ORIGINAL RESEARCH article

Front. Energy Res., 13 July 2022

Sec. Process and Energy Systems Engineering

Volume 10 - 2022 | https://doi.org/10.3389/fenrg.2022.905788

Developing an Artificial Hummingbird Algorithm for Probabilistic Energy Management of Microgrids Considering Demand Response

  • 1. Electrical Power Engineering, Egypt-Japan University of Science and Technology, New Borg El-Arab City, Egypt

  • 2. Department of Electrical Engineering, Faculty of Engineering, Aswan University, Aswan, Egypt

  • 3. Department of Electrical Engineering, Faculty of Engineering, Mansura University, Elmansoura, Egypt

  • 4. Platform of Inter/Transdisciplinary Energy Research, Kyushu University, Fukuoka, Japan

Abstract

This study proposes an artificial hummingbird algorithm (AHA) for energy management (EM) for optimal operation of a microgrid (MG), including conventional sources and renewable energy sources (RES), with an incentive-based demand response (DR). Due to the stochastic nature of solar and wind output power and the uncertainty of prices and load, a probabilistic EM with hybrid AHA and point estimation method (PEM) is proposed to model this uncertainty by utilizing the normal and Weibull distribution functions. The PEM method is considered a good tool for handling stochastic EM problems. It achieves good results using the same procedures used with the deterministic problems while maintaining low computational efforts. The proposed AHA technique is employed to solve a deterministic incentive DR program, with the goal of reducing the overall cost, which includes the cost of conventional generator fuel and the cost of power transaction with the main grid while taking into account the load demand. Two different case studies are tested. The simulation results of the proposed AHA is compared with the results of well-known metaheuristic algorithms to demonstrate its efficacy. According to AHA’s results, a total reduction of energy consumption by 104 KWh for the first case study and 2677 MWh for the second case study is achieved while achieving the lowest overall operating cost. The results demonstrate that the AHA is adequate for tackling the EM problem. Then, to examine the effect of uncertainty on the MG state, a probabilistic EM problem is solved using AHA-PEM.

1 Introduction

In recent years, the integration of productive subsystems or distributed generation (DG), which are called microgrids (MGs), into the main grid has played an essential role in resolving many energy-related problems (Shivam and Dahiya, 2018). MG can be connected to other MGs or the main grid, thereby exchanging energy between them or in a stand-alone configuration (Asano et al., 2007). For supplying power demanded in MGs, both conventional and different types of RES, such as solar photovoltaic (PV), wind turbine (WT), biomass units, microturbine units, and energy storage systems (ESS) (Khalili et al., 2019), are used. MG energy management (EM) has received significant attention in research for the optimal operation of MGs. EM involves the maximization or minimization of one or more objective functions, such as maximizing profit or minimizing total cost. MG’s optimal operation is essential for achieving effective EM at a low cost and maximum profit (Parisio et al., 2014).

A deterministic EM in MG is employed in (Aghajani and Ghadimi, 2018), in which the power generated from renewable sources, load profile, and market prices are considered. Many probabilistic EM approaches consider the uncertainties in renewable source generation, load demand, and energy prices (Tabatabaee et al., 2016, García Vera et al., 2019, Alavi et al., 2015). In (Arabali et al., 2013), the uncertainty of solar and wind generation, as well as the load demand, are considered. The EM problem is solved using GA optimization with the 2m point estimation method (PEM) in order to enhance the efficiency and reduce the total cost. In (Baziar and Kavousi-Fard, 2013), a probabilistic framework is modeled using the 2m PEM method, thereby considering uncertainties related to wind and solar power and market bid variations. A modified glowworm swarm optimization with PEM is proposed in (Ben Christopher and Carolin Mabel, 2020). Gravitational search algorithm (GSA) and 2m PEM are proposed in (Niknam et al., 2012a) to solve the EM problem of MGs involving the existing uncertainties in the MGs. Moreover, an improved bat algorithm is considered in (Li et al., 2014).

In (Nguyen et al., 2020) an improved stochastic fractal search algorithm is proposed to solve a multiobjective problem, get lower generation fuel cost, reduce power losses and emission, and enhance the voltage profile, with a faster execution. A new approach for reducing the power loss is proposed in (Nguyen et al., 2021), in which different optimization algorithms, such as particle swarm optimization (PSO), PPA, and TSA, are used.

Meanwhile, 2m + 1 PEM is used to solve the probabilistic EM of MG (Alavi et al., 2015, Mohammadi et al., 2013, Li et al., 2014); in (Alavi et al., 2015), PSO technique is used to reduce the total operating cost and enhance reliability. (Mohammadi et al., 2013) used 2m + 1 PEM with an adaptive modified firefly optimization algorithm while considering the uncertainties.

