OPINION article

Front. Energy Res., 17 January 2023

Sec. Advanced Clean Fuel Technologies

Volume 10 - 2022 | https://doi.org/10.3389/fenrg.2022.1071320

Research advance of numerical simulation methods for sand production prediction of unconsolidated sandstone

  • 1. Cooperative Innovation Center of Unconventional Oil and Gas (Ministry of Education and Hubei Province), Yangtze University, Wuhan, China

  • 2. Key Laboratory of Drilling and Production Engineering for Oil and Gas, Wuhan, Hubei, China

  • 3. School of Urban Construction, Yangtze University, Jingzhou, China

  • 4. College of Civil and Transportation Engineering, Hohai University, Nanjing, China

1 Introduction

With the rapid development of global economy, the demand for oil and gas resources keeps rising, unconsolidated sandstone reservoirs occupy a very important position in China’s oil and gas resources () (Zhang, 2021) (Yan et al., 2021). In the process of drilling and producing oil in unconsolidated sandstone reservoir, the stress and pore pressure around the oil production cavity will be redistributed, which will cause serious problems such as sand production in the production stage (). Sand production not only damages borehole integrity, but also leads to reduced oil and gas production, equipment corrosion and impact on production safety during production () (). Due to the existence of the above negative effects, the exploitation cost of unconsolidated sandstone reservoir is further improved, so it is particularly important to conduct reliable sand production prediction research () (Zivar et al., 2019).

At present, the research on sand production prediction of unconsolidated sandstone mainly focuses on two aspects, namely laboratory experimental research and numerical simulation research. Laboratory experimental studies mostly use a single large cylindrical artificial sandstone specimen for diagenesis and combine electrorheological probes (ER Probes) or high-pressure consolidation system (HPCS) to simulate the sand behavior, from the overall or macro perspective to simulate the sand law, but it is difficult to reveal the microscopic nature and mechanism of particle migration and sand production process (Zhang et al., 2015; ; ). Meanwhile, sand production in oil wells is closely related to mechanical behavior and rock properties of sandstone reservoir (). Because of the complex mineral composition and low cementation strength of unconsolidated sandstone reservoir, it is more difficult to predict sand production by laboratory experiments.

To better simulate and predict sand production, many scholars have shifted their research focus to numerical simulation methods (; ). Therefore, this article discussed the current research status of numerical simulation methods for prediction of sand production in unconsolidated sandstone, analyzes the shortcomings of various methods, and puts forward suggestions for further research, so as to provide reference and theoretical support for sand production prediction and sand control design in the development of unconsolidated sandstone reservoirs.

2 Numerical simulation methods for sand production prediction

The accurate prediction of unconsolidated sandstone sand production in the production process plays a significant role in the level of oil and gas production. There are four kinds of numerical simulation methods, namely finite element method, finite difference method, discrete element method and discrete element-finite element hybrid method.

2.1 Finite element method

The finite element method mainly includes critical drawdown pressure difference evaluation, equivalent plastic strain analysis, thick wall cylinder calculation and prediction of sand production (; ) (; ).

2.1.1 Critical drawdown pressure difference evaluation

This method uses the true triaxial stress chamber (TTSC) to simulate the single-hole sanding behavior under true triaxial stress and fluid flow conditions and is verified by the finite element software ABAQUS (Younessi et al., 2013). Studies suggest that there is a critical drawdown pressure difference to induce sand production in the sand producing area around the borehole (). The failure prediction under true triaxial stress state is more accurate than Drucker-Prager (; ) and has a stronger correlation with the experimental results. However, the numerical model does not consider the plastic strain law, and the sample is in an ideal state after yielding, which deviates from the actual value.

2.1.2 Equivalent plastic strain analysis

Since the 1990s, some scholars have introduced the equivalent plastic strain to analyze the sand production conditions and sand production, thereby improving the accuracy of sand production prediction, Figure 1B. (; ). Volonte et al. established a reliable workflow through finite element modeling to estimate the actual sanding conditions (). As shown in Figure 1A, the rock failure around the perforation is evaluated by analyzing the distribution of equivalent plastic strain, and the Cosserat continua is introduced to simulate the slit type of failure around the borehole, so as to achieve the purpose of sand production prediction (; ). further improved the accuracy of this method by combining core experiment and field experiment.

