Abstract
Spring floods represent one of the major natural hazards in snowmelt-dominated river basins of Central Asia. The Nura River basin in Central Kazakhstan is particularly vulnerable because of pronounced interannual runoff variability, limited reservoir regulation capacity, and the hydraulic connection between the Nura and Ishim river systems. This study aimed to provide an integrated basin-scale assessment of spring flood hazards and to identify key hydraulic constraints relevant to flood-risk management. The assessment was based on long-term hydrological observations covering periods of up to approximately 90 years. Extreme spring flood discharges and runoff volumes were estimated using the Kritsky–Menkel frequency-analysis method based on a three-parameter gamma distribution. The analysis was supplemented by assessment of reservoir storage capacities, floodplain topography, channel conveyance, and the Nura–Ishim bifurcation zone using cartographic, digital elevation, and engineering data. The adopted probability distribution was additionally evaluated against alternative flood-frequency models using goodness-of-fit and information criteria. For a 1% exceedance probability, the estimated maximum spring discharges were 752 m3/s at Sheshenkara, 1220 m3/s at Sergiopolskoye, and 2360 m3/s at Romanovskoye. The corresponding 1% spring flood volumes reacheNura River and the distributary system of the Nura–Ishim interfluve may begin at approximately 800 m3/s, with an estimated plausible range of 750–850 m3/s. The interfluve can store approximately 400 million m3 of floodwater, whereas extreme inflow may reach about 350 million m3 per day, compared with a downstream Ishimestimated plausible range of 750–850 m3/s. The interfluve can store approximately 400 million m3 of floodwater, whereas extreme inflow may reach about 350 million m3 per day, compared with a downstream Ishim conveyance capacity of approximately 100–150 million m3 per day. The results demonstrate that extreme spring flood volumes cannot be managed effectively by reservoir regulation alone and that the Nura–Ishim interfluve plays a critical role in floodwater redistribution. Comparison with Austrian flood-risk management practice supports a transition from localized protection toward integrated basin-scale management combining structural measures, controlled retention areas, and spatial planning. The proposed measures include earth embankments with controlled overflow sections, riprap bank protection, and mobile water-filled barriers. auseuse the analysis combines pre- and post-regulation hydrological records and does not include formal non-stationary frequency analysis or detailed two-dimensional hydraulic modeling, the estimates should be interpreted as basin-scale planning values rather than precise local inundation predictions. The findings provide a quantitative basis for strategic flood-risk management and infrastructure resilience in snowmelt-dominated river systems of Central Asia.
1 Introduction
Floods remain one of the most widespread and socially hazardous natural threats worldwide, exerting a significant impact on territorial resilience, economic stability, and public safety (Glas et al., 2023). Recent studies indicate that climatic variability and ongoing climate change may influence the magnitude and timing of flood events in many regions. However, quantifying these effects remains challenging, particularly in continental snow-fed basins characterized by strong interannual variability and limited long-term climatic datasets. Therefore, the present study focuses on the assessment of flood hazards under present-day hydrological conditions using observed long-term records, while the influence of future climate change scenarios is considered beyond the scope of the current work (Wasko et al., 2021). Contemporary studies emphasize that the intensification of spring floods, the increase in runoff variability, and disruptions to the traditional seasonality of hydrological regimes are increasingly driven by the combined effects of climatic variability and anthropogenic factors, including watershed transformation, flow regulation, and the expansion of development within floodplain areas (Tabari, 2020).
International experience in flood risk management in recent years demonstrates a shift from isolated engineering solutions toward comprehensive, integrated approaches. Several recent studies (Wang et al., 2020; Lako and Kerpaci, 2024; Franco and García-Ayllón, 2025; Bubeck et al., 2017) show that effective reduction of flood-related damage is achievable only through the combination of hydrological analysis, spatial modeling, evaluation of engineering measures, and consideration of environmental impacts. Research conducted across various climatic zones of Europe and Asia (Zhang et al., 2022; Suwannachai et al., 2025; Chan et al., 2018, 2022) emphasizes the importance of using long-term observational records, probabilistic analysis of extreme discharges, and spatial assessment of inundation areas to support sound management and engineering decisions. Attention is given to inland continental regions, where a limited drainage network, strong seasonal concentration of runoff, and low adaptive capacity of infrastructure substantially increase vulnerability to flooding.
Inland regions of Eurasia, including Central Asia, rank among the most vulnerable territories in terms of flood hazard. A sharply continental climate, the predominance of snow-fed river regimes, and rapid spring warming (Toleubekova et al., 2025) lead to the formation of short-duration but extremely intense flood events. Unlike regions with well-developed systems of flow regulation and spatial planning, many river basins in Central Asia are characterized by limited reservoir regulation capacity, a high degree of floodplain development, and insufficient integration of scientific assessments into risk management practice. This creates preconditions for large-scale inundation even during floods of relatively low return periods (Wang et al., 2022; Fang et al., 2022; Nurbatsina et al., 2025).
Previous studies conducted in Kazakhstan have provided valuable information on the hydrological regime and flood characteristics of major river basins (Ramazanova et al. (2020) analyzed the geomorphological and landscape features of the Nura River basin and identified areas susceptible to flooding. Shogelova and Sartin (2022) investigated hydrological variability in the principal river systems of Kazakhstan, emphasizing the seasonal nature of runoff formation. Toleubekova et al. (2025) highlighted the role of climatic factors in the intensification of spring flood processes, while Nurbatsina et al. (2025) assessed flood hazards in several regions of Central Kazakhstan. These studies significantly improved understanding of regional hydrological conditions; however, they mainly focused on individual aspects of flood formation, historical events, or general hydrological characteristics. They did not provide an integrated basin-scale assessment combining long-term probabilistic analysis, evaluation of reservoir regulation capacity, spatial interpretation of flood propagation, and assessment of the Nura–Ishim bifurcation mechanism. Consequently, a comprehensive quantitative framework linking hydrological extremes with engineering implications and flood management remains insufficiently developed for the Nura River basin (Figure 1, Table 1).
Figure 1
Table 1
| N | Name of reservoir | Type of regulation | Average inflow, million m3 | Water surface area | Design capacity, million m3 | |
|---|---|---|---|---|---|---|
| total | active | |||||
| 1 | Budennovskoye | Multi-year | 14.0 | 5.1 | 12.6 | 12.3 |
| 2 | Ashchysu Reservoir | Multi-year | 35.0 | 6.8 | 18.0 | 6.8 |
| 3 | Botakara | Multi-year | 18.0 | 15.9 | 28.8 | 15.9 |
| 4 | Tuzdinskoye | Seasonal | 10.3 | 5.9 | 9.0 | 5.9 |
| 5 | Kokpektinskoye | Seasonal | 7.2 | 0.4 | 1.4 | 0.4 |
| 6 | Samarkand Reservoir | Seasonal | 229 | 72 | 87.5 | 72 |
| 7 | Kommunarskoye | Multi-year | 1.3 | 0.4 | 1.1 | 0.4 |
| 8 | Shokayskoye | Multi-year | 8.3 | 1.3 | 4.6 | 1.3 |
| 9 | Ashagandinskoye | Multi-year | 13.8 | 1.6 | 5.0 | 1.6 |
| 10 | Koibas | Multi-year | 1.6 | 0.8 | 1.4 | 0.8 |
| 11 | Tikhonovskoye | Multi-year | 1.6 | 0.5 | 1.4 | 0.5 |
| 12 | Akbastauskoye | Seasonal | 16.1 | 0.8 | 2.3 | 0.8 |
| 13 | Tumatay | Seasonal | 7.3 | 0.7 | 1.0 | 0.7 |
| 14 | Krasnopolenskoye | Seasonal | 169 | 2.1 | 3.5 | 2.1 |
| 15 | Burminskoye | Seasonal | 7.2 | 0.7 | 2.1 | 0.7 |
| 16 | Zhartasskoe | Non-regulated | 181 | 5.0 | 10.0 | 5.0 |
| 17 | Sherubaynura Reservoir | Multi-year | 181 | 38.2 | 180 | 38.2 |
| 18 | Topar Reservoir | Seasonal | 16.2 | 1.1 | 3.1 | 1.1 |
| 19 | Fedorovskoye | Multi-year | 22.0 | 4.3 | 12.8 | 4.3 |
| 20 | Chkalovskoye | Multi-year | 3.8 | 2.0 | 5.5 | 2.0 |
| 21 | Saranskoye | Multi-year | 7.5 | 5.4 | 8.0 | 5.4 |
| 22 | Intumak Reservoir | Multi-year | 446 | 42 | 18.0 | 42 |
| 23 | Samarsky hydrosite | Non-regulated | 450 | 3.9 | 14.0 | 3.9 |
| 24 | Komsomolskoye | Multi-year | 4.1 | 0.4 | 1.0 | 0.4 |
| 25 | Sabyrkozhi | Multi-year | 13.6 | 0.6 | 1.8 | 0.6 |
Main characteristics of the reservoirs within the basin (Aschanova, 2023).
Unlike previous studies, the present research integrates long-term hydrological observations spanning up to 90 years, probabilistic estimation of extreme flood discharges and volumes, analysis of reservoir storage capacities, assessment of channel conveyance limitations, and evaluation of the Nura–Ishim bifurcation zone. This integrated basin-scale approach provides a quantitative basis for identifying critical hydraulic bottlenecks and supporting flood risk mitigation strategies under present-day hydrological conditions (Ramazanova et al., 2020).
The scope of the present study is limited to basin-scale flood hazard assessment and identification of major hydraulic bottlenecks within the Nura River basin. The obtained results are intended to support regional flood risk management and strategic planning rather than to provide detailed site-specific inundation maps or engineering designs for individual settlements and infrastructure facilities.
Thus, a clear research gap is identified, namely the lack of an integrated approach to assessing spring floods and flood risks in the Nura River basin that combines the analysis of long-term hydrological records, spatial assessment of inundation areas, and engineering interpretation of the derived characteristics. The absence of such an approach hampers the justification of effective protective measures, particularly in the context of the risk of transit flooding of territories, including the suburban areas of the capital of Kazakhstan.
The aim of this study is to analyze the hydrological dynamics of spring floods and to provide a quantitative assessment of flood risks in the Nura River basin, considering flow bifurcation into the Ishim River system. The results of the study are intended to establish a scientific basis for the development and justification of engineering measures aimed at reducing inundation risk and improving the management of water infrastructure within the region.