DR may be considered a tariff that motivates the customers to change their consumption as a response to the change in electricity price over time or to reduce the usage of electricity in response to incentive payments once the price of electricity in the market is high or in the case of grid reliability issues (Aalami et al., 2010).

DR is divided into two types: first, price-based DR (PDR), in which consumers’ electricity prices are altered at varying periods. For example, high prices during peak hours, medium prices during off-peak hours, and low prices during low-peak hours. Second, incentive-based DR (IDR), in which consumers receive incentive awards for changing their consumption (Jordehi, 2019).

In (Aghaei and Alizadeh, 2013), utilizing a hybrid augmented weighted-constraint approach and lexicographic optimization, DR and optimal power flow in a combined heat and power (CHP) system were presented in a MG with an energy storage system. In (Majidi et al., 2017), a multiobjective optimization problem is described for using the DRP to reduce the emissions and cost of a hybrid system. PSO technique was used in (Faria et al., 2013) to manage MG resources and DR in order to reduce the MG operator’s operating costs. Despite the previous studies, further study is needed to apply the DRP to power system issues to include customers and reduce MG fuel prices.

According to the studies mentioned above, several optimization techniques have been efficient in solving engineering challenges, particularly those incorporating EM. These research established the importance of applying new and improved optimization techniques for solving particular EM problems; moreover, according to Wolpert’s (1997) No-Free-Lunch theorem, there are no metaheuristic optimization algorithms capable of addressing all optimization problems. These two considerations inspired us to apply a newly developed optimization technique, artificial hummingbird algorithm (AHA), to solve the EM problem in MGs.

To the best of the authors’ knowledge, no similar study has been conducted. The uncertainties of load, market pricing, and PV and WT output power in grid-connected MG while considering DR and using AHA to solve the EM are investigated in this study. Table 1 illustrates a comparative analysis of the relevant literature in terms optimization technique, uncertainty modeling and contribution.

TABLE 1

ReferencesFormulationUncertainty modellingModeling approachDRRenewable PV and windObjective function
(Aghajani and Ghadimi, 2018)PSONo-NOyesMulti
(Arabali et al., 2013),GA optimizationYes2m PEMNoYesMulti
(Baziar and Kavousi-Fard, 2013),Modified PSOYes2m PEMNoYessingle
(Ben Christopher and Carolin Mabel, 2020)modified glowworm
swarm optimization (MOGSO)
Yes2m and 2m + 1 PEMNoYesSingle
(Niknam et al., 2012a)Gravitational search algorithm (GSA )Yes2m PEMNoYesMulti
(Alavi et al., 2015)PSOYes2m + 1 PEMNoYessingle
(Mohammadi et al., 2013)an adaptive modified firefly optimizationsYes2m + 1 PEMNoYessingle
(Li et al., 2014)an improved bat algorithmYes2m PEMNoYesSingle
(Aghaei and Alizadeh, 2013)lexicographic optimizationNo-YesNoMulti
(Majidi et al., 2017)PSONo-YesPV onlyMulti
(Faria et al., 2013)PSONo-YesYesMulti
ProposedAHAYes2m + 1 PEMYesYesMulti

A summary of the relevant literature.

The objective of this study is to use a newly developed optimization technique, AHA, to solve the EM problem for a MG with an incentive DR program. The proposed EM algorithm is compared to those achieved by other well-known algorithms to demonstrate its robustness. Also, a probabilistic EM using hybrid AHA-PEM to consider the uncertainties of renewable sources, load demand, and market prices is proposed. The main contributions of this study, however, may be stated as follows:

  • 1- Proposing a new application for a recent optimization technique, AHA, for solving the EM problem of a MG while considering DR.

  • 2- Studying two different scenarios; the first is deterministic EM with two different case studies. The first MG consists of one wind generator, one solar PV generator, three conventional generation units (diesel), and three residential customers with DRP, while the second one consists of an aggregated model for solar PV and wind, ten conventional generation units, and seven customers. The second scenario is used for probabilistic EM.

  • 3- Considering the probabilistic nature of the market pricing, load, and produced power of the PV and WT generators and modeling a stochastic energy cost function.

The rest of this paper is organized as follows: Section 2 presents the mathematical model for the MG with the DR model. Section 3 presents the modeling for the EM optimization problem. The uncertainty modeling is discussed in Section 4. Section 5 focuses on the recent optimization technique, AHA. Section 6 presents the simulation results obtained. Finally, the paper is concluded in Section 7.

