Abstract
Decentralized hybrid solar photovoltaic systems present a viable option for rural electrification, especially for regions where solar irradiance is high, but grid connectivity is not feasible. In this study, the performance of a 1.6 MW solar photovoltaic–Diesel generator hybrid Mini grid located at Bukuzindu village, Bugala island in Kalangala district, Uganda was assessed. The system’s monthly energy data for the period from July 2019 to June 2023 was collected and analysed. The findings showed that the average monthly electricity generated by the plant was 203.1 MWh, of which 174.1 MWh, 22.4 MWh, 0.96 MWh, and 5.4 MWh, respectively, were distributed to consumers, accounted for generation and transmission losses, consumed at the plant site, and used to charge the battery bank system. The solar PV performance ratio and capacity factor were found to be 65.6% and 13.4%, respectively. Meanwhile, the mini grid capacity factor and overall combined generation and transmission loss were 17.39% and 11.03%, respectively.
1 Introduction
Access to affordable, reliable, and modern electricity remains a major global development challenge. More than 620 million people worldwide lack access to electricity, with the greatest burden concentrated in Sub-Saharan Africa, where more than half of the population remains without access to clean and modern energy services (). This persistent energy deficit has significant implications for socioeconomic development, given the well-established positive relationship between electricity consumption and economic growth (Lawal et al., 2020), (Oliveira et al., 2024). Reliable electricity is essential for productive activities, healthcare, education, communication, water supply, and the development of modern industries; consequently, expanding access to dependable and sustainable electricity is central to achieving inclusive economic development.
Uganda continues to face significant challenges in expanding access to modern energy, particularly in rural and remote communities. According to the 2024 National Population and Housing Census, Uganda has a population of approximately 45.9 million people (Uganda Bureau of Statistics, 2024).
Despite ongoing investments in the energy sector, the country’s final energy consumption remains overwhelmingly dependent on solid biomass, primarily firewood and charcoal, which account for approximately 86% of total final energy consumption. Petroleum products and electricity contribute approximately 11% and 2%, respectively (). This heavy dependence on biomass has significant environmental and socioeconomic consequences. Uganda’s forest cover has declined substantially, from an estimated 54% in 1900 (Nafula, 2023) to approximately 13.3% in 2022 (NPA, 2024). In addition, reliance on firewood and charcoal for cooking exposes households, particularly women and girls, to household air pollution associated with adverse respiratory health outcomes (Wafula et al., 2023).
Although Uganda’s overall electricity access has increased to approximately 60%, a substantial proportion of this access is provided through small-scale solar technologies rather than conventional grid connections. Grid electricity access at the household level remains considerably lower, at approximately 25.3%, with rural household access estimated at only 9.1%, compared with 49% in urban areas (Murungi et al., 2025). This disparity is particularly significant because approximately 73% of Uganda’s population resides in rural areas (WorldBank, 2024). Extending the national electricity grid to remote and sparsely populated communities is often technically and economically challenging because of the substantial investment required for transmission and distribution infrastructure, substations, and associated network facilities (Wassie and Adaramola, 2021). Consequently, decentralized electricity systems, including solar photovoltaic (PV) mini-grids and hybrid renewable energy systems (HRES), provide an important alternative for improving electricity access in areas where conventional grid extension is not economically viable.
At the same time, Uganda has made considerable progress in expanding its electricity-generation capacity. Installed generation capacity increased more than threefold over the past 15 years, from approximately 595 MW in 2010 (NPA, 2024) to more than 2,000 MW by 2025 (). As shown in Table 1, Uganda’s electricity-generation portfolio remains strongly dominated by hydropower, with large and small hydropower plants accounting for the majority of installed capacity. Solar PV, despite its considerable potential and versatility, continues to represent a relatively small proportion of the country’s installed generation capacity.
TABLE 1
| Power plant | Only grid-centralised (MW) | Own use (MW) | Own-use and grid (MW) | Off grid (MW) | Total (MW) | Contribution (%) |
|---|---|---|---|---|---|---|
| Large hydro | 1500.21 | 1500.21 | 71.49 | |||
| Small hydro | 220.89 | 0.62 | 221.51 | 10.56 | ||
| Solar PV | 85.60 | 2.68 | 88.28 | 4.21 | ||
| Thermal | 92.00 | 8.00 | 100.00 | 4.77 | ||
| Bagasse | 23.00 | 40.65 | 124.50 | 188.15 | 8.97 | |
| Biomass | 0.44 | 0.44 | 0.02 | |||
| Total | 1921.70 | 40.65 | 124.50 | 11.74 | 2098.59 | 100.00 |
| Contribution (%) | 91.57 | 1.94 | 5.93 | 0.56 | 100.00 |
Current installed power generation in Uganda ().
Data is extracted from ERA (2025) and available at: https://www.era.go.ug/index.php/stats/generation-statistics/installed-capacity (Accessed on 30 September 2025).
Solar energy has applications extending beyond electricity generation, including agricultural-product drying, water pumping for irrigation, food and vaccine preservation, and water and space heating (). With an average daily solar radiation of (), Uganda is particularly well positioned to exploit solar energy. Nevertheless, as shown in Table 1, solar PV accounted for only 88.28 MW of the country’s installed generation capacity as of September 2025 (). This relatively limited contribution highlights both the underutilization of Uganda’s solar resource and the potential for further deployment of solar-based electricity systems, particularly in areas underserved by the national grid.