Several limitations of the present study should be noted. The analysis is based on hydrological observation data available for selected gaging stations within the basin, which necessitates the reconstruction of generalized time series and the probabilistic interpretation of extreme characteristics. The spatial assessment of inundation areas was performed using cartographic and topographic materials without the application of detailed two-dimensional hydrodynamic modeling, which may affect the accuracy of local estimates of flow depths and velocities. Nevertheless, the applied approach makes it possible to obtain reliable integrated characteristics of flood hazard at the basin scale.
The scientific contribution of this study lies in the integration of long-term hydrological observations with spatial analysis and engineering assessment of channel conveyance capacity and water management infrastructure. For the first time for the Nura River basin, a comprehensive quantitative assessment of extreme spring floods was carried out, accounting for flow bifurcation and comparing calculated flood volumes with the regulating capacities of existing reservoirs. The practical significance of the study is associated with the potential use of the obtained results in the development of flood mitigation measures, the adjustment of spatial planning schemes, and the enhancement of the resilience of infrastructure and settlements to extreme hydrological impacts under conditions of increasing climate variability.
2 Materials and methods
To achieve the objectives of the study, a comprehensive approach was applied, incorporating the analysis of long-term hydrological observations, design documentation materials, and parameters of existing hydraulic structures. The primary input data used in the study are presented in Table 2.
Table 2
| № | Source | Information |
|---|---|---|
| 1. | Mayr et al. (2023) | Experience in the construction of flood protection structures in Austria for comparative analysis |
| 2. | RSE “Kazhydromet” KazHydromet (2025) | Hydrological observation data |
| 3. | “Lengidroproekt” and PC “Kazgiprovodkhoz” RusHydro (2025), KazGIPROVodKhoz (2025) | Materials of design and survey works |
| 4. | Large-scale topographic maps at a scale of 1:1000000 | |
| 5. | Alimkulov and Myrzakhmetov (2024), Republic of Kazakhstan (2023) | Hydraulic and hydrological reference manuals |
| 6. | Adeke and Mugume (2025) | Methodology for rapid assessment of direct flood damage |
| 7. | Bolgov and Sarmanov (2020) | Methodological developments on water management calculations by S.N. Kritsky and M.F. Menkel |
| 8. | Makki et al. (2024) | Methodological guidelines for assessing the environmental impacts of hydraulic structures |
List of input hydrological data used in the study.
2.1 Study area: Nura River basin
The Nura River basin is located within the sharply continental climatic zone of Central Kazakhstan. The headwaters of the Nura originate in the mountainous areas of the Karkaraly and Ulytau ranges at elevations of approximately 900 m, from where the river, with a total length of 978 km, flows across the plains and discharges into the Tengiz–Korgalzhyn lake system. The floodplain width reaches 10–15 km, with spring inundation depths of 1.5–3.0 m, whereas the main channel is 15–40 m wide with flow depths of 2–4 m.
The hydrological regime is strongly dominated by snowmelt. Approximately 80–90% of the annual runoff occurs during the spring flood period, resulting in pronounced seasonal flow concentration and substantial interannual variability. The principal tributaries include the Sherubaynura, Sokyr, Kon, Kolanotpes, Akbastau, and Matak rivers. Among them, the Sherubaynura River is one of the major tributaries contributing to spring flood formation in the middle reaches of the basin. The morphometric characteristics and principal hydrological roles of the main tributaries are summarized in Table 3.
Table 3
| River | Length (km) | Catchment area (km2) | Main role in flood formation |
|---|---|---|---|
| Nura River | 978 | 58,100 | Main river of the basin; generates the largest spring flood volumes and controls flood propagation toward the Nura–Ishim bifurcation zone |
| Sherubaynura River | 281 | 8,700–10,600 | Major right-bank tributary contributing significantly to spring flood peaks in the middle reaches |
| Sokyr River | 180 | 1,300 | Forms local flood peaks in the upper and middle basin |
| Kon River | 170 | 4,050 | Provides additional snowmelt runoff during high-water years |
| Kolanotpes River | 220 | 25,900 | Contributes to flood formation in the lower part of the basin and Korgalzhyn depression |
| Akbastau River | 83 | 1,570 | Secondary tributary participating in local runoff formation |
| Matak River | – | – | Secondary tributary influencing seasonal flood runoff |
Morphometric characteristics of the main tributaries of the Nura River basin.
A particularly important hydrological feature of the basin is the Nura–Ishim bifurcation zone, located in the middle reaches and extending for approximately 20 km. During extreme high-water conditions, part of the Nura River flow may enter the Ishim River system through the low-lying interfluve and associated distributary channels. This hydraulic connection is of particular relevance to flood-risk assessment because it may facilitate the transfer of floodwater toward areas hydraulically connected with the Ishim system and the vicinity of Astana. The location of the basin, principal river network, major tributaries, reservoirs, hydrometric stations, selected settlements, and the Nura–Ishim bifurcation zone is shown in Figure 1.
2.2 Hydrological data and their coverage
Hydrological information used in this study was obtained from long-term observational records maintained by KazHydromet (2025) and archival hydrological reference publications. The datasets included annual maximum spring flood discharges, flood volumes, and water-level observations from hydrometric stations distributed throughout the Nura River basin (Ramazanova et al., 2020; Republic of Kazakhstan, 2023).
The flood regime of the Nura River basin is controlled by the main channel and several tributaries, among which the Sherubaynura River plays the most important role in the formation of spring flood peaks. Secondary tributaries, including the Sokyr, Kon, Kolanotpes, Akbastau, and Matak rivers, contribute to runoff generation during snowmelt periods and influence the spatial distribution of flood hazards throughout the basin.
Hydrological observations in the Nura River basin have been conducted since the beginning of the 20th century. For example, at the Romanovskoye gaging station, discharge measurements began in 1916; however, the earliest records are fragmentary. From 1931 onward, the observation network was expanded, with up to 47 hydrological stations operating under the supervision of the State Hydrological Institute, KazUGMS, and other agencies, whereas at present only six stations remain in continuous operation (Kazhydromet/EcoData, n.d). The core dataset consists of long-term records of maximum discharges and water levels, as well as volumes of spring runoff, obtained at key gaging stations along the Nura River and its tributaries. This study utilizes observation data from reference stations covering periods of up to nearly 90 years. For instance, data at the Sheshenkara (Proletarskoye) and Sergiopolskoye stations have been available since the 1930s, while the longest continuous record has been formed at the Romanovskoye station. Nevertheless, several cross-sections are characterized by data gaps and relatively short record lengths (Table 4), which were taken into account during statistical processing. To improve the reliability of the assessments, generalized time series of spring floods were reconstructed for an extended period (1935–2024), integrating data from the conditionally natural river regime (prior to 1974) and from the period following the commissioning of the K. Satpayev Canal (Irtysh–Karaganda). Since 1975, the canal has annually contributed up to 130 million m3 of water to the Nura River, thereby altering both the magnitude and the temporal distribution of spring floods. For key cross-sections (e.g., Sergiopolskoye and Romanovskoye), the division of the dataset into two sub-periods made it possible to assess the influence of this anthropogenic factor; however, the primary computational series was adopted as a combined dataset encompassing 90 years of observations.
Table 4
| N | River, cross-section | Active catchment area, km2 | Observation period | Number of years |
|---|---|---|---|---|
| 1 | Nura River – Sheshenkara village (Proletarskoye village) | 8,320 | ||
| 2 | Nura River – Sergiopolskoye village | 12,300 | 1931–2024 | 74 |
| 3 | Nura River – Romanovskoye village | 45,100 | 1932–43, 45–59, 73–2024 | 59 |
| 4 | Sherubaynura River – Kara-Murun village | 8,700 | 1947–50, 57–2024 | 52 |
| 5 | Sherubaynura River – Tsentralny Khutor village | 10,600 | 1931–45, 1947, 1950 | 17 |
| 6 | Sokyr River – Akzhar village (Kurlus) | 1,300 | 1948–53, 1955–97 | 49 |
Reference hydrometric stations.
2.3 Methods of hydrological calculations
Statistical estimation of extreme spring flood characteristics was performed using the Kritsky–Menkel method, which is based on an explicit three-parameter gamma probability distribution. The Kritsky–Menkel approach based on the three-parameter gamma distribution was selected because it represents the standard methodology traditionally adopted in hydrological practice in Kazakhstan and other countries of the former Soviet Union. This method is widely used for estimating extreme flood characteristics in snowmelt-dominated river basins and forms the basis of numerous engineering hydrological guidelines and water management calculations.
To evaluate the robustness of the flood-frequency analysis, the fit of the adopted three-parameter gamma distribution was assessed using goodness-of-fit statistics and compared with alternative probability distributions commonly applied in flood-frequency analysis. The candidate models included the three-parameter gamma distribution used in the Kritsky–Menkel framework, the generalized extreme value (GEV) distribution, and the lognormal distribution. Model performance was evaluated using the Kolmogorov–Smirnov and Anderson–Darling goodness-of-fit statistics, while the Akaike information criterion (AIC) and Bayesian information criterion (BIC) were used for comparative model assessment. Lower AIC and BIC values were interpreted as indicating better relative model support. Particular attention was given to the upper tail of the distributions because the principal objective of the analysis was the estimation of rare spring flood events.
The three-parameter gamma distribution used within the Kritsky–Menkel framework can be expressed in terms of a location parameter , a scale parameter , and a shape parameter . Its probability density function is.
Where is the annual maximum spring discharge (m3/s), is the gamma function, is the shape parameter, is the scale parameter, and is the location parameter. The corresponding cumulative distribution function is
Where denotes the lower incomplete gamma function. Because engineering flood-frequency calculations are conventionally expressed in terms of exceedance probability, the exceedance probability associated with a discharge is
The statistical moments of the observed annual maximum discharge series were estimated using
Where is the observed annual maximum discharge in year , is the number of observations, is the long-term mean annual maximum discharge, is the sample standard deviation, is the coefficient of variation describing the relative dispersion of the annual maxima, and is the coefficient of skewness characterizing the asymmetry of the empirical frequency distribution.
Under the three-parameter gamma representation, the distribution parameters are related to the first three moments. For the shifted gamma distribution, the theoretical coefficient of skewness is
from which the shape parameter is obtained as
The scale and location parameters can then be expressed as
For a specified exceedance probability , the corresponding design discharge is obtained from the inverse cumulative distribution function as
Thus, , 0.05, 0.02, 0.01, and 0.001 correspond to exceedance probabilities of 10, 5, 2, 1, and 0.1%, respectively. The same frequency-analysis procedure was applied to spring flood runoff volumes , with the corresponding long-term mean , coefficient of variation , and coefficient of skewness .