2 Mathematical Model for Grid-Connected Microgrid

The structure of MG connected to the grid for this paper is shown in Figure 1. This MG comprises conventional generation sources, renewable generation sources (PV power generator and WT generator), and customers with DR model.

FIGURE 1

2.1 Grid-Connected Microgrid Model

In this work, the MG is connected to the main grid, and a power transaction is assumed to be bought or sold to the main grid. In the case of surplus (more than the demand) in generation from MG, power will be sold to the main grid, and vice versa.

If is the amount of power transaction MG and main grid at a time ; locational marginal prices are used (given as ) (Nwulu and Fahrioglu, 2013) for purchasing power between main and MG. Therefore, the cost of power transactions () can be obtained as:

2.2 Modeling of DR

Let be the cost customer incurred; where is customer type and x is the amount of consumption reduction in (KW or MW); thus, the benefit for the customer can be calculated as:

Equation 2 illustrates that the customer will participate in the DR program and reduce his consumption only in the case of , with y representing the total incentive that customers will receive for consumption reduction.

Also, MG benefit can be expressed as:where is the cost of power interruption from a particular customer. Power interruptibility can be calculated using optimal power flow analysis (Fahrioglu and Alvarado, 2000).

2.3 Customer Cost Function

The formulation for the customer’s cost function (

) can be expressed mathematically as:

where:

  • • is the customer willing: its value varies between 0 and 1 so that the customer who has the most willing g has this value as 1 and the lower willing customer has a value of 0.

  • • and are cost coefficients.

Customers’ contract formulation is computed as in (Fahrioglu and Alvarado, 2000); thus, if is the payment for customer (j) payment, the benefit for the customer can be expressed as:

Moreover, MG benefit is calculated as:

3 Formulation of the EM Problem

As previously mentioned, the grid-connected MG consists of different generation sources, conventional generators and RESs, and loads with a DR program. The operating cost consists of two components, conventional generation cost and power transaction cost. The main objective of MG management system is to optimize the operation of MG resources by lowering the generation cost and increasing the MG benefit while marinating customers’ benefit and satisfying the operational constraints.

3.1 The Operating Cost Function

For EM in grid-connected MG, one of the objectives in the studied optimization procedure is the minimization of conventional generators’ fuel cost and the transferred power’s cost between the main grid and MG, and it is given as:

The fuel cost for conventional generators () is represented by a quadratic model as follows:where and are the fuel cost coefficients for any conventional generator .

3.2 MG Benefit Function

The objective of maximizing the expected MG benefits can be formulated as follows:

Equation 9 indicates that the MG operator can benefit if he selects not to supply specific customers with power or pay incentive payments.

3.3 Constraints of Generation Sources

At any period t, the total power generated from conventional generation and RESs units and power transacted between the MG and main grid must supply total load demand with the DR program. In this paper, the active power losses in the MG are ignored. Hence, the power balance equation’s constraints can be expressed as:

where

  • (MW) is the total power demand at any time t.

  • is the customer (j) curtailed power at time t.

  • and are the minimum and maximum generation limits of a generator i, respectively.

  • is the hourly output power from the solar PV generator.

  • is the maximum forecasted PV power at a time .

  • is the hourly wind power at a time .

  • is the maximum forecasted wind generator power at a time .

  • is the maximum permissible transacted power between the MG and the main grid.

  • and are the maximum ramp up and ramp down rates for a generator , respectively.

I and T are the total number of conventional generators and dispatch interval, respectively.

Constraint in Eq. 10 describes the power balance to ensure that the total production and grid transacted power at any time t will equal the total demand. While Eq. 11 ensures that any conventional generation’s generation does not exceed its upper and lower limits, the constraint (Eq. 12) do not violate the ramp up and down rates for generators.

The constraints for maximum and minimum generation of solar and WT generators are represented in Eqs 13 and 14, respectively. Eq. 15 represents the transacted power constraint, which limits the power transacted between the MG and the utility grid to not exceed the maximum limit .

3.4 DR Constraints

where the upper limit for the MG budget limit is and the maximum daily power curtailment for customer is .

The demand management contract formulations in Eq. 5 are expanded to cover the entire 24 h-period (1 day) rather than just 1 h, making them more practical and cost effective. The constraint in Eq. 16 ensures that the client receives a total incentive for any power curtailed that is more than the cost of interruption. In addition, if the client increases his or her curtailment (constraint in Eq. 17), the customer should receive a higher incentive. Constraint (Eq. 18) describes the total MG budget limit constraint, thereby ensuring that the daily budget is less than the maximum. Eq. 19 ensures that any client’s total curtailment is within the allowable limits.