Solar energy as reported by () is particularly attractive for hybrid energy systems because of its ability to complement conventional and other renewable energy sources. Solar PV can be integrated with grid electricity, diesel generators, wind turbines, and battery storage in configurations such as PV/grid, PV/diesel, PV/wind, PV/wind/diesel, and PV/wind/battery systems (). Such hybridization can improve system reliability, reduce dependence on fossil fuels, lower greenhouse-gas emissions, and improve the quality and continuity of electricity supplied to consumers (). For remote communities, these characteristics make HRES particularly relevant as an alternative to either diesel-only generation or costly grid extension.
In Uganda, decentralized renewable-energy systems have consequently emerged as viable options for rural electrification, particularly where connection to the national grid is technically or economically impractical. The country currently has more than 46 operational mini-grids, with a combined installed capacity of approximately 3.871 MW, most of which are based on solar PV technology (NREP, 2024). Although the installed capacity of these systems remains relatively small compared with the national generation portfolio, their strategic importance is considerable because they can provide electricity to geographically isolated communities while reducing reliance on conventional fossil-fuel-based generation.
The strategic importance of solar energy is further reinforced by Uganda’s long-term energy-development plans. The Uganda Energy Policy 2023 and Uganda Vision 2040 envisage a substantial expansion of the country’s electricity-generation capacity, reaching approximately 52.4 GW by 2040 (MEMD, 2023). Of this projected capacity, approximately 12 GW is expected to come from solar PV, representing about 23% of the planned generation mix. As shown in Table 2, the projected generation portfolio also includes substantial contributions from nuclear, hydropower, natural gas, geothermal, green hydrogen, biomass, wind, and other sources. The planned expansion indicates that solar-based electricity systems are likely to become an increasingly important component of Uganda’s future energy landscape.
TABLE 2
| Power plant category | Year 2040 |
|---|---|
| Hydro (MW) | 4500 |
| Thermal (MW) | 1500 |
| Co-generation (MW) | 1000 |
| Solar PV (MW) | 12,000 |
| Geothermal (MW) | 1500 |
| Nuclear (MW) | 24,000 |
| Natural gas (MW) | 3400 |
| Green hydrogen (MW) | 2500 |
| Wind (MW) | 200 |
| Peat (MW) | 800 |
| Waste to Energy/Biomass (MW) | 1000 |
| Total (MW) | 52,400 |
Uganda’s projected power generation mix requirements by 2040 (Energy Policy, 2023) (MEMD, 2023).
The increasing deployment of decentralized solar and hybrid energy systems makes the assessment of their actual operational performance particularly important. Technical performance evaluation provides evidence on the extent to which installed systems deliver their expected energy output and can reveal operational losses, equipment degradation, underperformance, and other factors affecting system reliability and sustainability. Such evidence is also important for informing the design, sizing, operation, maintenance, and future deployment of HRES in rural electrification programmes.
Several studies have evaluated the technical performance of photovoltaic systems using measured operational data. For example (), assessed a 5.05 kWp grid-connected PV system in Rajkot, India, and reported final yields ranging from 2.96 to 5.43 h/day, reference yields from 4.22 to 7.29 h/day, and performance ratios of 68%–83%, with an annual average energy yield of 1,636 kWh/kWp (). evaluated an 830 kWp grid-connected PV plant at Kamuzu International Airport in Malawi using measured and simulated data and reported a 4-year average performance ratio of 79.2% and a capacity factor of 17.7%. Similarly (), evaluated a 1.4 kWp grid-connected PV system at Sultan Qaboos University in Oman and reported annual energy production of 2,217.6 kWh, a performance ratio of 65%, and a capacity factor of 17%.
Other studies have reported comparable performance assessments for PV systems in different climatic and operational environments (Sharma and Goel, 2017). evaluated an 11.2 kWp grid-connected PV system in Bhubaneswar, India, over 1 year and reported annual energy production of 14.960 MWh and a performance ratio of 78% (Sharma and Chandel, 2013). assessed a 190 kWp PV plant at Khatkar-Kalan, India, reporting an annual average performance ratio of 74%, a capacity factor of 9.27%, and system losses of 31.7%. In Ireland (), analysed a 1.72 kWp rooftop grid-connected PV system over a 1-year monitoring period and reported an annual energy yield of 885.1 kWh/kWp, a performance ratio of 81.5%, and a capacity factor of 10.1%.
Compared with grid-connected PV systems, considerably less empirical evidence is available on the long-term operational performance of off-grid PV mini-grids, particularly hybrid systems supplying isolated communities. An important example is the study by (Wassie and Ahlgren, 2023) which investigated the actual performance of a 375 kWp off-grid PV mini-grid installed in a remote Ethiopian town using measured weather, power-generation, and load data. The system generated approximately 1,182 kWh/day compared with an estimated 2,214 kWh/day, representing a shortfall of approximately 46%, and achieved a capacity factor of 13%. The overall system efficiency was reported as 8.76%, indicating significant operational underperformance. However, the study was based on only 8 months of operational data, which may not adequately capture seasonal variations and long-term operating characteristics of an off-grid PV mini-grid.
The existing literature therefore demonstrates a clear imbalance in the evidence base. While numerous studies have assessed the performance of grid-connected PV systems, relatively few have investigated the long-term, measured performance of off-grid solar PV–diesel hybrid systems operating under the environmental, load, and operational conditions characteristic of rural Sub-Saharan Africa. In particular, there is limited empirical evidence from Uganda based on several consecutive years of actual operational data. This is an important knowledge gap because the performance of hybrid systems can vary substantially with solar resource availability, load demand, diesel-generator operation, system configuration, maintenance practices, equipment condition, and seasonal conditions. Short-duration assessments may consequently fail to capture important variations in system performance.
