural intelligent building (; ). Essentially, a smart building integrates various systems such as HVAC, power management, lighting, security, safety, and shared networks to efficiently manage resources and enhance building performance (). It combines the best available technologies, designs, materials, and systems to improve occupants’ lives and provide cost-effective environments (). Smart buildings leverage technology to enhance building services and operations for the benefit of users (Ghansah et al., 2020). They aim to provide a dynamic infrastructure that optimizes energy efficiency, flexibility, cost, and comfort (). The concept of smartness in buildings encompasses characteristics such as green energy, zero emissions, space flexibility, population health, and working efficiency (). Smart buildings are described as equipped buildings with interconnected sensors, communication networks, and controllable devices (). They are also defined as flexible buildings that interact and connect with the ecosystem while generating and storing energy (). The aim of smart building technologies is to reduce energy consumption and improve comfort conditions and human welfare (; ).

Recent definitions of smart buildings focus on the adoption of structure connectivity solutions (SCS) to address various building systems, including security, data networking, and environmental control (). Designers of smart buildings should consider a range of smart building technologies and user characteristics, adopting a “respondents-oriented” approach (). However, the definition of intelligent buildings remains ambiguous, with diverse definitions across different countries (). Initially, early definitions primarily focused on automated functionalities, but subsequently, newer definitions have broadened their scope to encompass additional aspects. During the 1990s, the concept of smart buildings evolved to emphasize the integration of building occupants, intelligent systems, and environmental considerations to elevate the overall quality of life. Within the body of literature dedicated to smart buildings, there is a general consensus on three key defining characteristics: the incorporation of technology, the delivery of services, and the capacity to fulfill user requirements (; ; ). The core technologies of a smart building encompass hardware and software components, including sensors and home appliances. Sensors, whether physical devices or technological tools, detect changes in human behavior and environmental challenges (; ; ; ). By integrating sensors into household equipment and connecting them through wired or wireless systems, residents’ habits during activities such as watching television, cooking, sleeping, and cleaning can be observed and tracked (). The system, consisting of a variety of appliance and sensor configurations, facilitates a wide range of tailored tasks and services to meet the needs of the inhabitants (; ; ). A smart building can be defined as a dwelling equipped with sensors and connected domestic devices that form a communication network, providing lifestyle support (; ). In essence, a smart building integrates smart devices and sensors into an intelligent system that provides management, surveillance, assistance, and responsive services. This convergence yields a multitude of advantages spanning diverse areas, including the economy, society, health, emotional wellbeing, sustainability, and security, among others (; ).

In the last 30 years, numerous institutions around the world have undertaken comprehensive research to define and gain insight into smart building projects (SBPs) along with their fundamental principles and objectives (; ). Thus, this study aims to enhance the knowledge regarding the challenges and barriers that SBTs may face, providing valuable insights for stakeholders to promote effective SBT implementation in the big cities of the Arab Gulf ().

Sustainable and smart building is a growing trend that is catching on in public opinion and making its way into the agendas of researchers and city authorities worldwide. Indeed, 5G technology can significantly impact building construction, operation, and management by providing high-quality services and efficient functionalities. Singapore is one of the top smart cities in the world and among the first countries to adopt 5G technology in various sectors, including smart buildings. This article discusses the international trends in 5G applications for smart buildings, R&D, and test-bedding works conducted in 5G labs. It also reviews 5G technology development, use cases, applications, and future projects supported by the Singapore government. Lastly, the study discusses 5G use cases for smart buildings and building environment improvement applications. This research can serve as a benchmark for researchers and industries for future progress and development of smart cities in the context of big data ().

Large amounts of data are generated daily by sub-meters and smart sensors in residential buildings. Properly leveraging this data could help end users, energy producers, and utility companies in identifying unusual power consumption and understanding the causes of each anomaly ().

Currently, analyzing, detecting, and visualizing unusual power consumption patterns of households are some of the main challenges in finding ways to decrease power usage ().

Smart cities strive to achieve their net-zero emissions targets by minimizing wasted energy, enhancing grid stability, and fulfilling service demand. This is achievable by adopting advanced energy systems that utilize artificial intelligence, the Internet of Things (IoT), and communication technologies to gather and analyze large amounts of data in real time, thus efficiently managing city services. However, training machine learning algorithms to perform various energy-related tasks in sustainable smart cities presents a difficult data science challenge.

2 Research methodology

To examine the hindrances and possible remedies related to the adoption of smart building technologies, a research methodology was implemented, encompassing both qualitative and quantitative methodologies. This research approach encompassed the following steps: as shown in

Figure 1

.

  • 1. Literature Review: To acquire an understanding of the challenges that smart building technologies encounter across their life cycle, a thorough examination of pertinent literature was conducted. In total, 55 challenges were pinpointed and sorted into four primary categories aligning with the various life cycle phases: programming and feasibility, design, installation and commissioning, and operation and maintenance.

  • 2. Questionnaire Development: A Likert-scale questionnaire with five points was created to gauge the level of severity associated with the identified challenges. The term “severity” here denotes the influence of each challenge on the adoption of smart building technologies. A pilot test was executed, involving five participants from each relevant discipline, to assess the validity, comprehensiveness, and readability of the identified challenges. Subsequently, a questionnaire comprising 55 questions was formulated and distributed among professionals encompassing architects, engineers, constructors, facility managers, architects, and developers who are actively engaged in the domain of smart building projects in Saudi Arabia. The primary objective of this questionnaire was to delineate the principal challenges faced by smart building projects in Saudi Arabia.

  • 3. Survey Administration: The pilot-tested questionnaire survey was administered to a targeted sample of 90 architecture/engineering/construction/facilities management (AE/C/FM) practitioners in Riyadh, Saudi Arabia. The sample comprised 30 architects/engineers (A/Es), 30 facilities managers, and 30 contractors. The selection of respondents was based on their years of experience and the nature of the projects they had been involved in. Table 1 provides an overview of the general information of the respondents.

  • 4. Tabulation and Analysis: The relative challenging index (RCI) was calculated for each factor to determine its importance rating. The RCI is a percentage parameter based on a weighted mean, commonly used to quantify the significance of Likert-scaled questions (). It serves as an analytical method for prioritizing influential variables in professional practices, particularly in the construction industry (; ). In this research, the RCI was adopted to rank the challenges according to their relative importance as perceived by the respondents of the questionnaire survey. Both group and overall rankings were determined to identify the most important challenges within each group and across all groups of challenges.

FIGURE 1

TABLE 1

ParameterA/Es Frequency (n = 30)%Contractors Frequency (n = 30)%Facilities managers Frequency (n = 30)%
Years of experience
1–5 years516.66826.66516.66
6–10 years1240.00723.331136.66
11–15 years723.33930.00930.00
More than 15 years620.00516.66516.66
Being involved in designing or constructing smart building systems2376.002480.002686.66

Profile of the AE/C/FM respondents.