The mathematical model of the objective function is given as:

4 Uncertainty Modeling

This study presents a mathematical model for the MG EM that can deal with PV power, wind power generation, load consumption, and market price uncertainty. The chance of a discrepancy between the expected and actual components is defined as uncertainty. The operational cost of MG is substantially influenced by errors produced by the lack of uncertainty. As a result, km + 1 PEM is combined with AHA in this work to enhance MG EM on an uncertainty framework.

4.1 Probabilistic EM of the Micro Grid

In the presence of input variables, with random nature or uncertainty, the EM problem becomes probabilistic instead of deterministic. Because of the random nature of solar irradiance and wind speed, the output power from solar PV and WT generators are also random variables. Furthermore, load demand will not be exactly the same as the forecasted load due to forecasting errors, unexpected disturbances, load variations, or energy prices (Niknam et al., 2012a, Soroudi and Ehsan, 2011). Every probabilistic formulation requires statistical characterization of the random input variables and a method for evaluating statistical features of the output variables.

4.1.1 Statistical Characterization of the Input Random Variables (IRVs)

  • • Wind power

The power output and wind speed can be calculated as:where is the rated power of WT, is the rated wind speed, is the cut-in wind speed, and is the cutout wind speed, with and denoting the output power and the wind speed, respectively.

The power curve of WT is represented by the quadratic model (Eq. 21); thus, the quadratic approximation will be used to obtain the power probability density function (PDF) (Villanueva et al., 2011). Weibull distribution can be used to express the wind speed’s PDF at a certain location, such as what has been expressed in Eq. 22:and cumulative density function (CDF) is given as:

CDF and its inverse are utilized for computing the wind speed as following:

where C and k are the scale and shape parameters of the Weibull distribution, respectively and r is a uniformly distributed random number between 0 and 1. Different methods can be used for calculating C and K parameters (

Atwa et al., 2011

,

Jangamshetti and Rau, 1999

). Here, the parameters are approximately calculated using the mean wind

speed and the standard deviation (STD)

as follows (

Atwa et al., 2011

):

where gamma function (

) can be defined as in

Eq. 27

:

  • • Solar power

The output power of solar PV depends on the ambient temperature, solar irradiation, and characteristics of the module. The solar PV output power can be expressed as:where is the solar irradiation (w/m2), is the PV module temperature (°C), is the module temperature coefficient (°C −1), and is the PV module maximum output power at slandered test conditions ( = 1000 w/m2 and = 25°C).

The PV module temperature can be calculated based on the module’s nominal operating cell temperature () as (Radosavljević et al., 2016):where is the ambient temperature.

In this paper, solar irradiance is suggested to have a normal distribution function. As a result, the PDF of any variable can be expressed as:

Normal distribution CDF can be formulated as:

CDF and its inverse are used for determining the variable as follows:where is a uniformly distributed random variable in the range [0,1], is the mean value for the variable , is the variable STD, and and are the error function and its inverse, respectively, which can be calculated as:

In technical literature, there are many probabilistic approaches that deal with the uncertainties in renewable energy sources, load demand, and market prices for solving the EM problem. These approaches may be classified into three main categories (Morales and Perez-Ruiz, 2007): Monte Carlo simulation, analytical methods, and approximate methods.

Monte Carlo simulation (MCS) deals with uncertainties by generating random values for the variables. These values help solve the problem as a deterministic problem (Rubinstein and Kroese, 2016). However, MCS uses a deterministic routine to solve the problem in each simulation; its main drawback is that it requires a large number of simulations to attain convergence.

Analytical methods are more effective, but they are based on certain mathematical assumptions that simplify the problem to analyze the statistical characteristics of random output function y based on the statistical characteristics of random input variables p (Pei and Lee, 2004, Niknam et al., 2012b), and they do not yield optimal and accurate results (Ben Christopher and Carolin Mabel, 2020).

Approximate methods provide an approximate description of the statistical properties of output random variables. PEM is one of the approximation approaches. PEM uses a deterministic strategy to solve probabilistic problems, similar to MCS, but it has a much lower number of simulations than MCS. In addition, PEM has led to great reduction in calculation efforts in comparison with the MCS method.

It uses a deterministic strategy to solve a probabilistic issue, similar to MCS, but PEM has a significantly lower number of simulations than MCS.

PEM firstly was developed by Rosenblueth (1975), which was then modified in 1981 (Rosenblueth, 1981). However, this and similar approaches (Wang et al., Seo and Kwak, 2002) give more accurate estimates. The number of simulations required may be very large in a system with high random variables. Hong (1998) proposed PEM, where the number of required simulations grows linearly with the number of random or uncertain variables.