This study addresses this gap by evaluating the technical performance of the 1.6 MW Kalangala Solar PV–Diesel Hybrid Power Plant, an off-grid hybrid electricity-generation system located on Kalangala Island, Uganda. Unlike studies based primarily on simulations or short monitoring periods, this study uses 4 years of actual operational data to assess the performance of the hybrid system. The analysis provides empirical evidence on the system’s energy generation and technical performance over an extended operating period and offers insights into the operational characteristics of an off-grid PV–diesel–battery hybrid system in a remote Ugandan setting. The findings are intended to contribute to improved planning, design, operation, maintenance, and performance evaluation of decentralized hybrid renewable-energy systems and to support their wider adoption as a technically and economically viable pathway for rural electrification in Uganda and similar developing-country contexts.
2 Methods and materials
2.1 Installation site and overview of the power plant
The Kalangala solar PV-diesel hybrid power plant was commissioned in December 2014 and is in Bukuzindu village, Mugoye sub-county, on Bugala Island in Kalangala district, Uganda. The plant is located 17 km from Kalangala town on a latitude 0.305 S and longitude 32.15 E. Figure 1 shows the map of Uganda and the location of the power plant. Currently, the power plant supplies electricity to over 5,523 domestic and 67 commercial customers, including hotels and small enterprises (). The power plant was constructed at an estimated cost of US$17 million ().
FIGURE 1
2.2 Components of the hybrid power-generating station
The power plant has a total installed capacity of 1.6 MW, with the solar PV system contributing 0.6 MW and 1.0 MW from diesel generators. Other major components of the power plant include 4 grid-connected inverters, 2 bi-directional inverters, maximum power point tracking (MPPT) charge controllers, a battery system, and a 2 MVA substation. The generated power is distributed using a 144 km medium-voltage distribution network and 180 km low-voltage distribution network (
FIGURE 2

Site layout of the 1.6 MW solar-diesel hybrid power plant (
FIGURE 3

Selected photos of Kalangala Hybrid Solar Power Plant (Pictures: Ivan T Oloya).
2.3 Design, arrangement, and connections
The solar system component comprises a solar PV system, battery bank, charge controllers, and inverters. The solar PV system is made up of 2832 PSS 235Wp modules, and it is divided into three units. The first unit (Unit 1) comprises 1,920 modules and is subdivided into 4 arrays, with each array comprising 480 modules and connected to a 125-kW grid inverter (with model number APOLLO GTP-507). The key technical specifications of the modules are shown in Table 3.
TABLE 3
| Parameter | Value |
|---|---|
| Peak power, (W) | 235 |
| Peak current, (A) | 7.46 |
| Peak voltage, (V) | 31.50 |
| Short circuit current, (A) | 8.40 |
| Open circuit voltage, (V) | 37.00 |
| Maximum system voltage (V) | 1000 |
Selected specifications of the PSS235 module (
Table 4 shows selected specifications for grid-connected inverters. Each array is arranged as 15 modules per string with a total of 16 strings in 2 parallel rows per grid inverter. This results in a total PV open circuit of 555 V and a voltage at the maximum power point of 472.5 V. This total PV open circuit voltage is slightly higher than the inverter’s maximum input voltage per string of 550 V, however, the total per string is within the maximum power point tracking (MPPT) voltage range of 270–500 V of the inverter. To protect the inverters from over voltage, a high voltage cut-off of 480 V was set. The total short circuit current of each array in Unit 1 is 268.8A, which is lower than the grid-connected inverter’s maximum input current of 465A.
TABLE 4
| Parameter | Value |
|---|---|
| Maximum input voltage per PV string (Voc) | 550 |
| Maximum input current/Max PV current (Idc) | 465A |
| MPPT voltage range (V) | 270–500 |
| Nominal output power (kW) | 137.5 |
| Maximum output power (kVA) | 15 |
| Nominal operating voltage (three phase) (V) | 380/400/415 |
| Nominal frequency range (Hz) | 50/60 |
| Single-phase AC voltage range (V) | 220–240 |
| Efficiency (%) | 95.6 |
Selected specifications of the APOLLO GTP-507 grid-connected inverters (LEONICS, 2019).
The second unit (Unit 2) comprises 900 modules and is subdivided into 3 arrays, with each array connected to a charger controller (MPPT Solarcon SCM-480200 charge controllers) (see Table 5), which charges the battery bank. Each array is arranged as 15 modules per string and 20 strings per charge controller, with 300 modules. The total PV short-circuit current is 168A, which is lower than the charge controller’s maximum input current of 200A. However, the total PV open circuit voltage is 555 V, slightly higher than the charge controller’s maximum open circuit voltage of 552 V.
TABLE 5
| Parameter | Value |
|---|---|
| INPUT | |
| of PV at STC (V) | 340–408 |
| MPPT voltage range (V) | 192–408 |
| of PV at STC (V) | 552 |
| Maximum input current (A) | 200 |
| OUTPUT | |
| Nominal battery voltage | 480 |
Selected specifications of the Solarcon SCM-480200 charge controller (LEONICS, 2019).
All the solar PV, module rows are spaced 4 m apart to minimize the effect of self-shading.