FIGURE 1

2.1.3 Thick wall cylinder calculation

Santana and Likrama proposed a workflow for optimal matching between laboratory tests and finite element model simulation results (). In this method, the finite element model under the same test is developed by testing the experimental curve of thick-walled cylinder (TWC) to calibrate the strength and plasticity of the material. When the numerical test values match the experimental results, the failure threshold is determined according to the critical equivalent plastic strain to simulate the failure near the wellbore during production ().

2.1.4 Prediction of sand production

Prediction of sand production is by considering the erosion process of coupling finite element method, by simulating the fluid flow phenomenon, to observe the sand erosion process, and then to predict the amount of sand in the wellbore (). This method can reproduce the process of an erosion front, and the proposed finite element numerical model does not depend on specific erosion pattern, which is reproducible. The amount of sand is mainly affected by the degree of erosion and finite element time step and mesh refinement (; ).

2.2 Finite difference method

Based on erosion criterion () (), proposed a sand production prediction to study the onset and rate of sand production by using the finite difference model. extended Detournay’s mechanical-erosion model with strain hardening/softening Mohr-Coulomb yield surface and fracture energy regularization technique (), which reduced the mesh dependence of strain results to a certain extent, and introduced erosion coefficient K to improve the accuracy of sand production prediction, as shown in Figure 1B. further reduced the negative impact of mesh size on sand production prediction by combining hollow cylinder sand production experiment and finite difference program on the basis of predecessors.

2.3 Discrete element method

The discrete element method includes three aspects: Coupled Lattice-Boltzmann and Method Discrete Element Method (LBM-DEM), Coupled Computational Fluid Dynamic and Discrete Element Method (CFD-DEM), Coupled Discrete Element Method and Fluid Flow Model (DEM-FFM) (; ; Zhang et al., 2022).

2.3.1 Coupled Lattice-Boltzmann and method-discrete element method

LBM code in LBM-DEM coupling method simulates fluid flow in each time step, and DEM is used to determine the particle position. Through the two-dimensional numerical simulation of fluid flow in deformable particulate media comprising of movable circular particles, the sand production phenomenon in weakly cemented sandstone reservoirs can be simulated. Also, can be used to study the basic mechanism of sand production on an experimental scale (; ) and analyze the permeability before and after sand production and the evolution process of the complex force chain network inside the model (Xia et al., 2022). On the basis of predecessors, Honari et al. simulated different stages of sand production by integrating Immersion Moving Boundary (IMB) method, including scale effect, extension of failure zone under incremental stress, and stress change during particle erosion (). The study believed that the smaller the pore diameter and the greater the stress value, the easier the sand production.

2.3.2 Coupled computational fluid dynamic and discrete element method

The coupling CFD-DEM model is used to study the sand production time, sand production amount and particle migration in the perforation damage zone of weakly cemented sand body under different fluid flow condition (; ). Then, the sand production of different fluid types is coupled (). It is found that the stripped sand particles are mostly clustered or blocky, and the strength of sand body and fluid velocity are the key factors to determine whether to produce sand. Under the influence of fluid flow, the compacted core will release particles to the perforation location, and then produce transient sand retention. Ismail et al. extended the CFD-DEM coupling model to the study of screen sand consolidation and analyzed the influence of key parameters such as fluid velocity and particle size ratio on sand retention effect. The research results show that the method can better predict the sand production observed in the experiment (; ).

2.3.3 Coupled discrete element method and fluid flow model

The DEM-FFM coupling model uses the particle flow code (PFC) developed by ITACSA to calculate by the discrete element method. The particles in the software are rigid and can overlap. The time steps calculated by the discrete element method correspond to the boundary conditions in PFC3D. The influence of boundary stress and fluid pressure on the spalling and sand production of sandstone particles is simulated by updating the variations of permeability and porosity change (), as shown in Figure 1C. The research shows that the high boundary stress and seepage force plays a major role in the sand production process, and lead to the redistribution of stress, which makes the plastic area near the wellbore asymmetrically distributed and aggravates the sand production behavior. After that, Zhao et al. (2020) built a discrete element model based on the PFC3D platform and made a quantitative analysis of sand production.