4.2 Point Estimation Method

The PEM approximation method is a scheme to linearize output variables with respect to IRVs. The basic idea of PEM is to compute the moments of a function

y

, a function of IRV (

m

), i.e.,

y = F(p1, p2, …, and pm),

and use the forecasted information of these variables to concentrate its first few central moments of the statistical information on

K

= 2, 3, …, and 5 points for each variable. By using these points statistical moments of output function

y

, statistical information on

y

can be approximated. To obtain the central moments, function

should be evaluated based on the adopted scheme number of times equal to 2 m, 2 m + 1, and 4 m + 1.

  • • 2m + 1 PEM scheme

Generally, in this scheme, three concentration points are used for each IRV. One of them is the mean value. The standard locations are:where and denote the third and fourth standard central moments and they are the skewness and kurtosis, respectively, of the input random variable pt.

Variable locations are:and weights are:

It is noted from (Eq. 36) that setting yields ; thus, the third location of all IRV will be the same as (). Hence, it is enough to evaluate the function F only once for this location, and the corresponding weight will be:

The moments’ vector of output random variables are estimated as:

After knowing these statistical moments of the output function, STD and mean can be obtained as:

Using the values of and , the Gram–Charlier series technique can be used to estimate the PDFs of the output random variables of interest based on statistical moments (Radosavljevic, 2018).

5 Optimization Algorithms

5.1 Description

This algorithm, AHA, is one of the bioinspired optimization techniques, which are better at balancing exploration and exploitation in the search for global optimum (Boussaïd et al., 2013). Recently, bioinspired algorithms have received the greatest traction (Darwish, 2018). Those algorithms transfer the biological activities of living organism algorithms into mathematical models, such as PSO, ant colony optimization, artificial bee colony, and cuckoo search, in an optimized manner. AHA was proposed in 2021 in (Zhao et al., 2022), although AHA belongs to the metaheuristics categories. It is pretty distinct from the previously developed bioinspired algorithms. The major difference is AHA’s particular biology background. This algorithm is inspired by hummingbirds’ unique flying abilities and sophisticated foraging techniques. AHA replicates three flying patterns: axial, omnidirectional, and diagonal, as well as three foraging strategies: guided, territorial, and migratory foraging search strategies. Additionally, for selecting the food source, the hummingbird’s memory function is implemented as a visit table.

5.2 Mathematical Model for the AHA

5.2.1 Initialization

In first step, the population of N hummingbirds are initialized to be placed at N food sources as:where is the ith food sources position (or solution) for the hummingbird; and are the lower and upper boundaries for the variables in search domain, respectively; and is a random vector between 0 and 1.

The visit table, which mimics the memory for hummingbirds, is initialized as:

The visit table at i = j is set to null, which means that this hummingbird is taking its food from its food source, and it is zero () to indicate that in the current iteration, the ith hummingbirds visit the jth food source.

5.1.2 Foraging

In AHA, there are mainly two strategies for foraging, guided foraging and territorial foraging. Guided foraging involves visiting food sources with the highest refilling nectar rate, thereby choosing it to be the target food source, and then trying to fly toward its target. In territorial foraging, after eating from the target food source, hummingbirds try to find a different food source. Therefore, it attempts to go to a nearby location in the hope of discovering a new food source which is superior to the existing one.

During foraging, a direction vector is used to model the three flights patterns. The patterns for those flights in a d-D space, in which a diagonal flight is defined as following:

The axial flight can be mathematically modeled:and the omnidirectional flight is defined as:where randperm(k) creates a random permutation of integers between 1 and k, randi([1, d]) creates a random integer between 1 to d, and r2 is a random number in [0, 1].

Hummingbirds visit the target food source using their flights, and the resulting food source is obtained. The candidate food source is updated based on the target food source for guided foraging as:

The mathematic simulation for territorial forging (local search) hummingbirds for a candidate food source is modeled as follows:where xi(t) is the position of the ith food source at current iteration t, is the position that ith hummingbirds intend to visit (target food source), and a and b are a guided factor and a territorial factor, respectively, which have a normal distribution with standard deviation = 1 and mean = 0.

Then, the position of the current food source for guiding foraging and territorial forging is updated as follows:

Equation 50 implies that if the current food source’s nectar-refilling rate is less than that of the candidate, the hummingbirds leave the current position and stay at the candidate food source for feeding instead, with referring to the fitness function value for (.).