For each hydrometric station, the long-term mean value, coefficient of variation (Cv), and coefficient of skewness (Cs) were calculated from the available annual series of maximum discharges and spring flood runoff volumes. These statistical moments were subsequently used to determine the parameters of the three-parameter gamma distribution and to derive design values corresponding to exceedance probabilities of 0.1, 1, 2, 5, and 10%.
Hydrological time series used in the analysis contain gaps and periods with incomplete observations. Missing annual values were not reconstructed by interpolation or regression techniques. Statistical parameters were estimated exclusively from observed data. For stations with fragmented records, hydrologically homogeneous observation periods were combined to improve the representativeness of long-term flood statistics. Years with unreliable measurements or incomplete observations were excluded from the analysis. Therefore, the generalized series represent integrated observational datasets rather than artificially reconstructed annual records.
Prior to the probabilistic calculations, the hydrological records were examined for possible temporal changes using visual inspection of the time-series plots and cumulative-sum curves, together with a descriptive comparison of the mean values and variability between observation periods. Particular attention was given to the change in flow conditions associated with the commissioning of the Irtysh–Karaganda (K. Satpayev) Canal in 1975. These procedures were used as exploratory diagnostics of potential regime differences rather than as formal tests of homogeneity or stationarity. No statistical change-point or stationarity tests were performed; therefore, the existence, timing, and statistical significance of potential shifts cannot be established quantitatively from the present analysis (Table 5).
Table 5
| River–cross-section | Water management site | Long-term average parameters | Design water discharges of different probabilities, m3/s | ||||||
|---|---|---|---|---|---|---|---|---|---|
| Qo, mз/с | Cv | Cs | 0.1% | 1% | 2% | 5% | 10% | ||
| Nura River–Sheshenkara village | 06-55-00-1 | 151 | 1.09 | 2.10 | 1,140 | 752 | 635 | 482 | 363 |
| Nura River–Sergiopolskoye village | 260 | 1.02 | 2.05 | 1,840 | 1,220 | 1,040 | 792 | 603 | |
| Nura River–Romanovskoye village | 06-55-00-4 | 502 | 1.02 | 2.04 | 3,550 | 2,360 | 1,980 | 1,530 | 1,170 |
| Sherubaynura River–Kara-Murun settlement | 06-55-00-5 | 152 | 1.09 | 2.05 | 1,140 | 753 | 637 | 484 | 366 |
| Kon River–Birlik wintering | 06-55-00-6 | 126 | 0.96 | 1.92 | 820 | 552 | 489 | 365 | 283 |
| Kolanotpes River–1st division, Kurgaldzhin state farm | 333 | 0.65 | 0.98 | 1,301 | 981 | 899 | 737 | 622 | |
Design maximum discharges of spring floods.
Although the commissioning of the Irtysh–Karaganda (K. Satpayev) Canal altered the hydrological regime of the Nura River, the available observations were also analyzed as a combined long-term record to preserve the record length required for flood-frequency estimation. The combined series should not be interpreted as a demonstrably homogeneous or stationary statistical population. Rather, it was used as an integrated historical record describing the range of flood conditions observed across both the pre-regulation and post-regulation periods. Because no formal change-point or stationarity tests were applied, the resulting exceedance-probability estimates are conditional on this treatment of the record and should be interpreted with corresponding caution. Separate consideration of the pre-1975 and post-1975 observations was used only to examine potential differences associated with anthropogenic regulation qualitatively (Tasmagambetova, 2025).
The described procedure ensures transparency and reproducibility of the calculations, as all stages of data processing—from data selection and quality control to parameter estimation and probability calculation—are explicitly defined.
The study did not aim to reconstruct missing annual flood values using regression methods or correlation-based infilling techniques. Therefore, correlation coefficients and uncertainty estimates associated with missing data reconstruction were not evaluated. The generalized datasets were used only to characterize long-term basin-scale flood variability and were based exclusively on available observations.
The study did not include formal statistical tests for detecting change points or evaluating the significance of differences between the pre-regulation and post-regulation periods. Therefore, the separation of the hydrological record was based on the known timing of the Irtysh–Karaganda Canal commissioning and its documented influence on river flow conditions. Future studies may incorporate change-point detection methods and trend analyses to provide a more rigorous assessment of non-stationarity.
2.4 Cartographic analysis and assessment of hydraulic structures
To assess potential inundation areas and channel conveyance capacity, a cartographic analysis of the floodplain relief was carried out. Based on topographic maps at a scale of 1:1,000,000, a longitudinal profile of the Nura River valley from its source to its mouth was constructed, showing channel bed elevations, floodplain bank crest levels, and calculated maximum water levels for rare exceedance probabilities (e.g., the 1% flood). This made it possible to identify critical reaches where, under extreme spring floods, water may overtop the channel. In the upper reaches of the Nura River, no significant exceedance of water levels above the riverbanks is observed up to approximately river kilometer 170. However, in the middle reaches, as the longitudinal slope decreases, the calculated flood levels begin to exceed the elevations of the floodplain margins. The most vulnerable section was identified in the upstream pool of the Samarkand Reservoir, where maximum water levels potentially exceed the floodplain bank elevations. This conclusion is supported by field observations during the exceptionally high spring floods of 2024, when overbank flooding occurred in the downstream reach of the Samarkand Reservoir, resulting in inundation of adjacent settlements, including the villages of Chkalovo, Gagarinskoye, Rostovka, and others. In the area of the under-construction Intumak Reservoir, exceedance of water levels above earthen embankments is also projected; the reconstruction project provides the construction of a 4 m high flood protection dam to safeguard nearby settlements. These river reaches may be exposed to increased flood hazard during extreme spring floods. The present analysis identifies potentially vulnerable areas at the basin scale and should not be interpreted as a detailed prediction of inundation extent for individual settlements. To protect the most vulnerable areas in the interfluve between the Nura and Ishim rivers, the design documentation also provides for the construction of embankments to prevent the transfer of floodwaters into the adjacent basin.
The spatial analysis was based primarily on topographic maps at a scale of 1:1,000,000 and available engineering documentation. Such cartographic materials are appropriate for basin-scale characterization of valley morphology and identification of major hydraulic bottlenecks. However, their horizontal and vertical resolution is insufficient for detailed assessment of inundation depths and flood extents at the scale of individual settlements. Therefore, the obtained results should be interpreted as indicative basin-scale estimates rather than precise local flood maps.
In the analysis of the bifurcation area within the Nura–Ishim interfluve, the potential storage capacity of this natural depression and the conveyance capacity of the main channels were assessed. Calculations based on a digital elevation model showed that the interfluve (via distributaries such as Sarkyrama, Kozgosh, and others) is capable of accumulating up to 400 million m3 of floodwaters. This capacity may be reached during extremely rare spring floods (p = 0.1%), when the daily inflow of water from the Nura River into the interfluve is estimated to reach up to 350 million m3. At the same time, the outflow of water from the interfluve along the Ishim River channel downstream of the city of Astana is constrained by a conveyance capacity of approximately 100–150 million m3 per day, due to the presence of the Ishim hydraulic complex (dam) within the urban area. The imbalance between inflow from the Nura River and discharge into the Ishim River implies a rapid rise in water levels within the interfluve during extreme floods, posing a risk of large-scale inundation of the southwestern outskirts of the capital. These hydrological calculations and the characteristics of hydraulic structures (embankments, canals, reservoirs) were taken into account in the development of a set of engineering measures aimed at reducing flood risk. The parameters of existing hydraulic facilities (including the Samarkand Reservoir, the Ishim hydraulic complex, and others), as well as proposed design solutions, were obtained from technical documentation (KazGIPROVodKhoz, 2025; Alimkulov and Myrzakhmetov, 2024) and reference sources (Republic of Kazakhstan, 2023; Adeke and Mugume, 2025), enabling comparison of the calculated flood parameters with the actual capacities of the water management system. This interdisciplinary approach—combining hydrological modeling with topographic and engineering survey data—provided a comprehensive assessment of spring flood dynamics and substantiated the proposed territorial protection measures. The cartographic basis employed in this study does not provide sufficient spatial resolution for detailed hydraulic modeling or for estimating water depths and inundation boundaries at the level of individual buildings and infrastructure facilities. Consequently, local flood hazards should be evaluated using large-scale topographic surveys, digital elevation models, and two-dimensional hydrodynamic simulations.
The critical discharge for the onset of overflow from the Nura River toward the Nura–Ishim bifurcation zone was estimated by relating the hydraulic elevation controlling the overflow to the corresponding discharge conditions at the Romanovskoye gaging station. The controlling hydraulic feature is the separating embankment at the entrance to the Sarkyrama distributary, which was raised in 1974 to approximately 3 m and has a reported crest elevation of about 353 m BS. During high-flow conditions, overflow becomes possible when the Nura River flood stage approaches or exceeds the elevation of this embankment and the adjacent low watershed divide.
Available historical flood observations, water-level records at the Romanovskoye gaging station, and engineering documentation for the Sarkyrama distributary were jointly examined to identify discharge conditions associated with the onset of overflow. The historical record indicates that the maximum observed discharge at Romanovskoye reached 1,064 m3/s during the 1972 flood, when substantial overflow into the interfluve was reported. Comparison of the documented flood stages, the controlling embankment elevation, and the corresponding discharge conditions indicates that overflow begins at a lower discharge, on the order of 800 m3/s. This value was therefore adopted as the representative critical discharge for the onset of hydraulic connection between the Nura River and the Sarkyrama–Kozgosh–Mukyr distributary system:
The value should not be interpreted as an exact deterministic threshold derived from a calibrated hydraulic rating relationship. Detailed cross-sectional surveys and a calibrated one- or two-dimensional hydraulic model of the distributary system were not available. Considering the variability of historical flood observations and the spatial resolution of the available cartographic and engineering data, the plausible threshold range was estimated as approximately 750–850 m3/s. Accordingly, 800 m3/s represents the central engineering estimate used in the basin-scale assessment. More precise determination of would require detailed cross-sectional surveys, stage–discharge relationships for the bifurcation entrance, and calibrated hydraulic modeling of the Sarkyrama–Kozgosh–Mukyr system.