2.4 Discrete element-finite element hybrid method

Wu and Choi based on the hybrid discrete element-finite model (DE-FE), use the strength of cementing materials, the degree of cementation between particles, and the property of pore fluid to evaluate the formation of pore types, the evolution of sand production volume and sand production rate, and whether the sand production is continuous (). When the cementation between particles is destroyed, particles will separate from sandstone and flow out from the tip of the cavity through the fluid, as shown in Figure 1D. If the degree of cementation is poor, the toughness and permeability are high enough, the drag force of pore fluid is enough to cause bond failure, and the detached sandstone particles gather toward the borehole center, resulting in continuous sanding (Zhou et al., 2011).

3 Analysis and discussion

  • 1) Finite element method and finite difference method are based on continuum mechanics. The strength and elastic properties of the numerical model can be obtained by laboratory tests, which is suitable for large-scale sand production prediction, but cannot capture local sand production phenomena.

  • 2) The discrete element method can capture the motion, interaction and micro-failure mechanism of a single sand particle in the dynamic process, but it cannot be used for large-scale calculation and the calibration of model parameters is difficult. The calibration of parameters is not unique, and the micro properties cannot be determined by laboratory specimens.

  • 3) The discrete element-finite element hybrid method can use the continuum theory to simulate the small deformation away from the wellbore, and the sand production behavior near the wellbore can be analyzed by using the discontinuous characteristics of discrete element. This method increases the accuracy of sand production prediction, but there are few related studies, most of which are still based on finite element method or discrete element method.

  • 4) Discrete software PFC can simulate the discontinuous characteristics of rock and reproduce the separation phenomenon of single sand particle from rock matrix. The establishment of numerical model and parameter calibration are relatively simple, and the calculation amount is small, which has high sand production prediction accuracy (; Zhao et al., 2020) () ().

4 Conclusion

  • 1) Accurate prediction of loose sandstone sand production has always been the focus of domestic and foreign scholars. From the perspective of numerical simulation, this paper summarizes the current research progress of numerical simulation methods, and analyzes the advantages and disadvantages of various methods, in order to provide research direction for future sand production prediction.

  • 2) The finite element method may consider developing special numerical elements to characterize the effect of perforation geometry on sand production during perforation. The finite difference method uses the fracture energy regularization technique to extend the mechanical-erosion criterion and reduce the dependence of the fluid on the grid. In the future, the sand deposition after compression can be considered to further improve the prediction accuracy of sand production. The discrete element method can correlate the microscopic parameters of rock with macroscopic properties and realize the calibration of microscopic parameters of 3D DEM models. Due to the poor applicability of fluid flow at the perforation tip in the current 3D discrete element perforation test simulation, the reliability of the fluid simulation results at the perforation tip can be improved by introducing the discrete element-finite element hybrid method, considering the cementation state between particles, and providing reference for sand production prediction.

  • 3) Although the discrete software PFC has high precision in sand prediction, there are still some calculation errors. In the future, based on the interface provided by the discrete software PFC, combined with the C++ language, a discrete contact model suitable for unconsolidated sandstone is established to further improve the accuracy of sand production prediction.

Statements

Author contributions

HS: mainly responsible for research literature and writing manuscript. GJ: mainly responsible for framework adjustment and thesis guidance. ZL and DH: mainly responsible for literature research.

Funding

This work was supported by the National Natural Science Foundation of China (No. 51804042), Open Fund of Key Laboratory of Exploration Technologies for Oil and Gas Resources (Yangtze University), and Ministry of Education (No. PI2021-04), and Open Fund of Cooperative Innovation Center of Unconventional Oil and Gas (Yangtze University), and Ministry of Education and Hubei Province (No. UOG2022-38).