In AHA, the visit table serves as the memory for indicating how long it has been since this hummingbird visited that food source location. Each hummingbird tends to visit a food source with the highest visit level. The guiding foraging with the update process for the visit table is indicated in Algorithm 1 for guided foraging and in Algorithm 2 for territorial forging.

Algorithm 1

Guiding foraging for AHA.

Algorithm 2

Territorial forging for AHA.

Migration foraging: migration for the hummingbird occurs when the most frequently visited region lacks food. The migration happened after a predefined number of iterations depending on the migration coefficient, given as:

In migration, the food source with the lowest (or worst) nectar-refilling rate will migrate to a new food source randomly generated across the search space. At this point, the hummingbird will leave the previous feeding location in favor of feeding on the new one. The migration from the source with the worst nectar-refilling rate to a new position is described in Eq. 52, and the visit table is updated, as described in Algorithm 3.

Algorithm 3

Migration forging for AHA.

In this paper, the advantages of two strategies were merged to address the MG EM problem and provide reliable statistical cost results. Figure 2 illustrates the suggested PEM-AHA algorithm.

FIGURE 2

6 Results and Discussion

In this section, the proposed algorithm is validated as:

6.1 MG Design

To investigate the performance and the effectiveness of the EM using AHA, a simulated MG comprising DG units and customers with DR is used. The MG is equipped with PV modules and a WT unit with different ratings in different scenarios. In addition, diesel generators are used. A typical illustration of a simulated MG is shown in Figure 1.

6.2 Operating Scenarios

To show the behavior of the EM with AHA in the MG test system, two different scenarios have been formulated. Both deterministic and probabilistic frameworks have been used to solve EM in MG, thereby studying the influence of uncertainty on MG financial assessments and cost estimates. In the first scenario for deterministic EM, the output powers of renewable energy units, PV and WT generators, are assumed to be equal to their forecasted values and at the maximum available power at each hour. Two different case studies are evaluated.

Through 2m + 1 PEM, the uncertainty in random renewable power production, market bids, and total demand are evaluated for probabilistic analysis. In this case, three concentrations were determined for each IRV, one of which was estimated at its mean and the other two were estimated on either side of the mean in the associated distribution function.

6.1.1 Scenario-1 Deterministic EM

In this scenario, two separate case studies are given. Based on the MG shown in Figure 1, the first case study (case study 1) is a small MG that consists of one PV and wind generator, three conventional generating units (diesel), and three residential customers with DRP. This 6.2.1 scenario will last for only 1 day (24 h). Table 2 presents the specifications of conventional generators (cost coefficients, upper and lower generating limits, and ramp up and down rates) and shows the customer information (customer type, cost function coefficients, and daily power curtailment maximum limit). The values of hourly power interruptibility (λi,t) are presented in Table 3, as well as the hourly total initial MG demand; all customers are assumed to have the same hourly power interruptibility. Table 4 presents the solar PV and wind hourly data. The MG daily budget (UB) in this case study is $500 cost.

TABLE 2

i,jConventional generatorsCustomer
ai($/kW2h)bi($/KW h)Pi,min (KW)Pi,max(KW)DRi (KW/h)URi (KW/h)K1,jK2,j (KW)
10.060.5043301.0791.3230
20.030.2506550.451.3781.3635
30.040.309880.91.8471.6440

Conventional generators and customers data (case study 1).

TABLE 3

Time (h)λi,t($)Total demand(KW)
t = 11.5731.83
t = 21.431.4
t = 32.231.17
t = 43.7631
t = 54.531.17
t = 64.732.1
t = 75.0432.97
t = 85.3534.1
t = 96.737.53
t = 106.1638.33
t = 116.3840.03
t = 126.8241.17
t = 137.339.67
t = 147.841.7
t = 158.542.1
t = 167.141.67
t = 176.840.7
t = 186.340.07
t = 195.838.63
t = 204.236.4
t = 213.834.1
t = 223.0132.8
t = 232.5332.5
t = 241.4232

λi,t values and total initial hourly demand (case study 1).

TABLE 4

Time (h)Solar (KW)Wind (KW)
t = 107.56
t = 207.5
t = 308.25
t = 408.48
t = 508.48
t = 609.42
t = 709.82
t = 87.9910.35
t = 910.5610.88
t = 1013.6111.01
t = 1114.9710.94
t = 121510.68
t = 1314.7810.42
t = 1414.5910.15
t = 1513.569.67
t = 1611.838.98
t = 1710.178.37
t = 187.667.61
t = 1906.7
t = 2005.72
t = 2107.21
t = 2207.75
t = 2307.88
t = 2407.69

Forecasted power from solar PV and wind generators (case study 1).