The battery bank is connected to the MPPT solar charge controllers and two bi-directional inverters via the DC busbar. The battery bank is made up of 2 strings, with each string comprised of 240 batteries. Each battery is rated as 686 Ah, 2 V @10 h. This results in total battery capacity and string voltage of 1372 Ah and 480 V, respectively or 658.56 kWh. The battery model used is Hoppecke Sun Power VL 2-910 (see Table 6 for selected specifications). Each bi-directional inverter (MTP-6113G) is rated 200 kVA. The bi-directional inverters link the AC bus and DC bus. Table 7 shows the selected specifications of the bi-directional inverters. In the original design of the power plant, the batteries played a buffer role, storing excess energy during low demand and releasing it when the system needs excess power (
TABLE 6
| Parameter | Value |
|---|---|
| Nominal voltage (V) | 2 |
| Capacity at 100 h | 910 |
| Capacity at 10 h | 686 |
Selected specifications of the battery (
TABLE 7
| Parameter | Value |
|---|---|
| Rated power (kW) | 200 |
| Nominal battery voltage (V) | 480 |
| Recommended generator input power (kW) | 400 |
| Generator input voltage (V) | 380/400/415 |
| Generator maximum AC input current (A) | 637 |
| AC output voltage (V) | 415 |
| AC output frequency (Hz) | 50/60 |
| Maximum AC output current (A) | 303A |
| Peak efficiency () | 95 |
Selected specifications of the Apollo MTP-6113 H-P bi-directional inverter.
The plant has three diesel generators rated 500 kVA, 320 kVA, and 200 kVA. The output from the diesel generators and grid-connected inverters is fed to the 1,500A AC bus, which in turn feeds a main substation of two 1 MVA transformers. Power from the substation is then fed through a 33 kV distribution line to two main feeders.
2.4 Data collection and monitoring
The power plant has a data logger, which is used for monitoring and recording energy output from the solar PV system, energy output from diesel generators, and other weather-related data. The plant also has a pyranometer, which measures in-plane solar irradiation on the solar PV system. Monthly power plant output and weather data from July 2019 and June 2023 were collected from the plant facility’s manager during a site visit. However, solar irradiation data were only provided for the period between July 2019 and June 2022. The power output data collected includes monthly energy generated by the solar PV and diesel generators, energy consumed at the power plant station, energy used for charging the battery bank, energy dispatched to the transmission network, and energy delivered to the distribution network.
2.5 Analysis approaches and performance indices
The technical performance analysis of the hybrid power plant is divided in two groups: (i) the technical performance of the solar PV system and (ii) the overall performance of the hybrid power plant.
2.5.1 Solar PV plant performance indicators
The performance of a Solar PV system can be studied by assessing several technical performance indicators. The technical indicators demonstrate the overall efficiency of the system, subject to the technical properties of the installation’s components and site environmental conditions. The essential indicators are final energy output, performance ratio, and capacity factor. The final energy output of a solar PV system can be determined as shown in Equation 1 (Mensah et al., 2019), (
The performance ratio (PR) is defined as the ratio of the final energy yield of the PV system () to the reference, yield () (
The reference yield is defined as the total in-plane irradiance divided by the reference irradiance, which is given as 1 . The reference yield is the number of peak sun hours or solar radiation in . The is a function of the location, tilt angle, and orientation of the solar PV system, as well as ambient conditions (such as ambient temperature, wind speed, and air condition) of the solar PV installation and solar PV technology (such as temperature coefficients).
The final yield () is defined as the annual, monthly, or daily final energy output of the solar PV system divided by its installed power capacity at standard test conditions, and it is mathematically expressed as indicated in Equation 3:
The overall solar PV system losses () can be expressed as a function of the performance ratio as follows (see Equation 4):
The capacity factor (CF) is the ratio of actual energy produced () by a power plant over a given period to the energy output that would have been generated if the system operated at installed capacity () for the entire period. The annual capacity factor of a power plant is given in Equation 5 (Mensah et al., 2019), (
2.5.2 Diesel generator performance indices
Renewable energy systems have intermittent energy output characteristics. As such, they are often integrated with conventional power sources to deliver stable power output. The use of diesel generators in grid-connected systems assists in supporting load peaks and reduces or eliminates the need for a battery system (or reduces the capacity of the battery system). The energy output of the diesel generator is given by Equation 6:
2.5.3 Hybrid plant performance indices
For a hybrid solar-diesel system, the generated energy is the sum of energy generated by the solar PV array () and the diesel generators () and it is given as Equation 7 (
The actual energy dispatched by the combined generators over a given period is expressed as given in Equation 8.where is the amount of energy generated but not delivered at the point of transmission, and in this study, it is given as in Equation 9:where is the energy consumed at the power plant premises, is the technical loss on the generation side, and is the energy used for charging batteries. The energy delivered to the consumers (measured at the transformers) is expressed as Equation 10:where is the amount of energy dispatched but not delivered to the consumers. Therefore, the overall system loss is expressed as in Equation 11:
The overall performance (efficiency) of the power plant can be expressed as the actual energy delivered to the consumers relative to the actual energy generated by the power plant from all the power generators (
Alternatively, the power plant efficiency can be expressed as Equation 13:
3 Results and Discussions
3.1 Electricity generation
Figure 4 shows the monthly electricity generated by the solar PV (SPV) system, diesel generator, and the contribution of the solar PV system to the monthly electricity generation from June 2019 and July 2023. The electricity generated by the SPV system varied between 49.2 MWh (in November 2022) and 83.3 MWh (in July 2022), with an overall average of 65.5 MWh per month. In addition, the electricity generated by the diesel generators varied between 85.02 MWh (in June 2020) and 240.18 MWh (in November 2020), with an overall average of 137.15 MWh per month. The high energy output from diesel generators could be attributed to the electrical load demand that is usually higher in the evening period, since most electricity consumers in Bugala Island are residential households. In addition, within the period considered in this study, it is observed that the monthly SPV system contribution ranges between 23.67% (in November 2020) and 86.12% (in June 2020) with an average monthly contribution of 49.69%. As can be observed in Figure 4, the percentage contribution of the SPV system is inversely proportional to the diesel generator output.