Note(s): A/Es, Architects/Engineers.

Through the execution of this extensive research methodology, the study sought to collect valuable data concerning the obstacles related to the adoption of smart building technologies and to evaluate their level of severity as perceived by AE/C/FM practitioners in Riyadh, Saudi Arabia. Table 1 furnishes details about the demographic characteristics of the respondents, specifically architects/engineers (A/Es), contractors, and facilities managers. The data encompass the frequency and percentage of respondents in each category, stratified by their years of experience and their engagement in the design or construction of smart building systems (; ).

Figure 2 illustrates the dispersion of participants within each group categorized by their years of experience. It provides data on the count and proportion of respondents falling into various experience brackets, including 1–5 years, 6–10 years, 11–15 years, and over 15 years. Furthermore, the table also displays the percentage of respondents who indicated their involvement in the design or construction of smart building systems, which is notably high across all three groups ().

FIGURE 2

).

3 The literature review

The purpose of this article is to examine and evaluate the challenges that impact smart building technologies (SBTs) in the Arab Gulf States across their entire life cycle, spanning four crucial phases: the conceptual planning and feasibility study phase, the design and engineering phase, the construction phase, and the operation and maintenance phase (). The following is a review of the existing literature and pilot testing; a total of 55 challenges that influence the adoption of smart buildings throughout their life cycle were identified. These challenges were categorized within the aforementioned four key phases, and their descriptions are presented in the following overview ().

3.1 Challenges pertaining to the programming and feasibility analysis phase

The integration of smart building technologies can be affected by a range of challenges that arise during the programming and feasibility analysis phase. These 22 challenges have the potential to influence the decision-making procedures of stakeholders and organizations contemplating the adoption of smart building technologies. The following is an overview of the 22 challenges within the programming and feasibility analysis phase that have the potential to impact the adoption of smart building technologies:

  • A. The lack of a clear definition of smart buildings, a smart building is a structure that integrates advanced technologies and systems to enhance its performance, functionality, and sustainability ().

  • B. The lack of a clear taxonomy for smart buildings, a clear taxonomy for smart buildings, or the organization of their various components and subsystems, is currently lacking in the field ().

  • C. The lack of identified basic dimensions of smart buildings, the absence of identified basic dimensions of smart buildings contributes to the difficulty in defining and assessing their performance ().

  • D. The lack of design standards of smart buildings, the lack of design standards for smart buildings can create challenges in the development and construction of these buildings ().

  • E. The lack of sustainability measures for smart buildings, the lack of sustainability measures for smart buildings refers to the absence of clear and agreed-upon criteria for evaluating the environmental performance of smart buildings (, ; ; ).

  • F. The lack of automated evaluation schemes of smart building design, the lack of automated evaluation schemes for smart building design is an important challenge in the field ().

  • G. The lack of knowledge and expertise of smart building systems, the lack of knowledge and expertise in smart building systems is a significant challenge that can hinder the successful implementation and operation of smart buildings ().

  • H. The lack of understanding of users’ needs for smartness, the lack of understanding of users’ needs for smartness in the context of smart buildings is a significant challenge that can impact the adoption and effectiveness of these technologies ().

  • I. The lack of historical databases of existing smart buildings’ performance, the lack of historical databases of existing smart buildings’ performance is indeed a challenge that can hinder the advancement and optimization of smart building technologies (, ).

  • J. The lack of regulations on a vision for achieving a specific level of smartness, the lack of regulations regarding a specific level of smartness for smart buildings is indeed a challenge that can impact the widespread adoption and integration of smart technologies (, ).

  • K. Simplify technical jargon: Smart building technologies often come with complex technical terminology that can be overwhelming for consumers (, ).

  • L. The lack of specialized and qualified suppliers and manufacturers for smart building systems, the lack of specialized and qualified suppliers and manufacturers for smart building systems is indeed a challenge that can hinder the widespread adoption and implementation of these technologies (, ).

  • M. The cost of human technical expertise is relatively high over the benefits of smart buildings, smart buildings can come at a significant cost. Here are a few challenges that contribute to the relatively high cost: specialized skillset: designing, implementing, and maintaining smart building systems (, ).

  • N. The total cost of ownership of smart buildings is unclear or relatively forecasted as a high investment, the total cost of ownership of smart buildings is unclear or relatively forecasted as a high investment due to several challenges.

  • O. The lack of motivational regulations on the choice and implementation of smart buildings, these buildings incorporate advanced technologies and design features that make them more energy efficient and environmentally sustainable ().

  • P. The lack of provision of insights into smart building impacts (positive or negative) to policymakers, a lack of understanding may cause policy-makers to overlook the potential benefits and opportunities that smart buildings offer, resulting in missed opportunities to promote sustainability and energy efficiency.

  • Q. The insufficient basis of stating users’ needs and requirements, without information about users and requirements, it is hard for companies and designers to create products or buildings that meet their customers’ expectations.

  • R. The difficulty in forecasting the selected systems’ cycles of upgradeability and the changes of their technologies, it is important to choose systems that will last and be able to adapt to new technologies. However, it can be difficult to know exactly when and how these changes will happen, making it challenging to plan and budget for them.

  • S. Smart buildings are not self-sufficient; there are performance risks based on dependability on specific energy sources (no power, no smartness), if there is a disruption in the energy supply, the smart features in these buildings may not function properly. This can lead to decreased efficiency and potential issues.

3.2 Challenges pertaining to the design phase

In the process of implementing smart building technology, the design phase presents several challenges that demand careful attention. These challenges have the potential to affect the effective design and incorporation of smart building systems. The following is an overview of the 11 challenges typically associated with the design phase of smart building technology.

  • a. The lack of descriptive guidelines for the design of different systems in smart buildings, there may not be enough information or clear instructions on how to design the various systems in a smart building ()

  • b. The technological lack of systems integration and interoperability capabilities, there may not be enough availability of resources or tools for making different systems work together and communicate with each other in smart buildings.

  • c. The lack of available visions of principal directions for the design thinking of smart buildings, this can make it difficult for architects and engineers to create a building that meets the needs and expectations of those who will use it.

  • d. The lack or absence of authoritative action plans to manage the design process of smart building projects, without these plans, it can be difficult to make sure that the building is designed in a way that meets the goals and requirements of the project.

  • e. The lack of measures to maintain the privacy and data security of users, there should be enough rules or systems in place to protect the personal information and privacy of those who use smart buildings.

  • f. The lack of regulations to maintain the privacy and data security of users, if there are not enough regulations to maintain privacy and data security, this could lead to unauthorized access to personal information, identity theft, and other serious issues.