Conflict of interest

The authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

Publisher’s note

All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article, or claim that may be made by its manufacturer, is not guaranteed or endorsed by the publisher.

References

  • 1

    AhadN. A.JamiM.TysonS. (2020). A review of experimental studies on sand screen selection for unconsolidated sandstone reservoirs. J. Pet. Explor. Prod. Technol.10 (4), 16751688. 10.1007/s13202-019-00826-y

  • 2

    Al-AjmiA. M.ZimmermanR. W. (2005). Relation between the mogi and the coulomb failure criteria. Int. J. Rock Mech. Min. Sci.42 (3), 431439. 10.1016/j.ijrmms.2004.11.004

  • 3

    Al-AjmiA. M.ZimmermanR. W. (2006). Stability analysis of vertical boreholes using the mogi–coulomb failure criterion. Int. J. Rock Mech. Min. Sci.43 (8), 12001211. 10.1016/j.ijrmms.2006.04.001

  • 4

    BaiM.SantanaC.ShenX. (2012). “A comprehensive approach in predicting excessive sand production,” in 2012 harmonising rock engineering and the environment–qian & zhou (London: Taylor & Francis Group) (978-0-415-80444-8.

  • 5

    CaoC.ChengL. S.ZhangX. Y.ShiJ. J. (2021). Numerical simulation investigation on well performance integrated stress sensitivity and sand production. Geofluids2021, 111. 10.1155/2021/9925866

  • 6

    CuiY. F.NouriA.ChanD.RahmatiE. (2016). A new approach to DEM simulation of sand production. J. Petroleum Sci. Eng.147, 5667. 10.1016/j.petrol.2016.05.007

  • 7

    DengF. C.YanC. L.JiaS. P.ChenS. H.WangL. H.HeL. (2019). Influence of sand production in an unconsolidated sandstone reservoir in a deepwater gas field. J. Energy Resour. Technol.141 (9), 092904. 10.1115/1.4043132

  • 8

    DetournayC.TanC.WuB. (2006). “Modeling the mechanism and rate of sand production using FLAC,” in Numerical modeling in geo-mechanics-2006. Paper No. 08-10. Minne-Apolis. Editors HartR.VaronaP. (Minnesota: Itasca Consulting Group).

  • 9

    FattahpourV.MoosaviM.MehranpourM. (2012). An experimental investigation on the effect of grain size on oil-well sand production. Pet. Sci.9 (3), 343353. 10.1007/s12182-012-0218-5

  • 10

    GaroleraD.CarolI.PapanastasiouP. (2020). Application of zero-thickness interface elements to sanding prediction analysis. J. Petroleum Sci. Eng.190, 107052. 10.1016/j.petrol.2020.107052

  • 11

    GhassemiA.PakA. (2015). Numerical simulation of sand production experiment using a coupled Lattice Boltzmann–Discrete Element Method. J. Petroleum Sci. Eng.135, 218231. 10.1016/j.petrol.2015.09.019

  • 12

    GuiF.KhaksarA.ZeeW. V. D.HughesB.CadoganP. (2016). “Improving the sanding evaluation accuracy by integrating core tests, field observations and numerical simulation,” in Proceedings of the SPE asia pacific oil & gas conference and exhibition (Perth, Australia. 10.2118/182499-MS

  • 13

    HanY. H.CundallP. (2017). Verification of two-dimensional LBM-DEM coupling approach and its application in modeling episodic sand production in borehole. Petroleum3 (2), 179189. 10.1016/j.petlm.2016.07.001

  • 14

    HonariS.HosseininiaE. S. (2021). Particulate modeling of sand production using coupled DEM-LBM. Energies14 (4), 906. 10.3390/en14040906

  • 15

    IsmailN. I.KuangS. B.TangY. C.YuA. B. (2022). CFD-DEM evaluation of screen types for sand control applications. Powder Technol.404, 117496. 10.1016/j.powtec.2022.117496