FIGURE 4

Electricity generated by the hybrid energy system from June 2019 to July 2023.
The variability coefficient, defined as the ratio of the standard deviation to the average value, is estimated as 10.29%, 18.48%, and 11.57% for the SPV system, diesel generators, and hybrid system, respectively. Therefore, the power output from the hybrid power plant can be considered relatively constant over the studied period. This information could be useful to forecast the future energy output from the power plant.
Figure 5 shows the average monthly electricity generated by the hybrid power plant and SPV system, as well as the average monthly contribution of the solar PV system. On average, the power plant generated a minimum of 187.83 MWh and a maximum of 229.55 MWh of electricity in June and December, respectively, with a monthly average of 203.01 MWh. Furthermore, the average total energy output of the hybrid power plant is estimated as 436.08 MWh. In addition, it is observed that, on average, the solar PV (SPV) system generated a minimum of 56.18 MWh and a maximum of 74.29 MWh of electricity in November and July, respectively, and a monthly average of 65.56 MWh. The monthly coefficient of variation (CoV) of 6.63% indicated that monthly SPV system generation is moderately constant from January to December. The contribution of the SPV peaked in July (with 37.96%) and attained the lowest value of 24.61% in November.
FIGURE 5

Average monthly energy generated.
3.2 Electricity delivered and losses
Figure 6 shows the percentage of the electricity delivered to the distribution system, losses in generation and transmission systems, energy used for charging the battery, and energy consumed at the power plant site. The percentage of electricity delivered to the grid relative to electricity generated by the hybrid power plant ranges between 83.79% (in February) and 89.17% (in November), and an annual monthly average of about 86%.
FIGURE 6

Distribution of electricity delivered to the grid, losses, energy used for charging the battery bank, and energy consumed by the power plant.
The peak in transformer-metered energy observed in November 2020 may be attributed to several factors. First, the Ugandan government eased COVID-19 restrictions on 9 November 2020 (Wanambwa, 2020), which likely led to increased electricity demand on the island as businesses resumed operations, particularly in the tourism sector and other commercial enterprises on which the island’s economy heavily depends. A second possible explanation, according to the plant manager, is that a palm oil processing factory requested a continuous electricity supply from the power plant after its steam turbine—the factory’s primary source of electricity generation—broke down during this period. This would have resulted in increased demand. However, there is no publicly available evidence confirming that this event was responsible for the observed increase in electricity consumption.
It can also be observed that the combined auxiliary, generation, substation, transmission, and distribution losses range from 8.66% in November to 13.21% in February, with an annual average of 11.03%. Of the total electricity generated, approximately 0.50% is consumed by auxiliary plant loads, while 2.72% is used to charge the battery bank system.
The mini-grid supplies Bugala Island through a 33 kV distribution network. For this study, generation losses refer to energy consumed within the generating station, including auxiliary plant loads and battery charging as well as auxiliary generation losses. In contrast, distribution losses refer to technical losses incurred during power delivery through the substation and 33 kV distribution network.
The reported loss is a combination of generation loss (average of 3.13%) and distribution loss (average of 7.90%). On the other hand, between 2021 and 2025, the Ugandan national grid recorded average transmission losses of 4.42% and distribution losses of 17.74% ((
3.3 Capacity factor and solar PV performance ratio
The monthly capacity factor of the solar PV system, diesel generators, and overall hybrid power plant, as well as the performance of the solar PV systems, are presented in Figure 7. The capacity factor represents the ratio of the actual energy generated over a given period to the energy that would have been produced if each component of the mini grid operated continuously at its rated capacity. It therefore provides an indication of the extent to which each component is utilized relative to its maximum possible energy output.
FIGURE 7

Capacity factor of the generators and performance ratio of the solar PV.
It can be deduced from Figure 7 that average annual capacity factors are 13.44%, 18.88%, and 17.39%, respectively, for the solar PV system, diesel generator, and overall hybrid power plant. The relatively low-capacity factor of the solar PV system (13.44%) is primarily associated with the intermittent nature of solar energy resources. Solar PV generation is limited to daylight hours and is further influenced by solar irradiance variability, cloud cover, seasonal changes, module temperature, and system losses. The diesel generator capacity factor of 18.88% indicates that the generator operates for a relatively small proportion of its rated capacity over the year. This is expected in a hybrid mini grid where diesel generation serves primarily as a dispatchable backup source rather than the main energy supplier. The lower utilization level reflects the operational strategy of prioritizing renewable energy generation while using the diesel generator during periods of insufficient solar production, high demand, or system contingencies. This reduced operating time contributes to lower fuel consumption, reduced emissions, and extended generator lifetime.
The solar PV mini-grid achieved an annual average Performance ratio (PR) of 65.62% as shown in Figure 7, indicating that approximately two-thirds of the theoretical energy available from the incident solar radiation was converted into useful electrical energy after considering system losses. The PR provides a direct measure of the technical performance of the PV system by evaluating the actual energy yield relative to the expected output under standard test conditions.