Because detailed cross-sectional surveys and calibrated hydraulic models for the individual distributaries were not available, the uncertainty of this threshold was not quantified rigorously. Based on the variability of historical flood observations and the limited resolution of the cartographic and design data, the overflow threshold is considered to lie within an approximate range of 750–850 m3/s. More precise estimation of the threshold discharge would require detailed field surveys, rating-curve analysis, and one-dimensional or two-dimensional hydraulic modeling of the Sarkyrama–Kozgosh distributary system.
The probabilistic analysis was performed within a conventional frequency-analysis framework using the available long-term observations. No climate covariates, formal change-point models, or non-stationary flood-frequency models were incorporated. Accordingly, the estimated exceedance probabilities characterize the integrated historical record used in the analysis and should not be interpreted either as estimates derived from a formally stationary population or as projections of future flood conditions. Assessment of temporal changes in flood-frequency parameters represents an important direction for further research.
The study is based exclusively on observational and published data sources (Table 6). Hydrological characteristics were derived from long-term records provided by Kazhydromet and supplemented by hydrological reference publications and engineering documentation related to reservoirs and flood-control structures. Probabilistic calculations were performed using the Kritsky–Menkel method following the engineering hydrology practices traditionally adopted in Kazakhstan. The cartographic analysis relied on topographic maps at a scale of 1:1,000,000 and available engineering materials. No interpolation of missing annual values or numerical hydraulic simulations were performed. The methodological framework and input datasets described in the manuscript provide sufficient information for reproducing the basin-scale calculations.
Table 6
| Dataset | Source | Time period | Application |
|---|---|---|---|
| Maximum spring discharges | Kazhydromet | 1931–2024 | Frequency analysis |
| Flood volumes | Kazhydromet | 1931–2024 | Volume estimates |
| Water levels | Hydrometric stations | 1931–2024 | Hydraulic interpretation |
| Reservoir characteristics | Design documentation | Various years | Storage assessment |
| Topographic maps (1:1,000,000) | National cartographic materials | – | Spatial analysis |
| Historical flood information | Published literature | Various years | Validation |
Summary of input data and sources.
3 Results
3.1 Design characteristics of spring floods
The analysis of the statistical characteristics of spring floods shows that the Nura River generates large volumes of runoff over a short period (Table 7). At key cross-sections—Sheshenkara, Sergiopolskoye, and Romanovskoye—design maximum flood discharges (Qmax) corresponding to different exceedance probabilities were calculated. At the 1% exceedance level (100-year flood), the expected maximum discharges are approximately 752 m3/s at Sheshenkara, 1220 m3/s at Sergiopolskoye, and 2,360 m3/s at Romanovskoye. For more frequent events with 5 and 10% exceedance probabilities, the design peak discharges are substantially lower: for example, Q5% values are 482 m3/s (Sheshenkara), 792 m3/s (Sergiopolskoye), and 1,530 m3/s (Romanovskoye), while Q10% values are 363, 603, and 1,170 m3/s, respectively. These values considerably exceed the long-term mean maximum discharges. For instance, at Romanovskoye the long-term average maximum discharge is estimated at only 502 m3/s, meaning that the 1% design flood exceeds this value by nearly a factor of five. The design volumes of spring floods (W) also increase with decreasing exceedance probability. At the Sergiopolskoye cross-section, the 1% flood volume reaches 0.60 km3 (600 million m3), while the 10% flood volume is approximately 0.31 km3. At Romanovskoye, these volumes are even larger, amounting to 1.62 km3 for the 1% event and 0.87 km3 for the 10% event. Overall, spring floods account for up to 90–95% of the annual runoff of the Nura River, highlighting their dominant role in the river’s hydrological regime.
Table 7
| River–cross-section | Water management site | Runoff calculation period, years | Long-term average parameters | Design water volumes of different probabilities, km3 | ||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Wo, kmз | Cv | Cs | 1% | 2% | 5% | 10% | 25% | |||
| Nura River–Sergiopolskoye village | 06-55-00-1 | 1935–2024 | 0.14 | 0.96 | 1.92 | 0.60 | 0.50 | 0.40 | 0.31 | 0.19 |
| Nura River–Romanovskoye village | 06-55-00-4 | 1935–2024 | 0.41 | 0.86 | 1.72 | 1.62 | 1.45 | 1.10 | 0.87 | 0.56 |
| Sherubaynura River–Tsentralny Khutor settlement | 06-55-00-5 | 1933–45, 47–50 | 0.12 | 0.94 | 1.88 | 0.54 | 0.44 | 0.36 | 0.28 | 0.17 |
| Kolanotpes River–1st division, Kurgaldzhin state farm | 06-55-00-6 | – | 0.15 | 0.65 | 1.30 | 0.47 | 0.43 | 0.34 | 0.28 | 0.20 |
| Kon River–Birlik wintering | – | 0.07 | 0.91 | 1.82 | 0.28 | 0.25 | 0.19 | 0.15 | 0.10 | |
Design spring flood volumes.
Observed data confirm the calculated estimates of extreme spring floods (Tables 8, 9). In the Nura River basin, the most significant flood events were recorded in 2001, 2002, 2004, 2015, and 2024 (Toxanbayeva et al., 2021; Alagudzhaeva et al., 2023; Mustafayev et al., 2025). During these periods, water levels and discharges substantially exceeded normal conditions; for example, the 2002 flood was characterized by maximum discharges and runoff volumes that were two to three times higher than long-term average values across most rivers of the basin. Historically, the highest recorded discharge of the Nura River at the Romanovskoye station (in 1972) reached 1,064 m3/s, which is close to the design flood with a 10% exceedance probability (1,170 m3/s). Recent extreme events, such as the spring flood of 2024, further confirmed the tendency toward reaching and exceeding calculated design peaks. In 2024, floodwaters surpassed previous maxima and resulted in widespread inundation across the basin. Thus, the calculated Qmax and W values for the main cross-sections are consistent with the magnitudes observed during the largest floods of both past and recent decades.
Table 8
| River – station | Distance from the mouth, km | Datum “0” of the gage chart, m BS | Maximum amplitude, cm | Date | Maximum water level, m BS |
|---|---|---|---|---|---|
| Nura River–Bes-Oba village | 894 | 709.31 | |||
| Nura River–Proletarskoye village | 780 | 543.0 | 473 | 23.04.1954 | 547.73 |
| Nura River–Sergiopol village | 705 | 488.2 | 789 | 15.04.1943 | 496.09 |
| Nura River–Volkovskoye village | 576 | 452.0 | 418 | 15.04.1943 | 456.18 |
| Nura River–Preobrazhenskoye village | 369 | 349.8 | 597 | 26.04.1921 | 355.77 |
| Nura River–Romanovskoye village | 369 | 349.65 | 864 | 17.04.1943 | 358.29 |
Observed amplitudes of water level fluctuations.
Table 9
| River–station | Distance from the mouth, km | Water levels and discharges of different probabilities, % | |||
|---|---|---|---|---|---|
| 0.01 | 1.0 | ||||
| Water level | Discharge, m3/s | Water level | Discharge, m3/s | ||
| Nura River–hydropost No. 5, 1 km upstream of the outlet | 677 | 486.70 | 2,640 | 484.68 | 1,270 |
| Nura River–Chkalovo village | 672 | 485.70 | 2,640 | 484.40 | 1,280 |
| Nura River–Tegizhzhol village | 660 | 485.80 | 2,930 | 484.00 | 1,540 |
| Nura River–Rostovka village | 652 | 470.05 | 3,020 | 469.50 | 2,260 |
| Nura River–hydropost, Molodetskoye village | 631 | 465.10 | 2,260 | ||
| Nura River–Zakharovka village | 550 | 424.70 | 4,200 | 421.80 | 2080 |
| Nura River–Korgalzhyn settlement | 194 | 324.70 | 3,700 | 323.20 | 1800 |
Water levels (cm) for different exceedance probabilities.
3.2 Goodness-of-fit and comparative flood-frequency analysis
To evaluate the robustness of the flood-frequency estimates, the probability distribution adopted in the Kritsky–Menkel framework was subjected to goodness-of-fit assessment and compared with alternative distributions commonly used in flood-frequency analysis. The comparison included the three-parameter gamma distribution adopted in the primary calculations, the generalized extreme value (GEV) distribution, and the lognormal distribution. Model performance was evaluated using the Kolmogorov–Smirnov and Anderson–Darling statistics, together with the Akaike information criterion (AIC) and Bayesian information criterion (BIC). Particular attention was given to the upper tail of the distributions because the principal purpose of the analysis was the estimation of rare spring flood events.
The goodness-of-fit statistics for the annual maximum discharge series are summarized in Table 10. Rather than relying on a single diagnostic, the candidate distributions were evaluated jointly on the basis of their goodness-of-fit statistics and information criteria. This approach provides a more robust assessment of distributional uncertainty and makes it possible to determine whether the design estimates obtained using the Kritsky–Menkel framework are sensitive to the assumed probability model.
Table 10
| Station | n | Distribution | Kolmogorov–Smirnov statistic (KS) | p-value | Anderson–Darling statistic (AD) | Akaike information criterion (AIC) | Bayesian information criterion (BIC) | Rank |
|---|---|---|---|---|---|---|---|---|
| Sergiopolskoye | 74 | Gamma/Kritsky–Menkel proxy | 0.057 | 0.957 | 0.294 | 963.30 | 967.91 | 1 |
| GEV | 0.051 | 0.984 | 0.243 | 973.28 | 980.20 | 2 | ||
| Lognormal | 0.130 | 0.148 | 2.023 | 986.03 | 990.64 | 3 | ||
| Romanovskoye | 59 | Gamma/Kritsky–Menkel proxy | 0.073 | 0.892 | 0.315 | 863.13 | 867.29 | 1 |
| GEV | 0.104 | 0.513 | 0.586 | 871.85 | 878.08 | 3 | ||
| Lognormal | 0.087 | 0.733 | 0.689 | 868.91 | 873.06 | 2 | ||
| Kara-Murun | 52 | Gamma/Kritsky–Menkel proxy | 0.052 | 0.998 | 0.168 | 627.84 | 631.75 | 1 |
| GEV | 0.071 | 0.942 | 0.330 | 637.97 | 643.82 | 3 | ||
| Lognormal | 0.100 | 0.639 | 0.706 | 634.35 | 638.25 | 2 |
Goodness-of-fit and model-selection statistics for probability distributions fitted to annual maximum spring discharges.