  • 16

    IsmailN. I.KuangS. B.YuA. B. (2021). CFD-DEM study of particle-fluid flow and retention performance of sand screen. Powder Technol.378, 410420. 10.1016/j.powtec.2020.10.012

  • 17

    KhamitovF.MinhN. H.ZhaoY. (2021). Coupled CFD-DEM numerical modelling of perforation damage and sand production in weak sandstone formation. Geomechanics Energy Environ.28, 100255. 10.1016/j.gete.2021.100255

  • 18

    KhamitovF.MinhN. H.ZhaoY. (2022). Numerical investigation of sand production mechanisms in weak sandstone formations with various reservoir fluids. Int. J. Rock Mech. Min. Sci.154, 105096. 10.1016/j.ijrmms.2022.105096

  • 19

    KozhagulovaA.MinhN. H.ZhaoY.FokS. C. (2020). Experimental and analytical investigation of sand production in weak formations for multiple well shut-ins. J. Petroleum Sci. Eng.195, 107628. 10.1016/j.petrol.2020.107628

  • 20

    KozhagulovaA.ShabdirovaA.MinhN. H.ZhaoY. (2020). An integrated laboratory experiment of realistic diagenesis, perforation and sand production using a large artificial sandstone specimen. J. Rock Mech. Geotechnical Eng.13 (1), 154166. 10.1016/j.jrmge.2020.09.004

  • 21

    LiX. R.FengY. C.GrayK. E. (2018). A hydro-mechanical sand erosion model for sand production simulation. J. Petroleum Sci. Eng.166, 208224. 10.1016/j.petrol.2018.03.042

  • 22

    LiuC.ZhouW. S.JiangJ. Z.ShangF. J.HeH.WangS. (2022). Remaining oil distribution and development strategy for offshore unconsolidated sandstone reservoir at ultrahigh water-cut stage. Geofluids2022, 111. 10.1155/2022/6856298

  • 23

    LiuZ. J.LiuR. J. (2018). Depletion-induced extreme plasticity across multiple horizontal wellbores in reservoirs with soft formations. Extreme Mech. Lett.18, 7078. 10.1016/j.eml.2017.11.004

  • 24

    LiuZ. W. (2012). Sand prediction model and its application in offshore unconsolidated sandstone reservoirs. Special Oil Gas Reservoirs19 (3), 136139+158. 10.3969/j.issn.1006-6535.2012.03.036

  • 25

    MoritaN.WhitfillD. L.MassleI.KundsenT. W. K. (1989). Realistic sand-production prediction: Numerical approach. SPE Prod. Eng.4 (1), 1524. 10.2118/16989-PA

  • 26

    MullerA. L.JrE. D. A. V.VazL. E.FigueiredoR. P.GoncalvesC. J. (2011). Numerical analysis of sand/solids production in boreholes considering fluid-mechanical coupling in a Cosserat continuum. Int. J. Rock Mech. Min. Sci.48, 13031312. 10.1016/j.ijrmms.2011.09.012

  • 27

    NouriA.KuruE.VaziriH. (2009). Elastoplastic modelling of sand production using fracture energy regularization method. J. Can. Petroleum Technol.48 (4), 6471. 10.2118/09-04-64

  • 28

    PakM. F. A.PakA. (2020). Numerical simulation of sanding using a coupled hydro-mechanical sand erosion model. J. Rock Mech. Geotechnical Eng.12 (4), 811820. 10.1016/j.jrmge.2019.12.017

  • 29

    PapamichosE.TronvollJ.SkjærsteinA.UnanderT. E. (2010). Hole stability of red wildmoor sandstone under anisotropic stresses and sand production criterion. J. Petroleum Sci. Eng.72, 7892. 10.1016/j.petrol.2010.03.006

  • 30

    PapamichosE.VardoulakisI.TronvollJ.SkjærsteinA. (2001). Volumetric sand production model and experiment. Int. J. Numer. Anal. Methods Geomech.25 (8), 789808. 10.1002/nag.154

  • 31

    RahmatiH.JafarpourM.AzadbakhtS.NouriA.VaiziriH.ChanD.et al (2013). Review of sand production prediction models. J. Petroleum Eng.2013, 116. 10.1155/2013/864981