  • g. The complexity of the design process, the complexity can also lead to increased costs and delays in the construction process. Having better resources and tools to simplify the design process would help make it easier to create smart buildings that meet all the necessary standards and requirements. (, )

  • h. The inability of specifying qualified and quality local manufacturers. Even if qualified and quality manufacturers are available, it can be challenging to find the right products for the building or the information and resources needed to identify and work with these local manufacturers. (, , )

  • i. The lack of distinguishing between the smartness requirements of owners, users, operators, and facility managers, the owners, users, operators, and facility managers may all have different ideas about what makes a building “smart” and how it should function.

  • j. The lack of understanding of the basis of design responsiveness of occupational health and safety precautionary measures from a technological point of view, many advanced technologies and systems in smart buildings can help keep the respondents safe and healthy, but designers and builders may not understand how to incorporate these technologies effectively ().

  • k. The lack of specification of protection ratings and testing of systems, materials, and components, without standards for testing and rating the safety and protection of the systems, materials, and components used in smart buildings, it can be difficult to know whether the building and its various parts are safe and reliable. (, )

3.3 Challenges pertaining to the installation and commissioning phase

The following is an overview of the 9 challenges commonly associated with the installation and commissioning phase in various industries:

  • a. Smart building projects are subject to scope variations that result in an excessive increase of budgets allocated, the accurate design of smart buildings is difficult, as is estimating the cost of the project and staying within budget. This can lead to delays and other complications.

  • b. Smart building projects are subject to variations that result in an excessive increase of time allocated, the construction and design of smart buildings often involve changes that can lead to an increase in the time allocated for the project. (, )

  • c. The lack of logistical support/logistical challenges for procuring smart systems, this indicates that logistical issues may make it difficult to procure the tools, supplies, and systems required for smart buildings. (, )

  • d. The lack of experience in testing smart behaviors and systems, this indicates that the testing of intelligent systems and behaviors in intelligent buildings lacks knowledge and skill.

  • e. The lack of well-trained labor that can work on smart buildings, this indicates that there is a lack of trained and experienced professionals who can operate on smart buildings. (, )

  • f. The lack of systems’ compatibility with domestic utilities and national information and communication technologies and services, this implies that certain systems or equipment might not function properly with the country’s current technology and services. Users may find it challenging to use and link them appropriately as a result of this.

  • g. The lack of expertise, support services, and skills for installation and commissioning, it is important to make sure the technology is compatible with existing systems and that there are professionals with the right expertise to help with any installation and support.

  • h. The high costs of devices and installations, due to the high costs of devices and installations, purchasing and configuring the equipment required for smart buildings may be prohibitively expensive (, ).

  • i. The requirement of high cash flow and financing for smart building projects, the start-up and completion of smart building projects may require significant funding. This might entail both having enough cash on hand and having the ability to borrow money if necessary (, , ).

3.4 Challenges pertaining to the operation and maintenance phase

There are several challenges that need to be considered. These challenges can impact the successful operation and maintenance of smart building systems.

  • a. The operations and maintenance costs (OPEX) are relatively high compared to regular buildings, it costs more to run and maintain smart buildings compared to regular buildings. This includes costs for aspects such as repairs and energy consumption.

  • b. The absence of operations and maintenance teams during early project phases means a lot of risks evolve during the operation and maintenance phase, during the initial phases of the project, a team should be in place to handle the maintenance and upkeep of smart buildings.

  • c. The need to reduce replacement cycles of systems, it is crucial to find solutions to extend the lifespan of the technology employed in these buildings if we want to limit the number of times that systems need to be replaced ().

  • d. The lack of skilled and specialized maintenance and operation technicians, it is important to make sure there are enough skilled technicians available and to provide training and education to help them become specialized in this area. (, , , , , )

  • e. Lack of ensured guaranties and warranties, this could make it difficult for the users to get help if something goes wrong or to be confident in the quality of the technology they are using.

  • f. There is a continuous change in operation and maintenance requirements, which affects systems’ effectiveness, for the systems to remain effective and efficient, they should be adapted and adjusted as needed to ensure they can still perform well even as changes occur.

  • g. Reliability (smart building systems must aim to be robust), to ensure the best possible reliability, there must be high-quality components, regular maintenance should be regularly performed, and systems should be closely monitored.

  • h. The changing demand for security that affects systems’ effectiveness, this has an impact on how well systems operate and perform. It is crucial to be flexible and modify systems as necessary to satisfy shifting security requirements.

  • i. The changing demand for privacy that affects systems’ effectiveness, this has an impact on the effectiveness of systems in various industries. There are increasing concerns about data protection and privacy regulations.

  • j. The changing functional requirements for controlling and monitoring capabilities, the changing functional requirements for controlling and monitoring capabilities refer to the evolving needs of organizations to manage and oversee their operations, products, and services (, , ).

  • k. The social implications of the accessibility of smart technologies (e.g., elderly use of technologies, gender requirements), the social implications of the accessibility of smart technologies include improving the lives of elderly individuals and individuals with disabilities.

  • l. The lack of understanding of human–smart systems interactions and behaviors (involvement of virtual reality, augmented reality, and responsive intelligibility), the lack of understanding of human–smart systems interactions and behaviors, including the involvement of virtual reality, augmented reality, and responsive intelligibility, is indeed a complex challenge. (, , )

4 Assessment of the challenges affecting the adoption of smart building technologies

4.1 Data collection

A questionnaire survey was created employing a five-point Likert scale to evaluate the significance of the 55 challenges, as detailed in Table 2. The participants, comprising AE/C/FM practitioners located in Riyadh City, Saudi Arabia, were tasked with assigning importance ratings to each of the factors. The rating options included “Extremely challenging” (4), “Very challenging” (3), “challenging” (2), “Somewhat challenging” (1), and “Not challenging” (0). The ratings were determined according to the perceived influence of each challenge on the capacity to adhere to project schedules, financial limitations, and investor anticipations related to work excellence. It was presumed that client requisites had already been addressed and integrated during the architectural programming phase, with an emphasis on the long-term robustness and excellence of the construction. The survey garnered responses from a total of 90 professionals, with equal representation from architects/engineers (A/Es), contractors, and facilities managers, with each group encompassing 30 respondents.