The goodness-of-fit results indicate that the candidate probability distributions provide different levels of agreement with the observed annual maximum discharge series. Model performance was therefore assessed using several complementary criteria rather than a single statistical test. The Kolmogorov–Smirnov and Anderson–Darling statistics were used to evaluate agreement between the fitted and empirical distributions, whereas AIC and BIC were used to compare the relative statistical support for the candidate models. Particular emphasis was placed on the representation of the upper tail, which directly controls the estimation of low-exceedance-probability floods (Table 11).
Table 11
| Station | Distribution | Q10% | Q5% | Q2% | Q1% | Q0.1% |
|---|---|---|---|---|---|---|
| Sergiopolskoye | Kritsky–Menkel—manuscript | 603 | 792 | 1,040 | 1,220 | 1840 |
| Synthetic gamma benchmark | 564 | 740 | 973 | 1,150 | 1740 | |
| Synthetic GEV | 542 | 802 | 1,290 | 1817 | 5,386 | |
| Synthetic lognormal | 807 | 1,357 | 2,438 | 3,603 | 10,760 | |
| Romanovskoye | Kritsky–Menkel—manuscript | 1,170 | 1,530 | 1980 | 2,360 | 3,550 |
| Synthetic gamma benchmark | 1,172 | 1,481 | 1882 | 2,183 | 3,168 | |
| Synthetic GEV | 1,127 | 1,521 | 2,162 | 2,766 | 5,845 | |
| Synthetic lognormal | 1,338 | 1940 | 2,948 | 3,896 | 8,511 | |
| Kara-Murun | Kritsky–Menkel—manuscript | 366 | 484 | 637 | 753 | 1,140 |
| Synthetic gamma benchmark | 367 | 490 | 654 | 780 | 1,201 | |
| Synthetic GEV | 383 | 647 | 1,247 | 2021 | 9,747 | |
| Synthetic lognormal | 458 | 775 | 1,399 | 2076 | 6,269 |
Alternative-distribution design discharges.
Comparison of the estimated flood quantiles demonstrates the effect of probability-distribution choice on design flood magnitude. Differences among the candidate models are comparatively less important for more frequent floods and become increasingly relevant toward the low-probability upper tail. This behavior is particularly important for the 1 and 0.1% exceedance probabilities used in flood-protection planning. Consequently, rare-event estimates should be interpreted together with the uncertainty associated with probability-model selection rather than as exact deterministic values.
3.3 Comparison of flood volumes with reservoir storage capacity
The calculated spring flood volumes substantially exceed the storage capacities of the major reservoirs within the basin. The reservoir characteristics presented in Table 1 distinguish between total and active storage capacities. This distinction is important because the total reservoir capacity does not necessarily represent the storage volume available for flood attenuation under actual operating conditions. Therefore, total and active storage capacities were considered separately when interpreting the regulating role of the reservoir system.
The magnitude of the design spring flood volumes demonstrates the limited capacity of the existing reservoir system to retain extreme floodwaters. At the Sergiopolskoye cross-section, the 1% design spring flood volume is approximately 0.60 km3 (600 million m3), increasing to 1.62 km3 (1,620 million m3) at Romanovskoye. Even the 10% design flood volume at Romanovskoye reaches approximately 0.87 km3 (870 million m3). These volumes are substantially greater than the storage capacities of the individual reservoirs presented in Table 1. Consequently, the reservoirs may attenuate flood peaks and temporarily retain part of the incoming floodwater, but they cannot provide complete retention of extreme spring flood volumes. During exceptionally high floods, excess water must therefore be conveyed downstream or redistributed through the river and floodplain system.
To evaluate the calculated design discharges in the context of previously reported values, the estimates obtained in the present study were compared with data from previous regional studies and national engineering practice (Table 12). The comparison indicates that the magnitude of the differences varies among stations and exceedance probabilities. The discrepancies are more pronounced at Romanovskoye, particularly for low-exceedance-probability floods, whereas the estimates for Sergiopolskoye show closer agreement for the more frequent design events. These differences should be interpreted in view of possible differences in observation periods, input datasets, and statistical procedures used to derive the respective design estimates.
Table 12
| Hydrometric station | Probability (%) | This study (m3/s) | Previous study (m3/s) | Source | National engineering practice (m3/s) | Difference (%) |
|---|---|---|---|---|---|---|
| Romanovskoye | 1 | 2,360 | 1,020 | Ramazanova et al. (2020) | 1,080 | +118.5% |
| Romanovskoye | 5 | 1,530 | 810 | Ramazanova et al. (2020) | 850 | +80.0% |
| Sergiopolskoye | 1 | 1,220 | 950 | Nurbatsina et al. (2025) | 995 | +22.6% |
| Sergiopolskoye | 5 | 792 | 740 | Nurbatsina et al. (2025) | 775 | +2.2% |
Comparison of design flood estimates with previous studies and engineering practice.
3.4 Channel conveyance capacity and overflow risks in the Nura–Ishim bifurcation zone
3.4.1 Hydraulic characteristics of the Nura–Ishim bifurcation
An assessment of the conveyance capacity of the Nura River channel identified critical reaches, particularly in the Nura–Ishim bifurcation area downstream of Romanovskoye village. The bifurcation zone of the interfluve, approximately 20 km in length, is characterized by the diversion of part of the Nura River discharge into the Ishim River basin during high flood events. The combined interpretation of historical flood observations, available water-level records, and engineering documentation indicates that overflow from the Nura River into the Sarkyrama–Kozgosh distributary system may begin when the main-channel discharge approaches approximately 800 m3/s. As described in Section 2.3, this value represents an approximate engineering threshold rather than a precisely calibrated hydraulic limit. This threshold is lower than the 10% design discharge estimated for the Romanovskoye cross-section (1,170 m3/s), indicating that hydraulic connection with the bifurcation system may begin before the Nura River reaches the calculated 10% design flood magnitude.
The Nura–Ishim interfluve downstream of 15 km below Romanovskoye village contains a water bifurcation zone approximately 20 km in length. In 1974, the height of the embankment on the Sarkrama distributary near the Nura River was increased to 3 m, with a crest elevation of 353 m BS. According to hydraulic calculations, overflow across the embankment occurs when discharges in the Nura River reach approximately 800 m3/s (Figure 1). Available data indicate that the main portion of the diverted flow from the Nura River has historically passed through the Sarkrama distributary.
The interfluve territory within the bifurcation zone represents a valley-shaped depression up to 6 km wide, with an overall gradient of about 0.45‰ toward the Ishim River. The lowest points of the watershed are located 1–5 km from the right bank of the Nura River and rise only 1.5–2.0 m above the low-water level of the river (while the spring flood stage at Romanovskoye exceeds 5 m). The connection between the Nura and the Ishim rivers usually occurs through three distributaries—Sarkrama, Kozgosh, and Mukyr (Figure 2)—which merge into a single channel (Kozgosh) approximately 9 km upstream of the Ishim River. The Kozgosh channel discharges into the Ishim River near the settlements of Talapker and Vozdvizhenka. The storage capacity of the Nura–Ishim interfluve (in the area of the Sarkrama, Kozgosh, and Mukyr distributaries) is estimated at about 400 million m3.
Figure 2
When the Nura River overflows into distributaries shared with the Ishim River, the inflow of water into the interfluve may reach up to 350 million m3 per day during an extreme spring flood (p = 0.1%) (Figure 2). The outflow along the Ishim River downstream of the capital is limited to approximately 130–150 million m3 per day. Any additional inflow volumes will result in backwater effects and flooding of the southwestern and western parts of Astana.
3.4.2 Historical evidence of overflow and flood events
Historical records confirm the occurrence of periodic overflows. Prior to the raising of the embankment along the Sarkrama distributary (in 1974, when the crest elevation was increased to 353 m BS), the Nura River regularly diverted into the Ishim basin during major spring floods, as documented in 1928, 1941, 1948, 1960, 1972, and other years. In the post-regulation period, similar episodes were also recorded, including during the floods of 2001 and 2002, when a portion of the Nura River spring runoff was again directed into the interfluve. Thus, on a decadal timescale or more frequently, situations arise in which the conveyance capacity of the Nura River channel in the bifurcation zone is exceeded, resulting in overbank flow into the floodplain and further diversion through distributaries toward the Ishim River.
Under the current crest elevation of the embankment on the Sarkrama distributary, overflow toward the Ishim River via the Sarkrama channel occurred during the period of continuous observations at the Romanovskoye gaging station from 1928 to 2004 in the years 1928, 1941, 1945, 1948, 1949, 1960, 1972, 1990, and 1993. According to testimonies of residents of the interfluve (the village of Koshchi), in 1972 the area was predominantly inundated by waters of the Nura River, with the maximum discharge recorded at the Romanovskoye gaging station reaching 1,064 m3/s. The same sources report that Nura River waters entered the interfluve in 1988, 1991, 1996, 2001, and 2002.
Under current conditions, diversion of the Nura River discharge into the Ishim River occurs at approximately the 10% exceedance level.
During extreme spring floods, the risk of uncontrolled overflow increases substantially. According to the design maximum scenario (a flood with a 0.1% exceedance probability), up to 350 million m3 of floodwater per day may be diverted into the Nura–Ishim interfluve. At the same time, the Ishim River downstream of the city of Astana is capable of safely conveying only about 130–150 million m3 per day. Exceedance of this threshold results in backwater effects and inundation of extensive areas, primarily the low-lying districts of the southwestern and western outskirts of Astana. The spring flood of 2024 provides clear confirmation of this mechanism. In 2024, overtopping of embankments and channel overflow were observed simultaneously at several locations. In the upstream pool of the Samarkand Reservoir, water levels exceeded bank elevations, while similar overflow of floodwaters was recorded in the downstream reach below the dam. As a result, adjacent settlements were inundated, including the villages of Chkalovo, Gagarinskoye, Andronikovo, Tengizhol, Rostovka, and Bereznyaki. In the vicinity of the Intumak Reservoir, the 2024 flood was also characterized by exceedance of the maximum calculated flood levels, leading to flooding of settlements such as Intumak, Prudy, Samarskoye, and others, and confirming the insufficiency of channel conveyance capacity. Thus, during extreme spring floods, the Nura River channel system is unable to contain the entire volume of water within its banks, and a significant portion of the runoff is diverted through the bifurcation into the Ishim River, creating a risk of transit flooding of downstream territories, including areas up to the vicinity of the capital. These results quantitatively identify the bottlenecks of the system and highlight the high probability of overflows during rare catastrophic floods similar to the 2024 event.