A second case with a larger MG is simulated for scalability validation of the algorithm. This case (case study 2) comprises an aggregated model for solar PV and wind and generators (data in Table 5), ten conventional generating units (parameters in Table 6), and seven customers to evaluate the algorithm’s scalability (data in Table 7). The initial load demand for case 2 is shown in Figure 3, and the load data and values of power interruptibility utilized were given in (Nwulu and Xia, 2017).

TABLE 5

Time (h)Solar (MW)Wind (MW)
t = 10113.44
t = 20112.55
t = 30123.76
t = 40127.21
t = 50127.33
t = 60141.44
t = 70147.39
t = 879.94155.38
t = 9105.69168.33
t = 10136.18165.28
t = 11149.75164.23
t = 12150160.32
t = 13147.89156.31
t = 14145.92152.3
t = 15135.65145.05
t = 16118.36134.8
t = 17101.71125.64
t = 1877.68114.2
t = 190100.63
t = 20085.95
t = 210108.26
t = 220116.38
t = 230118.33
t = 240115.38

Forecasted power from solar PV and wind generators (Scenario-1, case study 2).

TABLE 6

iai($/MW2h)bi($/MWh)Pi,min(MW)Pi,max(MW)DRi(MW/h)URi(MW/h)
10.0004321.630370200200
20.0006321.0535360200200
30.00039420.8133240150150
40.000723.930200100100
50.0007921.62331438080
60.0005617.8737603030
70.0021116.5120303030
80.004823.23271206060
90.1090819.5820804040
100.0095122.5425553030

Ten conventional generators units data (Scenario-1, case study 2).

TABLE 7

JK1,jK2,j
101.84711.64
20.141.37811.63
30.261.07911.32
40.370.912411.5
50.550.879411.21
60.841.37811.63
711.523111.5

Coefficients of the customer cost function, customer type, and daily customer curtailment limitations (case study 2) (Scenario-1).

FIGURE 3

The next subsections summarize the results of the two examples analyzed, which have been produced using various optimization approaches, including PSO, JAYA, and AHA:

  • i) Case study 1

All simulations have been executed using MATLAB 2021b on a 2.9 GHz i7 PC with 8 GB of RAM. A 20 independent run was performed, and the obtained results were compared with the results of the techniques reported in (

Moghaddam et al., 2011

,

Warid et al., 2016

,

Hashim et al., 2021

,

Ahmadianfar et al., 2022

), as shown in

Table 8

; the effectiveness of AHA with the best value of operating cost can be noticed when compared with other techniques. The convergence characteristic curve of the objective function for all studied techniques is shown in

Figure 4

, which demonstrates the effectiveness and robustness of the AHA technique in achieving faster convergence and the best value for the fitness function. Using the AHA technique, the optimal power produced by the three conventional generators (diesel generators) is depicted in

Figure 5

.

Figure 6

depicts the optimal power produced from solar PV generators, wind generators, and electricity transacted between the main grid and the MG. The optimal curtailed power from all customers and their incentives during the day are shown in

Figure 7

.

Table 9

shows the total power curtailed for each customer using all studied techniques and AHA during the day. A comparison of the total cost for the studied techniques is shown in

Figure 8

.

  • i) Case study 2

TABLE 8

Total operating cost ($)
TechniqueWorstBestMeanSD
PSO (Moghaddam et al., 2011)807.35477.4658.4990.47
JAYA (Warid et al., 2016)790.67647.49711.3241.57
HBA (Hashim et al., 2021)672.81460.39545.3140.11
INFO (Ahmadianfar et al., 2022)747.1355509.374615.976366.60
AHA389.3867279.7346337.931133.85

Comparison of the EM problem for Case 1.

FIGURE 4

FIGURE 5

FIGURE 6

FIGURE 7

TABLE 9

PSOJAYAHBAINFOAHA
Saving (kWh)
j
 125.0227.2125.183029.61
 233.2032.59932.4934.7934.92
 335.3839.1535.0338.8139.90
 Total(KWh)93.698.9692.70103.60104.44
Incentive($)
j
 169.1877.7861.6258.7457.95
 282.2388.0577.7174.2881.33
 384.56111.7285.4280.1689.21
 Total ($)235.97277.56224.77213.1847228.51

Total amount of energy saved and the total amount of incentive received (case study 1).

FIGURE 8

Using the AHA technique, the output power from PV and wind generator and the power transacted with the main grid is illustrated in Figure 9. Table 10 presents the total curtailed power and total incentive for each customer (seven customers) during the day for all studied techniques. Table 12 details a thorough comparison of the studied optimization strategies for generation cost, incentive payment cost, and power-transacted cost. Supplementary Appendix Table S1 presents the optimum power produced from ten conventional units in the Appendix, and Supplementary Appendix Table S2 presents a comprehensive curtailed power from seven customers.