In comparison with the findings of Wassie and Ahlgren (Wassie and Ahlgren, 2023) of a mini-grid system in southern Ethiopia, the performance of the present study is better. The mini-grid capacity factor and performance ratio of the solar PV system for Wassie and Ahlgren are 13.0% and 42%, respectively. However, the performance ratio and capacity factor of the solar PV system are lower than those of the Soroti solar PV plant, at 75.84% and 19.07%, respectively (Oloya et al., 2021). The low-capacity factor and performance ratio of the power plant, compared to the Soroti Solar PV plant, could be due to the plant having a lower average daily radiation of 4.94 kWh/m squared/day, compared to the Soroti Solar PV plant at 5.85 kWh/m which is 5.85 kW/ /day. Other factors could include dust accumulation given the plant’s close proximity to the main road, inverter conversion losses, battery storage losses, and additional power electronics losses in the hybrid mini-grid system.
4 Conclusions and recommendations
4.1 Key findings
A technical performance study of a 1.6 MW Solar PV–Diesel hybrid system installed in Bugala Island, Kalangala district, Uganda, was conducted using real-time energy generation and transmission data as well as measured irradiance of the location. The collected data used in the analysis were for 4 years between June 2019 and May 2023.
The findings showed that on average, the mini-grid power plant generated 2436.1 MWh annually, with a monthly average of 203.1 MWh, of which 174.1 MWh, 22.4 MWh, 0.96 MWh, and 5.4 MWh, respectively, are distributed to the consumers, used for generation and transmission losses, consumed at the plant site, and used to charge the battery bank system. The overall combined generation and transmission loss of the power plant is reported as 11.03%, while the solar PV system contributed 32.5% of the electricity generated by the plant. Analysis of the system’s losses showed that the solar-diesel hybrid system’s transmission line loss (7.9%) was higher and almost double that of the annual national average of 4.2% during the same period.
The solar PV system’s annual performance ratio and capacity factor are 65.6% and 13.4%, respectively, while the mini-grid system has a capacity factor of 17.39%. The hybrid system is close to a busy dusty road, hence the need for routine cleaning.
4.2 Policy recommendations
The study results indicate that transmission losses on the island’s mini-grid are 7.9%, substantially higher than the national grid average of 4.42%. This elevated loss level is likely associated, among other factors, with the continued operation of a 33 kV transmission system under increasing electricity demand. At higher loading levels, the relatively low transmission voltage results in increased current flow and consequently higher power losses. At medium-voltage transmission levels, 33 kV networks are suitable for relatively long-distance power transfer where the distance and load do not justify higher transmission voltages. Published studies report the application of 33 kV lines over distances ranging from approximately 30 km–60 km. For example, 33 kV lines of 30 km and 40 km have been analysed in electrical-network studies (
The island’s transmission network, however, currently extends to approximately 144 km, while electricity demand continues to increase. This combination of long transmission distances and growing demand places additional loading on the existing 33 kV infrastructure and is likely to contribute to the observed technical losses and voltage-performance challenges. It is therefore recommended that the Government and relevant electricity-sector stakeholders undertake a detailed feasibility and system-planning study to upgrade the island’s principal transmission network from 33 kV to 66 kV. The proposed upgrade should be supported by load-flow, voltage-drop, fault-level and economic analyses to determine the optimal configuration, conductor requirements, substation locations and investment requirements. Increasing the transmission voltage would reduce current for a given power transfer and, consequently, reduce resistive transmission losses, improve voltage regulation and provide greater capacity for accommodating the island’s projected growth in electricity demand.
The upgrade should be implemented as part of a long-term transmission reinforcement strategy, rather than solely as a response to the current loss levels, to ensure that the island’s electricity infrastructure remains reliable, efficient and capable of supporting future economic and social development.
4.3 Limitations and future research
This study had some limitations, thus affecting the possibilities of assessing certain performance aspects. For example, the Levelized Cost of Electricity and payback period could not be assessed since the distribution tariff for the plant has only been declared for the period up to quarter one of 2022, and yet the data used in this study is for the period up to July 2023.
Future research is crucial to conduct a detailed techno-economic performance analysis of hybrid renewable energy systems in Uganda; however, this requires that data on tariffs be updated frequently. Similarly, the performance of other hybrid solar photovoltaic plants needs to be carried out to assess their performance in terms of financial and technological viability.
Statements
Data availability statement
The raw data supporting the conclusions of this article will be made available by the authors, without undue reservation.
Author contributions
IT: Conceptualization, Data curation, Formal Analysis, Investigation, Methodology, Writing – original draft, Writing – review and editing. MA: Conceptualization, Formal Analysis, Investigation, Methodology, Resources, Writing – original draft, Writing – review and editing.
Funding
The author(s) declared that financial support was not received for this work and/or its publication.
Conflict of interest
The author(s) declared that this work was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.
The author MA declared that they were an editorial board member of Frontiers at the time of submission. This had no impact on the peer review process and the final decision.
Generative AI statement
The author(s) declared that generative AI was not used in the creation of this manuscript.
Any alternative text (alt text) provided alongside figures in this article has been generated by Frontiers with the support of artificial intelligence and reasonable efforts have been made to ensure accuracy, including review by the authors wherever possible. If you identify any issues, please contact us.
Publisher’s note
All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article, or claim that may be made by its manufacturer, is not guaranteed or endorsed by the publisher.