  • 32

    RahmatiH.NouriA.VazirH.ChanD. (2012). Validation of predicted cumulative sand and sand rate against physical-model test. J. Can. Petroleum Technol.51 (5), 403410. 10.2118/157950-PA

  • 33

    RakhimzhanovaA.ThorntonC.AmanbekY.ZhaoY. (2021). Numerical simulations of sand production in oil wells using the CFD-DEM-IBM approach. J. Petroleum Sci. Eng.208, 109529. 10.1016/j.petrol.2021.109529

  • 34

    SantanaC.LikramaF. (2016). “Workflow on incorporating thick-walled cylinder test results in finite element models of near wellbore for sanding prediction studies,” in 50th US rock mechanics/geomechanics symposium (American Rock Mechanics Association), 16514.

  • 35

    SaskiT.ShaoB.ElshafieM.PapadopoulouM.YamamotoK.SogaL. (2021). Simulation of axial tensile well deformation during reservoir compaction in offshore unconsolidated methane hydrate-bearing formation. Comput. Geotechnics129, 103894. 10.1016/j.compgeo.2020.103894

  • 36

    ServantG.MarchinaP.PeyssonY.BemerE.NauroyJ. F. (2006). Sand erosion in weakly consolidated reservoirs: Experiments and numerical modeling. SPE100023. 10.2118/100023-MS

  • 37

    ShabdirovaA.MinhN. H.ZhaoY. (2019). A sand production prediction model for weak sandstone reservoir in Kazakhstan. J. Rock Mech. Geotechnical Eng.11 (4), 760769. 10.1016/j.jrmge.2018.12.015

  • 38

    ShahsavariM. H.KhamehchiE.FattahpourV.MolladavoodiH. (2021). Investigation of sand production prediction shortcomings in terms of numerical uncertainties and experimental simplifications. J. Petroleum Sci. Eng.207, 109147. 10.1016/j.petrol.2021.109147

  • 39

    ShirinabadiR.MoarefvaandP.GoshtasbiK.AhangariK. (2016). The physical and numerical modeling of sand production and gravel pack in oil wells by designing and manufacturing the machine and presenting a relation estimating sand production rate. J. Min. Sci.52 (2), 300312. 10.1134/s1062739116020453

  • 40

    SongR.ZhangP.TianX. M.HuangF. M.LiZ. W.LiuJ. N. (2022). Study on critical drawdown pressure of sanding for wellbore of underground gas storage in a depleted gas reservoir. Energies15 (16), 5913. 10.3390/en15165913

  • 41

    SongY. Q.RanjithP. G.WuB. L. (2020). Development and experimental validation of a computational fluid dynamics-discrete element method sand production model. J. Nat. Gas Sci. Eng.73, 103052. 10.1016/j.jngse.2019.103052

  • 42

    SongY. Q.RanjithP. G.WuB. L.SongZ. L. (2021). A microscopic study of sand arches and sand skeletons under hydrodynamic force based on the CFD-DEM model. J. Nat. Gas Sci. Eng.92, 104017. 10.1016/j.jngse.2021.104017

  • 43

    VardoulakisI.StavropoulouM.PapanastasiouP. (1996). Hydro-mechanical aspects of the sand production problem. Transp. Porous Media22 (2), 225244. 10.1007/bf01143517

  • 44

    VolontéG.ScarfatoF.BrignoliM. (2010). Sand prediction: A practical finite-element 3D approach for real field applications. SPE, 134464. 10.2118/134464-ms

  • 45

    WangM.FengY. T.WangC. Y. (2016). Coupled bonded particle and lattice Boltzmann method for modelling fluid-solid interaction. Int. J. Numer. Anal. Methods Geomech.40 (10), 13831401. 10.1002/nag.2481

  • 46

    WangX. Z.WangJ. Y.WangC. F.ZengL. F.LiuX. W. (2010). Quantitative description of characteristics of high-capacity channels in unconsolidated sandstone reservoirs using in situ production data. Pet. Sci.7 (1), 106111. 10.1007/s12182-010-0013-0

  • 47

    WangY.ChengK.YangY. F.TaoY. C.LiY. W. (2022). Microscopic mechanical analysis of sand production using a new arbitrary resolved-unresolved CFD-DEM model. Int. J. Multiph. Flow149, 103979. 10.1016/j.ijmultiphaseflow.2022.103979

  • 48

    WuB.ChoiS. K. (2012). Effect of mechanical and physical properties of rocks on post-failure cavity development-experimental and numerical studies. ARAM, 12489.