An artificially induced flood in May 2004, caused by water releases from the “Alva” liman system (Botantayeva et al., 2025), resulted in the inundation of a bridge, which for an entire month deprived the residents of the settlement of Korgalzhyn of the ability to travel to the central village to attend school (Figures 3, 4), go to work, access shops and medical facilities, or obtain drinking water. Instead of traveling a distance of 1 km, residents were forced to make detours of up to 30 km. In high-water years, flooding of parts of settlements located along the banks of the Nura River also occurs.
Figure 3
Figure 4
3.4.3 Spatial exposure and vulnerable areas
According to data from the Karaganda Regional Department for Emergency Situations, extensive areas within the Nura River basin are subject to inundation by floodwaters, affecting both settlements and transport infrastructure facilities (Akimat of Karaganda Region, 2025).
Within Karaganda Region, the following areas are classified as flood-risk zones:
in Abay District—the city of Karaganda, dacha (summer house) areas, as well as the settlements of Talap, Krasny Kut, Samarsky, Esengeldy, Zakharovka, Tlyakhovka, Aktobe, Rodniki, and Tikhonovka;
in Bukhar-Zhyrau District—the settlements of Andronikovo, Tengizhol, Amangeldy, Rostovka, Bereznyaki, Samarkand, the 1st division of the Timiryazev collective farm, Nurinskaya railway station, Zarechnoye, Sadovoye, Gagarinskoye, and Chkalovo;
in Shet District—the settlements of Mointy, Prostornoye, Mukhtarskoye, Derensal, Koktenkol, Burma, Kairakty, Batyk, and the village of Zhamnshi.
Within Akmola Region, areas prone to flooding include:
in Tselinograd District—the settlements of Sadyrbay, Orazak, Birlik, and Zhanazhol;
in Korgalzhyn District—the village of Korgalzhyn, the automobile bridge near this settlement, as well as the settlement of Sabyndy.
In addition to residential areas, significant damage is recorded within the regional transport network. Vulnerable sections include:
national highways: Karaganda–Balkhash (a 2 km section including a bridge), Karaganda–Ayaguz (0.5 km, bridge span 25 m), Pavlodar–Kyzylorda (2.5 km);
local roads: Atasu–Ainabulak (3 km), Koksu–Zhanatas (1.5 km), Sabyrkoda (2 km), the section of JSC “YUTRU” / PE “SDA” (2 km), as well as the road near the gardening cooperative “Sarepta” (1.5 km).
The analysis of inundation by floodwaters was carried out using cartographic materials at a scale of 1:1,000,000 and other sources. Based on these materials, a longitudinal profile of the Nura River from its source to its mouth was constructed, on which the riverbed, right and left floodplain margins, elevations corresponding to the maximum discharge with a 1% exceedance probability, and local toponyms used for spatial orientation along the river course were plotted. Analysis of the profile indicates that in the upper reaches, up to approximately river kilometer 170, no significant sections are observed where the maximum flood levels exceed the floodplain margins.
As the terrain slope decreases and, consequently, the riverbed gradient diminishes, sections are identified where the calculated water levels exceed the elevations of the floodplain margins. Particularly significant exceedances are observed in the area of the upstream pool of the Samarkand Reservoir. In the downstream pool of this reservoir, similar phenomena are also confirmed by field observations during the 2024 flood, when the settlements of Chkalovo, Gagarinskoye, Andronikovо, Togiszhol, Rostovka, and Bereznyaki were inundated.
3.4.4 Engineering implications for flood protection
In the vicinity of the Intumak Reservoir, exceedances of maximum flood levels have likewise been recorded; the project provides the construction of a flood protection dam approximately 4.0 m in height. Further downstream, the probability of flooding and waterlogging remains for the settlements of Intumak, Prudy, Samarskoye, as well as Esengeldy, Plakhovka, and Izumrudny. Localized overbank flow may also occur farther downstream, and in the reach around 550–600 km, flooding of the villages of Akhetaul and Romanovka and the settlement of Pravoberezhny is possible. To protect these areas and to prevent the diversion of Nura River floodwaters into the Ishim River basin, the project provides for the construction of a protective embankment. Downstream, zones of potential inundation extend to the settlements of Borly, Orzak, Zhanazhol, as well as Sadyrbay, Korgalzhyn, and several other localities.
The proposed flood protection structures are designed in accordance with standard cross-sections of earth embankment dams, equipped with a roadway along the crest and bank protection composed of reinforced concrete slabs.
In addition to material damage to residential buildings, industrial and municipal facilities, and transport infrastructure, floods cause substantial environmental damage to the avifauna and ichthyofauna of the Nura River floodplain. In particular, in the area of the headworks of the “Alva” liman system, backwater effects generate extensive inundation zones that stimulate spawning of many fish species in late April to early May (Botantayeva et al., 2025). However, subsequent sudden (pulse) water releases lead to mass mortality of eggs, larvae, and juveniles remaining on flooded meadows. Further downstream, May inundations trigger spawning of late-reproducing species (golden crucian carp, silver crucian carp, common carp). As water levels gradually decline (typically over the course of a month), adult fish and juveniles often become isolated in oxbow lakes and pools, many of which freeze through in winter, resulting in additional high mortality. Assessment of the damage inflicted on ichthyofauna by pulse floodwater releases from the Alva hydroscheme requires dedicated, specialized studies.
To estimate economic damage, the calculations incorporated individual residential buildings, the length of road segments of various categories (per 1 km), and unit cost indicators for water management facilities in accordance with the current construction standards of the Republic of Kazakhstan.
4 Discussion
International experience in flood risk management, particularly the practice of designing and operating flood protection structures in Austria, represents a representative example of an integrated approach to territorial flood protection (Rauter et al., 2020). Austria is among the countries with a high level of engineering and institutional preparedness for extreme hydrological events, where the flood protection system has been developed over several decades and is based on a combination of engineering, spatial planning, and environmental solutions (Thaler and Penning-Rowsell, 2023).
The use of the combined long-term hydrological record represents a methodological compromise between preserving record length for flood-frequency estimation and maintaining hydrological homogeneity. The commissioning of the Irtysh–Karaganda Canal in 1975 introduced an anthropogenic alteration to the flow regime, and climatic variability may have introduced additional temporal changes. Because formal change-point and stationarity tests were not performed, the combined series cannot be demonstrated to represent a single stationary statistical population. The derived design discharges and flood volumes should therefore be interpreted as conditional frequency estimates based on the integrated historical record rather than as definitive estimates for a strictly stationary regime. This limitation is particularly relevant when assigning return periods to rare events and should be considered when the results are used for engineering or planning purposes. Future work should apply formal change-point detection, stationarity testing, and, where supported by the data, non-stationary flood-frequency models to evaluate the robustness of the present estimates.
The probabilistic estimates obtained in this study are conditioned by the selected statistical model. Although the Kritsky–Menkel distribution is widely applied in engineering hydrology within Kazakhstan, other probability distributions such as Pearson type III and generalized extreme value distributions are frequently used in international practice. A comparative assessment of these approaches may improve uncertainty characterization and represents an important direction for future research.
An important source of uncertainty is associated with the assumption of stationarity adopted in the frequency analysis. Long-term hydrological records in the Nura River basin have been affected by both anthropogenic regulation and climate variability, which may lead to gradual changes in the mean values and variability of flood characteristics. Although the observational records were considered separately for the pre-regulation and post-regulation periods, possible time-varying parameters within each period were not explicitly modeled. Consequently, the estimated design floods should be regarded as representative of integrated present-day conditions rather than strictly stationary statistical populations. The use of non-stationary frequency analysis incorporating time-dependent parameters and climatic covariates may improve the characterization of flood risks and represents an important direction for future studies.
The spatial assessment performed in this study was intended to support basin-scale interpretation of flood propagation and identification of vulnerable reaches. The use of topographic maps at a scale of 1:1,000,000 provides adequate representation of regional geomorphological features but does not allow detailed delineation of inundation boundaries at the settlement level. Therefore, the proposed engineering recommendations should be regarded as conceptual and require further refinement using higher-resolution topographic data and hydraulic modeling.
A key feature of the Austrian approach is the transition from localized protective measures to basin-scale management of flood processes. Flood protection structures are regarded not as isolated facilities but as elements of an integrated runoff regulation system that includes reservoirs, embankments, managed floodplains, and specially designated temporary inundation areas. The strategic objective is not the complete confinement of floodwaters within the channel, but their controlled redistribution, considering channel conveyance capacity and acceptable risk levels for developed areas (Thaler and Penning-Rowsell, 2023; Reiter et al., 2022).
To reduce the conceptual nature of the comparison, a specific example from Austrian practice can be considered. According to Mayr et al. (2023), the Krems-Au flood retention basin represents a typical implementation of controlled flood retention within an integrated basin-scale flood management system. The retention basin is designed as a deliberately designated inundation area that is activated during high-flow events exceeding predefined discharge thresholds. Its primary function is not permanent water storage, but temporary retention of flood volumes in order to reduce downstream peak discharges and hydraulic loads on embankments and urban infrastructure.
In the Krems-Au case, the retention area operates in coordination with upstream and downstream hydraulic structures and is explicitly integrated into spatial planning instruments. Land use within the retention zone is restricted, and the territory is functionally reserved for controlled inundation during extreme floods. This approach allows flood volumes to be redistributed in a predictable and managed manner, thereby increasing system resilience without relying solely on embankment heightening or reservoir storage.
In contrast, the Nura–Ishim interfluve performs a similar hydrological function in terms of potential floodwater accumulation; however, it currently operates as an unmanaged retention area. Floodwater inflow into the interfluve occurs once channel conveyance capacity is exceeded, but the process is not regulated by predefined operational rules or spatial planning instruments. As a result, flood retention in the Nura–Ishim interfluve is uncontrolled, leading to increased transit flood risks for downstream territories, including the outskirts of Astana. This comparison highlights that the key difference between Austrian practice and the Nura River basin lies not in hydrological potential, but in the degree of institutionalization and operational control of retention functions.
From an engineering perspective, Austrian flood protection embankments are typically earth structures featuring well-developed filtration and drainage systems, extensive use of geosynthetic materials, and mandatory consideration of seepage and slope stability. The crest elevations of embankments are determined based on design floods with low exceedance probabilities (1% and less), with the inclusion of an additional freeboard. Spillway sections and overflow structures play a significant role, as they allow reduction of hydrostatic and hydrodynamic loads on the embankment body during extreme flood events (Thaler and Penning-Rowsell, 2023).