TABLE 2

No.ChallengesReferences
G1Challenges pertaining to the programming and feasibility analysis phase
1The lack of clear definition of smart buildings;
2The lack of clear taxonomy of smart buildings
3The lack of identified basic dimensions of smart buildings
4The lack of design standards of smart buildings
5The lack of sustainability measures for smart buildings
6The lack of automated evaluation schemes of smart building designs
7The lack of knowledge and expertise of smart building systems
8The lack of understanding of users’ needs for smartness
9The lack of historical databases of existing smart buildings’ performance
10The lack of historical feasibility assessments of smart building systems
11The lack of regulations on a vision for achieving a specific level of smartness
12The limited demand from consumers for smart buildings
13The lack of awareness by consumers (e.g., designers, owners, and users) of the benefits of smart buildings
14The lack of consumers’ (e.g., designers, owners, and users) awareness of the technical specifications of smartness
15The lack of specialized and qualified suppliers and manufacturers for smart building systems
16The cost of human technical expertise is relatively high compared to the benefits of smart buildings
17The total cost of ownership of smart buildings is unclear or relatively forecasted as a high investment
18The lack of motivational regulations on choice and implementation of smart buildings
19The lack of provision of insights into capabilities of smart building impacts (positive or negative) to policymakers
20The insufficient basis of stating users’ needs and requirements
21The difficulty of forecasting the selected systems’ cycles of upgradeability and the changes of their technologies
22Smart buildings are not self-sufficient; there are performance risks based on dependability on specific energy sources (no power, no smartness)
G2Challenges pertaining to the design phase
1The lack of descriptive guidelines for the design of different systems in smart buildings;
2The technological lack of systems integration and interoperability capabilities
3The lack of available visions for principal directions for design thinking of smart buildings
4The lack or absence of authoritative action plans to manage the design process of smart building projects; ;
5The lack of measures to maintain the privacy and data security of users;
6The lack of regulations to maintain the privacy and data security of users,
7The complexity of the design process;
8The inability of specifying qualified and quality local manufacturers
9The lack of distinguishing between the smartness requirements of owners, users, operators, and facility managers; ;
10The lack of understanding of the basis of design responsiveness of occupational health and safety precautionary measures from a technological point of view; ;
11The lack of specification of protection ratings and testing of systems, materials, and components; ;
G3Challenges pertaining to the installation and commissioning phase
1Smart building projects are subject to scope variations that result in an excessive increase of budgets allocated;
2Smart building projects are subject to variations that result in an excessive increase of time allocated; ; ;
3The lack of logistical support/logistical challenges for procuring smart systems; ;
4The lack of experience in testing smart behaviors and systems;
5The lack of well-trained labor that can work on smart buildings
6The lack of systems’ compatibility with domestic utilities and national information and communication technologies and services
7The lack of expertise, support services, and skills for installation and commissioning
8The high costs of devices and installations;
9The requirement of high cash flow and financing for smart building projects; ;
G4Challenges pertaining to the operation and maintenance phase
1The operations and maintenance costs (OPEX) are relatively high compared to regular buildings; ;
2The absence of operations and maintenance teams during early project phases means a lot of risks evolve during the operation and maintenance phase; ;
3The need to reduce replacement cycles of systems
4The need to reduce replacement cycles of systems; ;
5The lack of skilled and specialized maintenance and operation technicians; ;
6The lack of ensured guaranties and warranties; ; ;
7There is a continuous change in operation and maintenance requirements, which affects systems’ effectiveness;
8There is a continuous change in users’ lifestyles and behaviors;
9Reliability (smart building systems must aim to be robust); ; ;
10The changing demand for security that affects systems’ effectiveness;
11The changing functional requirements for controlling and monitoring capabilities,
12The social implications of the accessibility of smart technologies (e.g., elderly use of technologies, gender requirements), ,
13The lack of understanding of human–smart systems interactions and behaviors (involvement of virtual reality, augmented reality, and responsive intelligibility);

Challenges facing the adoption of smart building technologies (SBTs) in previous studies.

4.2 Data analysis

The obtained data from the four groups of respondents were tabulated and analyzed, separately and collectively. The relative challenge index (RCI) was calculated for each factor, using the following equation (1):

Where:

i: Response category index.

a_i: Weight given to i response.

x_i: Variable expressing the frequency of (i).

To calculate the RCI, the appropriate values for the weights (a_i) and frequencies (x_i) need to be substituted into the equation. The weights (a_i) represent the importance or significance assigned to each response category, and the frequencies (x_i) represent the number of occurrences or observations for each category, as listed in Table 3 (Figure 3) (; ; ; ; ).

TABLE 3

Challenging ratingWeight (ai)Scale (%)
Extremely challenging (x0)487.5–100
Very challenging (x1)362.5–87.5
Challenging (x2)237.5–62.5
Somewhat challenging (x3)112.5–37.5
Not challenging (x4)00–12.5

The adopted weighting and scale of interpretation for each challenging rating.

FIGURE 3

).

Based on the ranking of the challenges, the correlation among the three groups of respondents was analyzed to determine their level of agreement on the importance of the challenges. Spearman’s coefficient of rank correlation was used to determine the level of agreement on the importance of the challenges. The analysis of the agreement was performed through three-paired comparisons, namely, A/Es and contractors, A/Es and facilities managers, and contractors and facilities managers (). The following equation was used to calculate the Spearman’s coefficient of rank correlation: as shown in Table 4

TABLE 4

Paired comparisonsInterpretation of the level of correlation
A/Es and contractors0.43Moderate positive correlation
A/Es and facility managers0.77Moderate positive correlation
Facility managers and contractors0.41Moderate positive correlation

Correlation among the groups of respondents.

Where:

Spearman’s coefficient of rank correlation.

Sum of the squared differences in ranks of the paired comparison.

Number of parameters for which the ranking is made ().

A summary of Figures 47 showcasing the relative challenge index (RCI) as a percentage pertaining to different phases of smart building projects is provided. These phases encompass the programming and feasibility analysis phase comprising 22 challenges, the design phase comprising 11 challenges, the installation and commissioning phase comprising 9 challenges, and the operation and maintenance phase comprising 13 challenges. Over recent decades, smart building projects have garnered substantial attention, leading to a multitude of studies aimed at establishing global definitions for smart building technologies (SBTs), recognizing the challenges encountered, and identifying areas for enhancement. The study highlighted here centered on the examination of the concept and terminology associated with SBTs, in addition to the proficiency and hands-on experience of individuals engaged in smart building projects within Saudi Arabia. Moreover, the study sought to determine the features, challenges, and hindrances encountered by SBTs throughout their entire life cycle. While the specific challenges within the Figures are not specified, it can be inferred that the RCI reflects the relative level of complexity or challenge associated with each phase.

FIGURE 4

).

FIGURE 5

).

FIGURE 6

; ).

FIGURE 7

; ).

5 Findings and discussion

Table 5 illustrates the findings of the assessment. It presents the RCI, challenge rating, challenge group ranking, and overall ranking of each challenge.