  • 49

    XiaT.FengQ. H.WangS.ZhangJ. Y.ZhangW.ZhangX. M. (2022). Numerical study and force chain network analysis of sand production process using coupled LBM-DEM. Energies15 (5), 1788. 10.3390/en15051788

  • 50

    YanZ. H.YangY.LiW.WangY. H.XieM. Y.XiongQ. (2021). Analysis of sand production law and key factors of offshore weakly cemented unconsolidated sandstone reservoirs. Fresenius Environ. Bull.30 (6A), 65746580.

  • 51

    YounessiA.RasouliV.WuB. (2013). Sand production simulation under true-triaxial stress conditions. Int. J. Rock Mech. Min. Sci.61, 130140. 10.1016/j.ijrmms.2013.03.001

  • 52

    ZhangF. S.WangT.LiuF.PengM.BateB.WangP. (2022). Hydro-mechanical coupled analysis of near-wellbore fines migration from unconsolidated reservoirs. Acta Geotech.17, 35353551. 10.1007/s11440-021-01396-2

  • 53

    ZhangP.ZhengS. J.JingJ. Q.ZhouY. N.LiQ. P.WangK.et al (2015). Surface erosion behavior of an intrusive probe in pipe flow. J. Nat. Gas Sci. Eng.26, 480493. 10.1016/j.jngse.2015.05.037

  • 54

    ZhangX. Y. (2021). Experimental study on stress sensitivity of permeability and elastic parameters of unconsolidated sandstone reservoirs. Fresenius Environ. Bull.30 (7), 84678475.

  • 55

    ZhaoB.SuY. Z.CongW.SunH. B.DongX. Y.HuM. H.et al (2020). Discrete element analysis on sand production risk and mechanism in unconsolidated sandstone oil and gas reservoir. J. Saf. Sci. Technol.16 (11), 5965. 10.11731/j.issn.1673-193x.2020.11.009

  • 56

    ZhouZ. Y.YuA. B.ChoiS. K. (2011). Numerical simulation of the liquid-induced erosion in a weakly bonded sand assembly. Powder Technol.211 (2-3), 237249. 10.1016/j.powtec.2011.04.029

  • 57

    ZivarD.ShadS.ForoozeshJ.SalmanpourS. (2019). Experimental study of sand production and permeability enhancement of unconsolidated rocks under different stress conditions. J. Petroleum Sci. Eng.181, 106238. 10.1016/j.petrol.2019.106238

Summary

Keywords

unconsolidated sandstone, sand production prediction, finite element method, finite difference method, discrete element method, discrete element-finite element hybrid method

Citation

Sun H, Ji G, Liu Z and Huang D (2023) Research advance of numerical simulation methods for sand production prediction of unconsolidated sandstone. Front. Energy Res. 10:1071320. doi: 10.3389/fenrg.2022.1071320

Received

17 October 2022

Accepted

07 November 2022

Published

17 January 2023

Volume

10 - 2022

Edited by

Qi Zhang, China University of Geosciences Wuhan, China

Reviewed by

Zhegwen Zhu, Wuhan University, China

Jian Xiong, Southwest Petroleum University, China

Yanjun Lu, Yanshan University, China

Updates

Copyright

*Correspondence: Guofa Ji,

This article was submitted to Advanced Clean Fuel Technologies, a section of the journal Frontiers in Energy Research

Disclaimer

All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.

Outline

Figures

Cite article

Copy to clipboard


Export citation file


Share article

Article metrics