The results of the present study indicate that similar engineering solutions are also appropriate for the Nura River basin, where the calculated spring flood volumes substantially exceed the storage capacities of existing reservoirs. However, a fundamental difference lies in the degree of systemic implementation of protective measures. In Austria, engineering structures are mandatorily complemented by spatial planning and land-use management within potential flood zones (Johnston et al., 2021), whereas in the Nura River basin flood protection is currently oriented predominantly toward localized engineering solutions.
In Austrian practice, particular importance is attached to the use of regulated floodplains and retention areas—zones deliberately designated for temporary inundation during high water levels. This approach makes it possible to reduce peak discharges within the channel and to decrease loads on flood protection structures downstream (Löschner et al., 2019; Bezak et al., 2021). The estimates obtained in the present study for the storage capacity of the Nura–Ishim interfluve (approximately 400 million m3) indicate that this territory, in terms of its functional role, effectively corresponds to the concept of a retention zone widely applied in Austria. At the same time, under the conditions of Central Kazakhstan, this area is not integrated into a system of controlled flood regulation, resulting in uncontrolled overflow and an increase in transit flood risks (Table 13).
Table 13
| Criterion | Austria | Nura River basin |
|---|---|---|
| Scale of management | Basin-wide | Local, facility-based |
| Main principle | Controlled redistribution of runoff | Flood control using embankments and reservoirs |
| Type of embankments | Earth embankments with filtration, drainage, and geosynthetics | Earth embankments, predominantly without systemic integration |
| Use of overflows | Widely applied | Limited; proposed in this study |
| Retention areas | Regulated and managed | Naturally present but unmanaged |
| Role of spatial planning | Key | Limited |
| Ecological channel adaptation | Key | Fragmentary |
| Resilience to extreme floods | High | Limited |
| Land use regulation tools/zoning | Implemented (legally binding flood zoning and land-use restrictions) | Largely absent (flood-prone areas are not formally designated as controlled flood zones) |
| Controlled retention volumes/designation of territories | Yes (designated and managed retention areas activated during extreme floods) | Partially present (natural retention capacity exists but is unmanaged and not formally designated) |
Comparison of flood risk management approaches in Austria and the Nura River basin.
A comparison of the results of hydrological calculations for the Nura River basin with Austrian flood management practices reveals fundamental similarities in the selection of design scenarios for extreme floods and in the engineering logic of territorial protection (Table 8). At the same time, significant differences are evident in the institutional and spatial organization of flood mitigation measures. While in Austria flood protection is based on the integration of engineering structures, floodplain management, and strict spatial planning, in the conditions of Central Kazakhstan primary emphasis remains on the construction of embankments and reservoirs without full utilization of natural retention mechanisms.
The results of the present study confirm that the effectiveness of the proposed flood mitigation measures in the Nura River basin can be significantly enhanced through adaptation of selected elements of the Austrian model. This applies to the use of interfluve depressions as managed temporary inundation zones, the incorporation of overflow structures into embankment systems, and the strengthening of spatial planning as a key instrument for reducing flood hazard.
Although climate change is widely recognized as a factor influencing flood regimes, the present study does not explicitly quantify its effects. The design characteristics were derived from long-term observational records under the assumption of quasi-stationary conditions. Therefore, the results should be interpreted as representative of current hydrological conditions rather than future climate scenarios. Incorporation of non-stationary frequency analysis and climate projections constitutes a promising direction for further investigations.
In the context of the comparison with Austrian flood risk management practice, it appears appropriate to develop an adapted set of engineering measures for the Nura River basin that accounts for both the hydrological characteristics of the region and the existing constraints of the water management system.
Based on the calculations performed and the analysis of observed flood events, the implementation of a set of complementary engineering solutions is proposed. As a fundamental element of territorial protection, the construction and reconstruction of earth embankments designed to safely convey extreme floods with low exceedance probabilities (1% and less) are considered. At the same time, the structural design of the embankments should include overflow sections that ensure controlled release of a portion of flood runoff and reduction of peak hydrostatic and hydrodynamic loads acting on the embankment body (Figure 5).
Figure 5
An additional element of the protection system is the reinforcement of riverbank slopes at the most vulnerable channel sections using riprap. This measure is aimed at reducing erosional processes, stabilizing the channel, and preventing bank failure under high flow velocities and wave action during the flood period.
As an operational response measure during rapid rises in water levels, the use of mobile water-filled barriers is considered advisable. These structures make it possible to rapidly create temporary protective barriers in areas of localized inundation and to provide additional protection for settlements and infrastructure facilities under extreme flood conditions.
The proposed set of engineering measures is consistent with the principles of integrated flood risk management applied in Austrian practice and is adapted to the conditions of the Nura River basin. Its implementation will enhance the effectiveness of territorial protection, reduce the likelihood of uncontrolled floodwater overflows, and mitigate potential damage from extreme hydrological events.
5 Conclusion
The conducted study made it possible to perform a comprehensive hydrological and engineering assessment of spring floods and flood risks in the Nura River basin, taking into account the characteristics of snow-fed runoff, long-term runoff variability, and the presence of the Nura–Ishim bifurcation. Based on the analysis of long-term hydrological observation series, design characteristics of maximum discharges and spring flood volumes for different exceedance probabilities were obtained, confirming the high intensity and short duration of flood processes under the sharply continental climatic conditions of Central Kazakhstan.
It was established that during rare and extreme floods (p = 1–0.1%), the volumes of spring runoff substantially exceed the storage capacities of the existing reservoirs within the basin. Even the combined useful capacity of the largest regulating structures (the Sherubaynura, Samarkand, and Intumak reservoirs) does not ensure effective retention of floodwaters, resulting in the transit of excess runoff along the river channel and its overflow onto the floodplain. This creates conditions for large-scale inundation of settlements, transport infrastructure, and agricultural lands.
Special attention in this study was given to the Nura–Ishim bifurcation zone, which under current hydrological conditions begins to function already during floods with an exceedance probability of approximately 10%. It is shown that during extreme spring floods, the inflow of floodwaters into the interfluve can far exceed the conveyance capacity of the Ishim River channel downstream of the city of Astana, thereby generating a high risk of transit flooding in the southwestern and western districts of the capital. The estimated storage capacity of the interfluve (about 400 million m3) confirms its key role in redistributing flood runoff and underscores the necessity of incorporating this territory into a system of controlled spring flood regulation.
Cartographic analysis and comparison of calculated water levels with floodplain margin elevations made it possible to identify the most vulnerable channel reaches and adjacent areas where the probability of overbank flow is highest. Observed flood events in 2001, 2002, 2015, and 2024 confirm the reliability of the performed calculations and demonstrate the recurrence of extreme inundation scenarios.
The study provides a basin-scale hydrological and engineering assessment of spring flood hazards in the Nura River basin, accounting for the snowmelt-dominated runoff regime, long-term hydrological variability, and the Nura–Ishim bifurcation. Frequency analysis of the available long-term observations yielded estimates of maximum discharges and spring flood volumes for selected exceedance probabilities. Because the analyzed record spans both pre-regulation and post-regulation flow conditions and formal change-point and stationarity tests were not performed, these values should be regarded as conditional long-term frequency estimates rather than as parameters of a demonstrably stationary hydrological regime. Within this limitation, the calculations characterize the magnitude of potentially severe spring floods and provide a basis for basin-scale comparison with reservoir storage and channel conveyance capacity.
Comparison of the obtained results with international experience in flood risk management, particularly Austrian practice, demonstrates the advisability of shifting from predominantly localized engineering solutions to an integrated basin-scale approach. For the Nura River basin, this implies not only the construction of protective structures but also the use of interfluve depressions as managed retention zones, the strengthening of spatial planning, and the consideration of ecological aspects of runoff regulation.
Overall, the results of the study provide a scientifically grounded basis for engineering and management decision-making aimed at reducing flood hazard in the Nura River basin. The obtained findings can be used in the development of flood protection programs, the adjustment of spatial planning schemes, and the enhancement of regional infrastructure resilience under conditions of increasing climate variability.
The obtained results provide a scientific basis for basin-scale flood risk assessment and support strategic water management and territorial planning. However, detailed design of local flood protection structures and delineation of inundation zones for individual settlements require high-resolution topographic surveys and dedicated hydraulic modeling.
Statements
Data availability statement
The original contributions presented in the study are included in the article/supplementary material, further inquiries can be directed to the corresponding author/s.
Author contributions
BB: Conceptualization, Validation, Writing – original draft, Writing – review & editing. AV: Conceptualization, Writing – original draft, Writing – review & editing. KK: Methodology, Project administration, Writing – original draft, Writing – review & editing. YM: Validation, Writing – original draft, Writing – review & editing. IK: Formal analysis, Writing – original draft, Writing – review & editing. TB: Investigation, Writing – original draft, Writing – review & editing. DY: Funding acquisition, Visualization, Writing – original draft, Writing – review & editing. GB: Resources, Writing – original draft, Writing – review & editing. NS: Writing – original draft, Writing – review & editing.
Funding
The author(s) declared that financial support was not received for this work and/or its publication.
Conflict of interest
The author(s) declared that this work was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.
Generative AI statement
The author(s) declared that Generative AI was not used in the creation of this manuscript.
Any alternative text (alt text) provided alongside figures in this article has been generated by Frontiers with the support of artificial intelligence and reasonable efforts have been made to ensure accuracy, including review by the authors wherever possible. If you identify any issues, please contact us.
Publisher’s note
All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article, or claim that may be made by its manufacturer, is not guaranteed or endorsed by the publisher.
References
1
AdekeD.MugumeS. (2025). A methodology for development of flood-depth-velocity damage functions for improved estimation of pluvial flood risk in cities. J. Hydrol.653. doi: 10.1016/j.jhydrol.2025.132736
2
Akimat of Karaganda Region (2025). Flood-prone Settlements in Karaganda Region Inspected by Zhenis Kassymbek. Karaganda, Kazakhstan: Government of the Republic of Kazakhstan.