References
1
AarakitS. M.SsennonoV. F.AdaramolaM. S. (2021). Estimating market potential for solar photovoltaic systems in Uganda. Front. Energy Res. vol. 9, 602468. 10.3389/fenrg.2021.602468
2
Al-BadiA. H. (2018). Measured performance evaluation of a 1.4 kW grid connected desert type PV in Oman. Energy Sustain. Dev.47, 107–113. 10.1016/j.esd.2018.09.007
3
Al-NajjarH.PfeiferC.Al-AfifR.El-KhozondarH. J. (2022). Performance evaluation of a hybrid grid-connected photovoltaic biogas-generator power system. Energies (15). 10.3390/en15093151
4
AyompeL. M.DuffyA.McCormackS. J.ConlonM. (2011). Measured performance of a 1.72 kW rooftop grid connected photovoltaic system in Ireland. Energy Convers. Manag.52 (2), 816–825. 10.1016/j.enconman.2010.08.007
5
AyuaT. J.CamaraM. (2024). Modeling and Estimation of Solar Panel Tilting Angles and Orientations in the Gambia: A Case Study of Brikama, West Coast Region. Discover Energy4 (31). 10.1007/s43937-024-00059-z
6
AyuaJ. T.EmetereM. E. (2024). Technical and economic simulation of a hybrid renewable energy power system design for industrial application. Scientific Reports14, 28739. 10.1038/s41598-024-77946-x
7
AyuaT. J.UtoO. T.FattyL. K. (2023). An investigation of solar energy potential towards improving agriculture using angstrom and newly developed analytical models: in case of the Gambia. Sci. Afr.21, e01886. 10.1016/j.sciaf.2023.e01886
8
BandaM. H.NyeingaK.OkelloD. (2019). Performance evaluation of 830 kWp grid-connected photovoltaic power plant at Kamuzu international Airport-Malawi. Energy Sustain. Dev.51, 50–55. 10.1016/j.esd.2019.05.005
9
BindheE. (2025). Kalangala solar plant to begin power generation in October. Available online at: https://ugandaradionetwork.net/story/kalangala-solar-plant-to-begin-power-generation-in-october?districtId=545 (Accessed October 11, 2025).
10
de-LimaL. C.FerreiraL. d.-A.MoraisF. H. (2017). Performance analysis of a grid connected photovoltaic system in northeastern Brazil. Energy Sustain. Dev.37, 79–85. 10.1016/j.esd.2017.01.004
11
DobariaB.PandyaM.AwareM. (2016). Analytical assessment of 5.05 kWp grid tied photovoltaic plant performance on the system level in a composite climate of western India. Energy111, 47–51. 10.1016/j.energy.2016.05.082
12
E. Solar (2023). Available online at: “https://www.enfsolar.com/,”ENF Solar, Available online at: https://www.enfsolar.com/pv/charge-controller-datasheet/3297. [Accessed 11 November 2023].
13
El Hacen JedM.IhaddadeneR.IhaddadeneN.SidiC. E. B.El BahM. (2020). Performance analysis of 954,809 kWp PV array of Sheikh zayed solar power plant (Nouakchott, Mauritania). Renew. Energy Focus32, 45–54. 10.1016/j.ref.2019.11.002
14
ERA (2024). Detailed Statistics. Electricity Regulatory Authority. Available online at: https://www.era.go.ug/media/2024/11/Detailed-Statistics.xlsx (Accessed December 21, 2025).
15
ERA (2025). Energy Sales by Customer Category. Electricity Regulatory Authority. Available online at: https://www.era.go.ug/energy-sales-by-customer-category/(Accessed October 11, 2025).
16
ERA (2026a). Trend of Uganda’s installed capacity. Available online at: https://www.era.go.ug/installed-capacity/(Accessed June 25, 2026).
17
ERA (2026b). Transmission. Electricity Regulatory Authority. Available online at: https://www.era.go.ug/transmission-energy-purchases-and-sales/(Accessed July 27, 2026).
18
ERA (2026c). “Distribution,” in Electricity Regulatory Authority. Available online at: https://www.era.go.ug/energy-purchases-sales-and-losses/(Accessed July 27, 2026).
19
Google (2023). Google Maps. Google. Available online at: https://www.google.com/maps (Accessed November 11, 2023).
20
Hoppecke (2023). Available online at: www.hoppecke.com. Available online at: https://www.hoppecke.com/fileadmin/Redakteur/Hoppecke-Main/Products-Import/sun_power_vl_brochure_en.pdf. (Accessed 11 November 2023).
21
IEA (2025). Energy Statistics Data Browser. Available online at: https://www.iea.org/data-and-statistics/data-tools/energy-statistics-data-browser?country=UGA&fuel=Energy%20consumption&indicator=TFCbySource (Accessed September 30, 2025).
22
IgbinoviaF. O.FandiG.KubicaJ.MullerZ.JanicekF.TlustyJ. (2019). Utilizing the synchronous condenser for robust functioning of wind farm implanted electric grid. J. Electr. Eng.70, 152–158. 10.2478/jee-2019-0022
23
JICA (2006). Basic Design Study Report on the Project for Rural Electrification in Cross River and Akwa Ibom States in the Federal Republic of Nigeria. JAPAN INTERNATIONAL COOPERATION AGENCY. Available online at: https://openjicareport.jica.go.jp/pdf/11822814_01.pdf (Accessed September 22, 2026).
24
KIS (2024). “Power services,” in Kalangala Infrastructure Services. Available online at: https://www.kis.co.ug/pages/view-page/Power-Services (Accessed October 11, 2025).