TABLE 5

No.Challenges affecting the adoption of smart building technologies in Saudi ArabiaA/EsContractorsFMsOverall
RCICRCGRORRCICRCGRORRCICRCGRORRCICRCGROR
Challenges pertaining to the programming and feasibility analysis phase
C1The lack of clear definition of smart buildings56.67C193883.33VC3669.17VC92069.72VC920
C2The lack of clear taxonomy of smart buildings60.83C183679.17VC51172.5VC71670.83VC718
C3The lack of identified basic dimensions of smart buildings45.83C214866.67VC112250.83C204854.44C2143
C4The lack of design standards of smart buildings54.17C204165.83VC132560C133260C1734
C5The lack of sustainability measures for smart buildings66.67VC163066.67VC122356.67C173763.34VC1428
C6The lack of automated evaluation schemes of smart building design68.33VC142372.5VC81756.67C183865.83VC1123
C7The lack of knowledge and expertise of smart building’ systems71.67VC172264.17VC152857.5C143564.45VC1326
C8The lack of understanding users’ needs for smartness67.5VC152964.17VC162965VC112465.56VC1224
C9The lack of historical databases of existing smart buildings’ performance91.67EC2271.67VC91878.33VC5880.56VC59
C10The lack of historical feasibility assessments of smart building systems79.17VC61379.17VC71085VC3581.11VC48
C11The lack of regulations on a vision for achieving a specific level of smartness64.17VC173270.83VC101970VC81868.33VC1021
C12The limited demand from consumers for smart buildings70.83VC122352.5C184150C214957.78C1938
C13The lack of awareness by consumers (e.g., designers, owners, and users) of the benefits of smart buildings71.67VC102146.67C204453.33C194457.22C2039
C14The lack of consumers’ (e.g., designers, owners, and users) awareness of the technical specifications of smartness93.33EC1183.33VC4886.67VC2487.78VC24
C15The lack of specialized and qualified suppliers and manufacturers for smart building systems42.5C225045C214645C225344.17C2250
C16The cost of human technical expertise is relatively high compared to the benefits of smart buildings88.33EC4785VC2582.5VC4785.28VC36
C17The total cost of ownership of smart buildings is unclear or relatively forecasted as a high investment90EC3488.33EC1389.17EC1189.17VC11
C18The lack of motivational regulations on choice and implementation of smart buildings77.5VC71546.67C204454.17C184059.45C186
C19The lack of provision of insights into smart building impacts (positive or negative) to policymakers69.17VC132760C173256.67C163861.95C1531
C20The insufficient basis of stating users’ needs and requirements79.17VC61265.83VC142564.17VC122869.72VC920
C21The difficulty of forecasting the selected systems’ cycles of upgradeability and the changes of their technologies71.67VC112073.33VC71673.33VC61472.78VC615
C22Smart buildings are not self-sufficient; there are performance risks based on dependability on specific energy sources (no power, no smartness)75VC81845C224765.83VC102261.94C1632
Challenges pertaining to the design phase
C23The lack of descriptive guidelines for the design of different systems in smart buildings70.83VC32460.83C53166.67VC22166.11VC322
C24The technological lack of systems integration and interoperability capabilities33.33C115532.5SC115439.17C115535SC1155
C25The lack of available visions for principal directions for design thinking of smart buildings54.17C74255C63854.17VC64154.45C742
C26The lack or absence of authoritative action plans to manage the design process of smart building projects45.83C104953.33C83954.17VC74251.11C946
C27The lack of measures to maintain the privacy and data security of users78.33VC31480.83VC1976.67VC11078.61VC111
C28The lack of regulations to maintain the privacy and data security of users76.67VC21779.17VC21262.5VC33072.78VC216
C29The complexity of the design process70VC42663.33VC43053.33C94562.22C530
C30The inability of specifying qualified and quality local manufacturers50.83C84447.5C104346.67C105148.33C1048
C31The lack of distinguishing between the smartness requirements of owner, users, operators, and facility managers59.17C63753.33C84055C53955.83C641
C32The lack of understanding of the basis of design responsiveness of occupational health and safety precautionary measures from a technological point of view64.17VC53370.83VC32059.17C43464.72VC425
C33The lack of specification of protection ratings and testing of systems, materials, and components50.83C94555C73854.17C84253.33C845
Challenges pertaining to the installation and commissioning phase
C34Smart building projects are subject to scope variations that result in an excessive increase of budgets allocated89.17EC2689.17EC1178.33VC2985.56VC25
C35Smart building projects are subject to variations that result in an excessive increase of time allocated70.83VC42550C44265VC42561.94C432
C36The lack of logistical support/logistical challenges for procuring smart systems55C63935.83SC65160C73350.28C647
C37The lack of experience in testing smart behaviors and systems65VC53137.5C55065VC52655.83C540
C38The lack of well-trained labor that can work on smart buildings50.83C74833.33SC85353.33C84645.83C749
C39The lack of systems’ compatibility with domestic utilities and national information and communication technologies and services37.5C85334.17SC75241.67C95437.78C954
C40The lack of expertise, support services, and skills for installation and commissioning36.67SC95430SC95564.17VC62943.61C851
C41The high costs of devices and installations90EC1589.17EC2288.33VC1289.17EC11
C42The requirement of high cash flow and financing for smart building projects83.33VC31068.33VC32173.33VC31575VC314
Challenges pertaining to the operation and maintenance phase
C43The operations and maintenance costs (OPEX) are relatively high compared to regular buildings90.83VC1386.67VC1487.5VC1388.33VC13
C44The absence of operations and maintenance teams during early project phases means a lot of risks evolve during the operation and maintenance phase55C94057.5C103565VC92759.17C936
C45The need to reduce replacement cycles of systems54.17C104359.17C83360.83C83158.06C1037
C46The lack of skilled and specialized maintenance and operation technicians41.67C125142.5C124845.83C135243.33C1252
C47The lack of ensured guaranties and warranties63.33VC73456.67C113670VC71963.33VC829
C48There is a continuous change in operation and maintenance requirements, which affects systems’ effectiveness62.5VC83565VC72765.83VC82364.44VC727
C49There is a continuous change in users’ lifestyles and behaviors77.5VC51679.17VC31376.67VC31177.78VC412
C50Reliability (smart building systems must aim to be robust)40C135240C134948.33C125042.78C1353
C51The changing demand for security that affects systems’ effectiveness88.33EC2875.83VC51572.5VC61778.89VC310
C52The changing demand for privacy that affects systems’ effectiveness80VC41179.17VC41474.17VC51377.78VC412
C53The changing functional requirements for controlling and monitoring capabilities50C114758.33C93453.33C114753.89C1144
C54The social implications of the accessibility of smart technologies (e.g., elderly use of technologies, gender requirements)84.17VC3983.33VC2883.33VC2683.61VC27
C55The lack of understanding of human–smart systems interactions and behaviors (involvement of virtual reality, augmented reality, and responsive intelligibility)74.17VC61966.67VC62475.83VC41272.22VC617

Assessment of challenges affecting the adoption of smart building technologies in Saudi Arabia (ref. author).