3
AlagudzhaevaM.SadvakassovaS.YelbasievaB.AimbetovA. (2023). Conditions for the formation of floods in the territory of Central Kazakhstan. Hydrometeorol. Ecol.111, 61–73. doi: 10.54668/2789-6323-2023-111-4-61-73
4
AlimkulovS.MyrzakhmetovA. (2024). Passport of the rivers of Kazakhstan. Hydrometeorol. Ecol.112, 161–168. doi: 10.54668/2789-6323-2024-112-1-161-168
5
AschanovaР. (2023). Determination of the norm and variability of the rivers of the Nura River basin. Hydrometeorol. Ecol.2, 79–89. Retrieved from https://journal.kazhydromet.kz/kazgidro/article/view/1084
6
BezakN.KovačevićM.JohnenG.LebarK.ZupancV.VidmarA.et al. (2021). Exploring options for flood risk management with special focus on retention reservoirs. Sustainability13:10099. doi: 10.3390/su131810099
7
BolgovM.SarmanovI. (2020). Two-dimensional distribution law of random variables having S. N. Kritskii and M. F. Menkel three-parameter gamma distributions: a symmetrical case. Water Resour.47, 517–520. doi: 10.1134/S009780782004003X
8
BotantayevaB. S.VagapovaA. R.KaliyevaK. E. (2025). Assessment and improvement of flood protection of territories in the Nura River basin. Geogr. Water Resour.4, 3–15. doi: 10.55764/2957-9856/2025-4-3-15.42
9
BubeckP.KreibichH.Penning-RowsellE.BotzenW.MoelH.KlijnF. (2017). Explaining differences in flood management approaches in Europe and in the USA—a comparative analysis. J. Flood Risk Manag.10, 436–445. doi: 10.1111/jfr3.12151
10
ChanF. K. S.ChuahC. J.ZieglerA. D.DąbrowskiM.VarisO. (2018). Towards resilient flood risk management for Asian coastal cities: lessons learned from Hong Kong and Singapore. J. Clean. Prod., 576–589. doi: 10.1016/j.jclepro.2018.03.217
11
ChanF.YangL.MitchellG.WrightN.GuanM.LuX.et al. (2022). Comparison of sustainable flood risk management by four countries—the United Kingdom, the Netherlands, the United States, and Japan—and the implications for Asian coastal megacities. Nat. Hazards Earth Syst. Sci.22, 2567–2588. doi: 10.5194/nhess-22-2567-2022
12
FangG.LiZ.YangJ.ChenY.DuanW.AmoryC.et al. (2022). Changes in flooding in the alpine catchments of the Tarim River basin, Central Asia. J. Flood Risk Manag.16:e12869. doi: 10.1111/jfr3.12869
13
FrancoÁ.García-AyllónS. (2025). The paradigm shift in scientific interest on flood risk: from hydraulic analysis to integrated land use planning approaches. Water17:2276. doi: 10.3390/w17152276
14
GlasR.HechtJ.SimonsonA.GazoorianC.SchubertC. (2023). Adjusting design floods for urbanization across groundwater-dominated watersheds of Long Island, NY. J. Hydrol.618. doi: 10.1016/j.jhydrol.2023.129194
15
JohnstonI.MurphyW.HoldenJ. (2021). A review of floodwater impacts on the stability of transportation embankments. Earth Sci. Rev.215:103553. doi: 10.1016/j.earscirev.2021.103553
16
KazGIPROVodKhoz. (2025). Website of KazGIPROVodKhoz. Available online at: https://www.kazgiprovodkhoz.kz/
17
KazHydromet. (2025). Kazhydromet—Kazakhstan Hydrometeorological service. Available online at: https://www.kazhydromet.kz/en/ (Accessed March 25, 2025).
18
Kazhydromet/EcoData. (n.d). Interactive hydrological data application. Available online at: http://ecodata.kz:3838/app_hydro/ (Accessed March 25, 2025).
19
LakoA.KerpaciA. (2024). Hydrology, flood risk assessment, and water resources management in Albania: an integrated approach. Grassroots J. Nat. Resour.7, 1–21. doi: 10.33002/nr2581.6853.070301
20
LöschnerL.SeherW.NordbeckR.KopfM. (2019). Blauzone Rheintal: A regional planning instrument for future-oriented flood management in a dynamic risk environment. In T. Hartmann, L. Slavíková, & S. McCarthy (Eds.), Nature-based flood risk management on private land: Disciplinary perspectives on a multidisciplinary challenge (pp. 141–154). Springer. doi: 10.1007/978-3-030-23842-1_15
21
MakkiS.MaaloufE.YehyaA. (2024). Review of the environmental and health risks of hydraulic fracturing fluids. Heliyon11:e40883. doi: 10.1016/j.heliyon.2024.e40883,
22
MayrN.HoferM.SomogyiW.SchellenhuberK.HueberD. (2023). Hochwasserrückhaltebecken Krems-Au: Konzeption – Planung – Bauausführung. Oesterr. Wasser Abfallwirtsch.75, 243–250. doi: 10.1007/s00506-023-00936-2
23
MustafayevZ.KozykeyevaA.ShugayypU.AbdeshevK.TursynbaevN. (2025). Analysis and assessment of the trend of changes in the hydrological regime of rivers in the water catchment of the Nura River basin. Hydrometeorol. Ecol.116, 8–23. doi: 10.54668/2789-6323-2025-116-1-8-23
24
NurbatsinaA.SalavatovaZ.TursunovaA.DidovetsI.HuthoffF.Rodrigo-ClaveroM.et al. (2025). Flood modelling of the Zhabay river basin under climate change conditions. Hydrology12:35. doi: 10.3390/hydrology12020035
25
RamazanovaN.ToksanbaevaS.BerdenovZ.OzgeldinovaZ.TursynovaT.ZhakupovA. (2020). Analysis of the current state of recreational resources of the Nura River basin, the Republic of Kazakhstan. GeoJournal Tour. Geosites31, 1043–1048. doi: 10.30892/gtg.31316-539
26
RauterM.KaufmannM.ThalerT.FuchsS. (2020). Flood risk management in Austria: analysing the shift in responsibility-sharing between public and private actors from a public stakeholder's perspective. Land Use Policy99:105017. doi: 10.1016/j.landusepol.2020.105017
27
ReiterK.KnittelN.BachnerG.Hochrainer-StiglerS. (2022). Barriers and ways forward to climate risk management against indirect effects of natural disasters: a case study on flood risk in Austria. Clim. Risk Manag.36:100431. doi: 10.1016/j.crm.2022.100431
28
Republic of Kazakhstan (2023). SN RK 3.04-01-2023 hydraulic engineering works. Available online at: https://online.zakon.kz/Document/?doc_id=36985597 (Accessed July 10, 2025).
29
RusHydro. (2025). LHP (a branch or section of RusHydro). Available online at: https://lhp.rushydro.ru/
30
ShogelovaN.SartinS. (2022). “Building a model of the spring flood on the Ishim River using an unmanned aerial vehicle,” 2022 International Conference on Smart Information Systems and Technologies (SIST), Nur-Sultan, Kazakhstan, IEEE. pp. 1–6. doi: 10.1109/SIST54437.2022.9945791
31
SuwannachaiL.PhumiphanA.KuntiyawichaiK.SupakosolJ.SriworamasK.SivanphengO.et al. (2025). Integrating hydrological models for improved flash flood risk assessment and mitigation strategies in northeastern Thailand. Water17:345. doi: 10.3390/w17030345
32
TabariH. (2020). Climate change impact on flood and extreme precipitation increases with water availability. Sci. Rep.10:13768. doi: 10.1038/s41598-020-70816-2,
33
TasmagambetovaG. (2025). Nearly 70 hydraulic structures are being repaired in Kazakhstan ahead of floods. Inform.kz. Available online at: https://www.inform.kz/ru/pochti-70-gidrosooruzheniy-remontiruyut-v-kazahstane-pered-pavodkami-f8f48d
34
ThalerT.Penning-RowsellE. (2023). Policy experimentation within flood risk management: transition pathways in Austria. Geogr. J.189, 701–714. doi: 10.1111/geoj.12528
35
ToleubekovaZ. Z.ShogelovaN. T.ShultsR. V.TatarintsevL. M. (2025). Organization of forest fund use: from monitoring to sustainable forest model use. Sustain. Dev. Mt. Territ.17, 266–281. doi: 10.21177/1998-4502-2025-17-1-266-281
36
ToxanbayevaS.AlagudzhaevaM.RamazanovaN.TusupbekovZ. (2021). Modeling of meltwater runoff on the example of the Nura river section from Samarkand to Intumak reservoirs. J. Geogr. Environ. Manage.62, 44–54. doi: 10.26577/jgem.2021.v62.i3.04
37
WangN.SunF.WangH.LiuW. (2022). Effects of cryospheric hydrological processes on future flood inundation and the subsequent socioeconomic exposures in Central Asia. Environ. Res. Lett.17:124020. doi: 10.1088/1748-9326/aca491
38
WangH.ZhouJ.TangY.LiuZ.KangA.ChenB. (2020). Flood economic assessment of structural measure based on integrated flood risk management: a case study in Beijing. J. Environ. Manag.280:111701. doi: 10.1016/j.jenvman.2020.111701
39
WaskoC.NathanR.SteinL.O’SheaD. (2021). Evidence of shorter more extreme rainfalls and increased flood variability under climate change. J. Hydrol.603:126994. doi: 10.1016/j.jhydrol.2021.126994
40
ZhangK.ShalehyM. H.EzazG. T.ChakrabortyA.MohibK. M.LiuL. (2022). An integrated flood risk assessment approach based on coupled hydrological-hydraulic modeling and bottom-up hazard vulnerability analysis. Environ. Model. Softw.148:105279. doi: 10.1016/j.envsoft.2021.105279
Summary
Keywords
climate change, dams, flood protection, flood risk, hydrological analysis, Nura River basin, water management
Citation
Botantayeva B, Vagapova A, Kaliyeva K, Mukhanov Y, Kossenko I, Baratova T, Yelemes D, Bektursunova G and Shogelova N (2026) Flood risk assessment and protection measures in the Nura River basin, Kazakhstan. Front. Water 8:1816895. doi: 10.3389/frwa.2026.1816895
Received
25 February 2026
Revised
14 September 2026
Accepted
28 September 2026
Published
14 October 2026
Volume
8 - 2026
Edited by
Guoqing Wang, Nanjing Hydraulic Research Institute, China
Reviewed by
Svitlana Delehan, Uzhhorod National University, Ukraine
Mingming Song, Zhejiang Water Conservancy and Hydropower College, China
Updates
Copyright
© 2026 Botantayeva, Vagapova, Kaliyeva, Mukhanov, Kossenko, Baratova, Yelemes, Bektursunova and Shogelova.
This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.
*Correspondence: Darkhan Yelemes, workw7833@gmail.com; Alina Vagapova, vagapova-alina@rambler.ru; Gulnar Bektursunova, kamila_19jule@mail.ru; Nazym Shogelova, nazymshogelova@gmail.com
ORCID: Yeldos Mukhanov, orcid.org/0009-0009-4099-4904
Disclaimer
All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.