25
KumarS. B.SudhakarK. (2015). Performance evaluation of 10 MW grid-connected solar photovoltaic power plant in India. Energy Rep.1, 184–192. 10.1016/j.egyr.2015.10.001
26
LawalA. I.OzturkI.OlanipekunI. O.AsaleyeA. J. (2020). Examining the linkages between electricity consumption and economic growth in African economies. Energy208, 118363. 10.1016/j.energy.2020.118363
27
LEONICS (2019). Products, LEONICS. Available online at: https://www.leonics.com/product/renewable/inverter/dl/GTP-500-156.pdf (Accessed May 14, 2026).
28
MEMD (2023). Energy Policy for Uganda 2023. Ministry of Energy and Mineral Development, Kampala. Available online at: https://memd.go.ug/media/resource-centre (Accessed September 22, 2026).
29
MensahL. D.YamoahJ. O.AdaramolaM. S. (2019). Performance evaluation of a utility-scale grid-tied solar photovoltaic (PV) installation in Ghana. Energy Sustain. Dev.48, 82–87. 10.1016/j.esd.2018.11.003
30
MurungiH.KiizaN.NkurunzizaG.SsennonoV. F.AarakitS. M. (2025). Why is there low grid electricity access in rural Uganda? Evidence from the Uganda national household survey. Energy Policy203, 114652. 10.1016/j.enpol.2025.114652
31
NafulaJ. (2023). Environmentalists alarmed over Uganda's annual forest cover loss. Available online at: https://www.monitor.co.ug/uganda/news/national/environmentalists-alarmed-over-uganda-s-annual-forest-cover-loss-4275856 (Accessed 30 September 2025).
32
NPA (2024). Fourth National Development Plan. National Planning Authority, Kampala. Available online at: https://npa.go.ug/national-development-plan/ (Accessed September 22, 2026).
33
NREP (2024). State of Mini-Grids in Uganda. National Renewable Energy Platform. Available online at: https://nrep.ug/technologies/mini-grids/# (Accessed October 11, 2025).
34
OliveiraH.MoutinhoV. F.AfonsoO. (2024). Exploring the relationship between technological progress, human capital, political uncertain, energy consumption, and economic growth: evidence from a panel data analysis. J. Knowl. Econ.16, 13482–13515. 10.1007/s13132-024-02431-9
35
OloyaI. T.GutuT. J.AdaramolaM. S. (2021). Techno-economic assessment of 10 MW centralised grid-tied solar photovoltaic system in Uganda. Case Stud. Therm. Eng.25, 100928. 10.1016/j.csite.2021.100928
36
SharmaV.ChandelS. S. (2013). Performance analysis of a 190 kWp grid interactive solar photovoltaic power plant in India. Energy55, 476–485. 10.1016/j.energy.2013.03.075
37
SharmaR.GoelS. (2017). Performance analysis of a 11.2 kWp roof top grid-connected PV system in eastern India. Energy Rep.3, 76–84. 10.1016/j.egyr.2017.05.001
38
UgandaW. (2023). The Genesis of the Kalangala Power Crisis. WATCHDOG. Available online at: https://www.watchdoguganda.com/news/20230512/153508/the-genesis-of-the-kalangala-power-crisis.html (Accessed October 11, 2025).
39
Uganda Bureau of Statistics (2024). The National Population and Housing Census 2024. UBOS, Kampala. Available online at: https://www.ubos.org/nphc-2024-census-page/ (Accessed September 22, 2026).
40
WafulaS. T.NalugyaA.MendozaH.KansiimeW. K.SsekamatteT.WalekhwaA. W.et al (2023). Indoor air pollutants and respiratory symptoms among residents of an informal urban settlement in Uganda: a cross-sectional study. PLoS One. 18 (8), e0290170. 10.1371/journal.pone.0290170
41
WanambwaR. (2020). News. Kampala International University. Available online at: https://kiu.ac.ug/news-page.php?i=covid-19-updates-uganda-eases-more-lockdown-restrictions (Accessed July 27, 2026).
42
WassieY. T.AdaramolaM. S. (2021). Socio-economic and environmental impacts of rural electrification with solar photovoltaic systems: evidence from southern Ethiopia. Energy Sustain. Dev.60, 52–66. 10.1016/j.esd.2020.12.002
43
WassieY. T.AhlgrenE. O. (2023). Performance and reliability analysis of an off-grid PV mini-grid system in rural tropical Africa: a case study in southern Ethiopia. Dev. Eng. (8), 100106. 10.1016/j.deveng.2022.100106
44
WorldBank (2024). Rural Population (% of Total Population) - UgandaWorld Bank. Available online at: https://data.worldbank.org/indicator/SP.RUR.TOTL.ZS?locations=UG. [Accessed 10 October 2025].
Summary
Keywords
capacity factor, distribution losses, final yield, performance ratio, power plant
Citation
Oloya IT and Adaramola MS (2026) Performance of a solar PV-diesel generator-battery mini-grid using actual data: a case of Kalangala power plant in Uganda. Front. Energy Res. 14:1785084. doi: 10.3389/fenrg.2026.1785084
Received
10 January 2026
Revised
18 August 2026
Accepted
27 August 2026
Published
09 October 2026
Volume
14 - 2026
Edited by
Alok Kumar Verma, Agency for Science, Technology and Research (A*STAR), Singapore
Reviewed by
Chin Leong Wooi, Universiti Malaysia Perlis, Malaysia
Tyoyima Ayua, University of the Gambia, Gambia
Updates

Check for updates
Copyright
© 2026 Oloya and Adaramola.
This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.
*Correspondence: Muyiwa S. Adaramola, muyiwa.adaramola@nmbu.no
Disclaimer
All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.