Notes: c, challenging; A/Es, architects/engineers; FMs, facilities managers; RCI, relative challenge index (%); CR, challenge rating; CGR, challenge group ranking; OR, overall ranking; EC, extremely challenging; EC, very challenging; and C challenging.

5.1 Programming and feasibility analysis phase

This category encompasses 22 challenges. Among these, the respondents identified “The total cost of ownership of smart buildings is unclear or relatively forecasted as a high investment” as the most critical factor and assigned it a rating of “Very Challenging.” The authors concur with this evaluation as many respondents tended to perceive a smart building as being at the forefront of technology. However, in reality, a smart building is characterized by its capacity to seamlessly and efficiently integrate various categories and types of diverse technologies. This discovery aligns with the findings of other studies as well (; ). “The lack of consumers” (e.g., designers, owners, and users) awareness of the technical specifications of smartness” was rated “Very Challenging” and was ranked first by A/Es and second by facility managers. This finding is also in agreement with the outcomes of different studies (; ; ).

This is a reasonable assertion as awareness levels are also contingent on several challenges, including the accessibility of information. The findings reveal that A/Es ranked “The lack of historical databases of existing smart buildings’ performance” as the second most crucial challenge in this phase, attributing it an “Extremely Important” importance rating. The authors concur with this evaluation as comprehending the concept of smart buildings is a fundamental step in gaining a better grasp of smart buildings, and the historical databases related to this concept remain ambiguous, lacking a well-defined framework.

5.2 Design phase

This category encompasses 11 challenges, as outlined in Table 3. A/Es, contractors, and facilities managers all identified “The lack of measures to maintain the privacy and data security of users” as the most critical challenge during this phase, assigning it a rating of “Very Challenging” in terms of importance. The authors concur with these assessments as a substantial number of respondents were driven to transition to smart technologies due to their notable advantages in enhancing efficiency, curbing energy expenses, and furnishing analytics that underpin environmentally sustainable initiatives. Nevertheless, the more technology a business integrates, the more exposed it becomes to potential data breaches (; ). “The lack of descriptive guidelines for the design of different systems in smart buildings” was rated second by facilities managers and third by A/Es, with an importance rating of “Very Challenging.” This is justified, since acquiring users with the needed information of smart features is a vital aspect of persuading them to adopt smart building technologies ().

5.3 Installation and commissioning phase

This group consists of 9 challenges. As shown in Table 2, most of the challenges that face implementing smart building technologies in Saudi Arabia during installation and commissioning phase are due to the high costs of devices and installations. This finding is also in agreement with the outcomes of different studies (; ). The secondary source of challenges encountered during the installation and commissioning phase relates to “scope variations in smart building projects that lead to significant budget overruns.” This can be rationalized by the absence of a facility management team at this stage and the absence of an all-encompassing framework capable of meeting the objectives related to the life cycle costs of smart building technologies.

5.4 Operation and maintenance phase

This category comprises 13 challenges. The respondents ranked “The operations and maintenance costs (OPEX) are relatively high compared to regular buildings” as the most significant factor in this group, assigning it a “Very Challenging” rating. The authors concur with this evaluation, given that many of the challenges tend to surface during the operation and maintenance phase, often resulting from unresolved and cumulative issues. Contractors and facilities managers identified “The social implications of the accessibility of smart technologies (e.g., elderly use of technologies, gender requirements)" as the second most crucial challenge during this phase, giving it a “Very Challenging” importance rating. This factor was rated third by A/Es, with identical importance ratings. These findings are consistent with previous research (; ; ).

6 Conclusion and recommendations

This study explored the challenges that impact the adoption of smart building technologies throughout their life cycle in Saudi Arabia. Through a combination of a literature review and pilot testing, a total of 55 challenges were identified and subsequently categorized based on their alignment with the life cycle phases, which include the programming and feasibility analysis phase, design phase, installation and commissioning phase, and operation and maintenance phase. To assess the significance of these challenges, a five-point Likert-scale questionnaire survey was developed and pilot tested. This questionnaire served as a valuable tool for quantifying the qualitative research variables that were identified. As a result, it streamlined the process of prioritizing and rating the importance of these challenges with regard to their influence on the execution of smart building technologies in Saudi Arabia. This assessment was primarily focused on understanding the significance of these challenges in terms of their impact on the successful implementation of smart building projects while adhering to specified budget constraints, targeted project durations, and the mandated quality criteria that align with stakeholder expectations.

The evaluation process involved the engagement of three distinct practitioner groups, namely, A/Es, contractors, and facilities managers. Each group provided 30 responses to the questionnaire survey, and these responses were carefully tabulated and analyzed to compute the relative challenge index (RCI) value, rate index percentage, group ranking of challenges, and overall rankings for each factor. Furthermore, an extensive analysis encompassing all 90 responses from all three groups was conducted to ascertain the overall assessment of the challenges. This process also entailed an examination of the consensus among the three groups of respondents.

These challenges are evidently linked to different stages of the project’s life cycle. The results substantiate the interrelation and direct influence of these challenges on the successful execution of these projects, especially within the context of a life cycle. Furthermore, the outcomes from both the comprehensive evaluation and individual assessments align with the discussions and conclusions presented in the existing literature. Remarkably, a high level of consensus regarding the significance of these challenges was evident among all three respondent groups. This underscores the critical importance of all the identified challenges in realizing smart building projects while adhering to the specified time, quality, and budgetary constraints.

Based on the research findings, the following recommendations are proposed to improve the practice of smart buildings:

  • ⁃ Encourage more research and development in smart building technologies for better adoption in Saudi Arabia.

  • ⁃ Provide incentives to real estate developers and building owners to implement smart buildings practices in their projects.

  • ⁃ Develop a comprehensive regulatory framework and standards for the adoption of smart building technologies.

  • ⁃ Promote public awareness and education about the benefits of smart building technologies.

  • ⁃ Foster collaboration between stakeholders, including the public sector, industry, and academia, to promote the adoption of smart buildings practices and technologies.

Statements

Data availability statement

The original contributions presented in the study are included in the article/Supplementary Material, further inquiries can be directed to the corresponding author.

Author contributions

SB: Formal Analysis, Validation, Writing–original draft. AS: Project administration, Visualization, Writing–original draft. MH: Writing–original draft, Formal Analysis, Software, Visualization. AA: Writing–original draft, Investigation, Methodology, Resources. ME: Investigation, Methodology, Resources, Writing–original draft, Writing–review and editing.

Funding

The author(s) declare financial support was received for the research, authorship, and/or publication of this article. The authors would like to acknowledge that this research work was partially financed by Kingdom University, Bahrain, from the research grant number 2023-11-012.

Conflict of interest

The authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

Publisher’s note

All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article, or claim that may be made by its manufacturer, is not guaranteed or endorsed by the publisher.

References

  • 1

    AdelgrenJ. R.BradleyD. T.Mueller-TrapetM.VorlaenderM. (2012). Effect of boundary diffusers in a reverberation chamber: a preliminary investigation. J. Acoust. Soc. Am.132 (3), 1986. 10.1121/1.4755328

  • 2

    AguilarJ.Garces-JimenezA.R-MorenoM. D.GarcíaR. (2021). A systematic literature review on the use of artificial intelligence in energy self-management in smart buildings. Renew. Sustain. Energy Rev.151, 111530. 10.1016/j.rser.2021.111530

  • 3

    AhmedH.EdwardsD. J.LaiJ. H. K.RobertsC.DebrahC.Owusu-ManuD. G.et al (2021). Post occupancy evaluation of school refurbishment projects: multiple case study in the UK. Buildings11 (4), 169184. 10.3390/buildings11040169

  • 4

    AlanneK.SierlaS. (2022). An overview of machine learning applications for smart buildings. Sustain. Cities Soc.76, 103445. 10.1016/j.scs.2021.103445

  • 5

    AlfaloujiQ.SchranzT.FalayB.WilflingS.ExenbergerJ.MattauschT.et al (2023). Co-simulation for buildings and smart energy systems — a taxonomic review. Simul. Model. Pract. Theory126, 102770. 10.1016/j.simpat.2023.102770

  • 6

    AlMuharraqiM.SweisG.SweisR.SammourF. (2022). Factors affecting the adoption of smart building projects in the Kingdom of Bahrain. J. Build. Eng.62, 105325. 10.1016/j.jobe.2022.105325

  • 7

    AlsolamiB. M. (2022). Identifying and assessing critical success factors of value management implementation in Saudi Arabia building construction industry. Ain Shams Eng. J.13 (6), 101804. 10.1016/j.asej.2022.101804

  • 8

    ASRIC (2021). ASRIC J. Eng. Sci.2, 3743.

  • 9

    AttoueN.ShahrourI.YounesR. (2018). Smart building: use of the artificial neural network approach for indoor temperature forecasting. Energies11 (2), 395406. 10.3390/en11020395

  • 10

    Balta-OzkanN.DavidsonR.BicketM.WhitmarshL. (2013). Social barriers to the adoption of smart homes. Energy Policy63, 363374. 10.1016/j.enpol.2013.08.043

  • 11

    BashirM. R.GillA. Q.BeydounG. (2022). A reference architecture for IoT-enabled smart buildings. Springer Nat. Singap.3 (6), 493. 10.1007/s42979-022-01401-9

  • 12

    BelaniD.MakwanaA. H.PitrodaJ.VyasC. M. (2014). Intelligent building new era of todays world. Trends Challenges Civ. Eng. Today‟s Transform. World2014, 116. 10.13140/RG.2.1.1723.4965

  • 13

    BibriS. E. (2021). Data-driven smart eco-cities and sustainable integrated districts: a best-evidence synthesis approach to an extensive literature review. Eur. J. Futur. Res.9 (1), 16. 10.1186/s40309-021-00181-4

  • 14

    Da XuL.HeW.LiS. (2014). Internet of things in industries: a survey. IEEE Trans. Ind. Inf.10 (4), 22332243. 10.1109/TII.2014.2300753

  • 15

    De GrooteM.VoltJ.BeanF. (2017). Is Europe ready for the smart buildings revolution? Mapping smart-readiness and innovative case studies. Available at: www.bpie.eu.

  • 16

    EjidikeC. C.MewomoM. C. (2023). Benefits of adopting smart building technologies in building construction of developing countries: review of literature. SN Appl. Sci.5 (2), 52. 10.1007/s42452-022-05262-y

  • 17

    El-MotasemS.KhodeirL. M.Fathy EidA. (2021). Analysis of challenges facing smart buildings projects in Egypt. Ain Shams Eng. J.12 (3), 33173329. 10.1016/j.asej.2020.09.028

  • 18

    El-RashidyN.El-SappaghS.Riazul IslamS. M.El-BakryH. M.AbdelrazekS. (2021). Mobile health in remote patient monitoring for chronic diseases: principles, trends, and challenges. Diagnostics11 (4), 607632. 10.3390/diagnostics11040607

  • 19

    FabiV.BarthelmesV. M.SchweikerM.CorgnatiS. P. (2017a). Insights into the effects of occupant behaviour lifestyles and building automation on building energy use. Energy Procedia140, 4856. 10.1016/j.egypro.2017.11.122

  • 20

    FabiV.BarthelmesV. M.SchweikerM.CorgnatiS. P. (2017b). Insights into the effects of occupant behaviour lifestyles and building automation on building energy use. Energy Procedia140, 4856. 10.1016/j.egypro.2017.11.122

  • 21

    GadakariT.MushatatS.NewmanR. (2014). Intelligent buildings: key to achieving total sustainability in the Built environment. J. Eng. Proj. Prod. Manag.4 (1), 216. 10.32738/jeppm.201401.0002

  • 22

    GhaffarianhoseiniA.BerardiU.AlWaerH.ChangS.HalawaE.GhaffarianhoseiniA.et al (2016). What is an intelligent building? Analysis of recent interpretations from an international perspective. Archit. Sci. Rev.59 (5), 338357. 10.1080/00038628.2015.1079164

  • 23

    GhansahF. A.Owusu-ManuD. G.AyarkwaJ. (2020). Project management processes in the adoption of smart building technologies: a systematic review of constraints. Smart Sustain. Built Environ.10 (2), 208226. 10.1108/SASBE-12-2019-0161

  • 24

    GhansahF. A.Owusu-ManuD. G.AyarkwaJ.EdwardsD. J.HosseiniM. R. (2021). Exploration of latent barriers inhibiting project management processes in adopting smart building technologies (SBTs) in the developing countries. Constr. Innov.21 (4), 685707. 10.1108/CI-07-2020-0116

  • 25

    HamidaM. B.HassanainM. A.Al-HammadA. M. (2022). Review and assessment of factors affecting adaptive reuse of commercial projects in Saudi Arabia. Int. J. Build. Pathol. Adapt.40 (1), 119. 10.1108/IJBPA-04-2020-0033

  • 26

    HimeurY.AlsalemiA.BensaaliF.AmiraA. (2020). A novel approach for detecting anomalous energy consumption based on micro-moments and deep neural networks. Cogn. Comput.12 (6), 13811401. 10.1007/s12559-020-09764-y

  • 27

    HimeurY.ElnourM.FadliF.MeskinN.PetriI.RezguiY.et al (2023). AI-big data analytics for building automation and management systems: a survey, actual challenges and future perspectives. Springer Neth.56 (6), 49295021. 10.1007/s10462-022-10286-2

  • 28

    HimeurY.GhanemK.AlsalemiA.BensaaliF.AmiraA. (2021). Artificial intelligence based anomaly detection of energy consumption in buildings: a review, current trends and new perspectives. Appl. Energy287, 116601. 10.1016/j.apenergy.2021.116601

  • 29

    HoltG. D. (2013). Asking questions, analysing answers: relative importance revisited. Constr. Innov.14 (1), 216. 10.1108/CI-06-2012-0035

  • 30

    HoyM. B. (2016). Smart buildings: an introduction to the library of the future. Med. Ref. Serv. Q.35 (3), 326331. 10.1080/02763869.2016.1189787

  • 31

    HuseienG. F.ShahK. W. (2022). A review on 5G technology for smart energy management and smart buildings in Singapore. Energy ai.7, 100116. 10.1016/j.egyai.2021.100116

  • 32

    IbrhemA.AmerM.OngJ. (2020). Study on the challenges faced in the implementation of intelligent buildings.

  • 33

    IwuagwuB. U.ChiomaM.IwuagwuB. (2014). “Adopting intelligent buildings in Nigeria: the hopes and fears,” in 2nd International Conference on Emerging Trends in Engineering and Technology (ICETET'2014), London (UK), May 30-31, 2014.

  • 34

    JacobssonA. (2016). On privacy and security in smart homes – iotap. Malmö: Malmö University – Medium. 10.1109/EISIC.2016.21

  • 35

    JayasingheI.DomingoN.Thi HoaiA. L.SutrisnaM. (2023). A Systematic review of vertical construction project characteristics. Moratuwa: University of Moratuwa, 3746. 10.31705/wcs.2023.4

  • 36

    KaklauskasA.LillI.AmaratungaD.UbarteI. (2019). Model for smart, self-learning and adaptive resilience building. Emerald Reach Proc. Ser.2, 315324. 10.1108/S2516-285320190000002017

  • 37

    LiZ.ZhangJ.LiM.HuangJ.WangX. (2020). A review of smart design based on interactive experience in building systems. Sustain12, 67606774. 10.3390/SU12176760

  • 38

    MarigoM.MaccariniA.ZarrellaA.AfshariA. (2023). Fault impact analysis of ventilation systems in residential buildings: a simulation-based case study in Denmark. Energy Build.292, 113150. 10.1016/j.enbuild.2023.113150

  • 39

    McLauchlanK. K.HigueraP. E.MieselJ.RogersB. M.SchweitzerJ.ShumanJ. K.et al (2020). Fire as a fundamental ecological process: research advances and frontiers. J. Ecol.108 (5), 20472069. 10.1111/1365-2745.13403

  • 40

    PašekJ.SojkováV. (2018). Facility management of smart buildings. Int. Rev. Appl. Sci. Eng.9 (2), 181187. 10.1556/1848.2018.9.2.15

  • 41

    PramanikP. K. D.MukherjeeB.PalS.PalT.SinghS. P. (2019). Green smart building: requisites, architecture, challenges, and use cases. Green Build. Manag. Smart Automation2019, 150. 10.4018/978-1-5225-9754-4.ch001

  • 42

    RomanK. K.O’BrienT.AlveyJ. B.WooO. J. (2016). Simulating the effects of cool roof and PCM (phase change materials) based roof to mitigate UHI (urban heat island) in prominent US cities. Energy96, 103117. 10.1016/j.energy.2015.11.082

  • 43

    SaadS.AlaloulW. S.AmmadS.AltafM.QureshiA. H. (2022). Identification of critical success factors for the adoption of Industrialized Building System (IBS) in Malaysian construction industry. Ain Shams Eng. J.13 (2), 101547. 10.1016/j.asej.2021.06.031

  • 44

    SalkutiS. R. (2021). Smart cities: understanding policies, standards, applications and case studies. Int. J. Electr. Comput. Eng.11 (4), 31373144. 10.11591/ijece.v11i4.pp3137-3144

  • 45

    Sánchez-CorcueraR.Nuñez-MarcosA.Sesma-SolanceJ.Bilbao-JayoA.MuleroR.ZulaikaU.et al (2019). Smart cities survey: technologies, application domains and challenges for the cities of the future. Int. J. Distrib. Sens. Netw.15, 155014771985398. 10.1177/1550147719853984

  • 46

    SatheshA.HamdanY. B. (2021). Smart home environment future challenges and issues - a survey. J. Electron. Inf.3 (1), 114. 10.36548/jei.2021.1.001

  • 47

    SoA. T. p.WongK. C. (2002). On the quantitative assessment of intelligent buildings. Facilities20 (5), 208216. 10.1108/02632770210426693

  • 48

    SovacoolB. K.Furszyfer Del RioD. D. (2020). Smart home technologies in Europe: a critical review of concepts, benefits, risks and policies. Renew. Sustain. Energy Rev.120, 109663. 10.1016/j.rser.2019.109663

  • 49

    TaktakE. (2016). “An adaptation approach for Smart Buildings,” in 2016 IEEE 18th International Conference on High Performance Computing and Communications; IEEE 14th International Conference on Smart City; IEEE 2nd International Conference on Data Science and Systems (HPCC/SmartCity/DSS), Sydney, NSW, Australia, 12-14 December 2016. 10.1109/HPCC-SmartCity-DSS.2016.0156

  • 50

    ZhaoS.ZhangP.LiW. (2021). A study on evaluation of influencing factors for sustainable development of smart construction enterprises: case study from China. Buildings11 (6), 221. 10.3390/buildings11060221

  • 51

    ZhenxingW.ShutaoW.LinxiangS.ZhongyuanL. (2009). “The analysis and implementation of smart home control system,” in 2009 International Conference on Information Management and Engineering, Kuala Lumpur, Malaysia, 03-05 April 2009, 546549. 10.1109/ICIME.2009.79

Summary

Keywords

smart building technologies, challenges, buildings lifecycle phases, building automation, smart city

Citation

Baharetha S, Soliman AM, Hassanain MA, Alshibani A and Ezz MS (2024) Assessment of the challenges influencing the adoption of smart building technologies. Front. Built Environ. 9:1334005. doi: 10.3389/fbuil.2023.1334005

Received

06 November 2023

Accepted

19 December 2023

Published

23 January 2024

Volume

9 - 2023

Edited by

Yassine Himeur, University of Dubai, United Arab Emirates

Reviewed by

Adel Oulefki, University of Sharjah, United Arab Emirates

Oussama Kerdjidj, University of Dubai, United Arab Emirates

Updates

Copyright

*Correspondence: Mohamed Salah Ezz,

Disclaimer

All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.