FIGURE 9

TABLE 10

PSOJAYAHBAINFOAHA
Saving (kWh)
j
 1179.47179.8179.92179.03179.86
 2229.74226.42229.87229.96229.91
 3309.8306.80309.34309.87309.32
 4389.58389.14389.9389.87389.45
 5394.73439.33439.97438.488438.89
 6529.86528.10528.93529.48529.09
 7594.18598.81598.57599.82599.98
 Total(KWh)2627.42668.402676.52676.502676.5
Incentive ($)
j
 18980.908994.908873.907748.8928873.90
 211,390.8011,333.9012,300.5010,504.2812,300.50
 315,372.0015,439.7015,323.7016,655.2315,323.70
 419,470.8019,438.9020,328.0521,152.7420,328.05
 519,893.7021,888.8021,927.8026,017.2921,927.80
 626,474.1026,470.8025,982.8035,103.3925,982.80
 729,890.9029,964.4029,352.4028,140.7128,352.40
 Total ($)131,473.2133,531.30125,683.28145,322.5133,089.2

Total amount of energy saved and the total amount of incentive received (case study 2).

Looking at the simulation results for case study 1, Table 9 reveals that in the case of AHA, the overall power curtailment is the highest compared with other techniques. Also, it can be noted from Figure 8 that the overall amount of power transacted with the grid is substantially lower in the case of AHA as well as the total cost.

In case study 2, the results in Table 10 show that AHA has a larger overall power curtailment than the PSO and the JAYA cases. Table 11 shows that employing the AHA approach has a lower overall cost than the other procedures.

TABLE 11

PSOJAYAHBAINFOAHA
Total Conventional Power (MW)29,621.8830,330.5330,032.4329,997.5230,383.60
Total Conventional Power Cost ($)649,490665,480658,960664,310653,520
Total Transferred Power (MW)4302.0923229.6673642.393781.2413291.242
Total Transferred Power Cost ($)31,835.4823,899.53626,317.92528,358.3424,355.1908
Total Power Curtailment2670.262668.402676.502676.502676.5
Total Customer Incentive ($)131,473.2133,531.30125,799.2145,322.5133,089.2
Total Cost ($)812,798.7822,910.84811,077.1837,990.84810,964.4

Cost breakdown for the studied optimization techniques (case study 2).

6.1.2 Scenario-2 Probabilistic EM

In this scenario, the point estimation technique (2m + 1) is combined with the AHA algorithm in order to provide the optimal solution for probabilistic EM. The WT and PV output power, market price, and demand load level are utilized as uncorrelated RIVs. Furthermore, the PV and WT generators’ output power, market price, and demand load level are determined using proper PDF modeling for hourly data of wind power and solar power, as specified in Section 4.1.1. It is assumed that PV output power, market prices, and load demand follow a normal distribution, with a standard deviation of 5% for PV and market prices (Radosavljevic, 2018) and 3% for load demand. The Weibull distribution is considered for the output power of the WT units, with an STD of 5%. Following that, the 2m + 1 approach is used to solve the probabilistic EM problem; IRVs’ concentrations (locations) during the implementation of 2m + 1 are calculated, as indicated in Table 12. AHA approach is employed using data acquired from (2m + 1) for each case. Finally, the statistical moments are calculated, and then, the mean value ( and standard deviation (STD) of the EM output random variables (MG’s operating cost) are calculated; the results are shown in Table 13.

TABLE 12

t (h)PV1 KWPV2 (KW)WT1 (KW)WT2 (KW)Load1 (KW)Load2 (KW)λ1,t($)λ2,t($)PVµWTµLoadµλt($)µ
10.00000.00008.54697.227333.483930.17611.70601.43400.00007.887131.83001.5700
20.00000.00008.48107.171933.031629.76841.52121.27880.00007.826431.40001.4000
30.00000.00009.30547.865332.789629.55042.39052.00950.00008.585331.17002.2000
40.00000.00009.55828.078032.610829.38924.08563.43440.00008.818131.00003.7600
50.00000.00009.55828.078032.789629.55044.88974.11030.00008.818131.17004.5000
60.00000.000010.59148.947133.768030.43205.10704.29300.00009.769232.10004.7000
70.00000.000011.03109.316934.683231.25685.47654.60350.000010.174032.97005.0400
88.68207.298011.61369.807035.871932.32815.81334.88677.990010.710334.10005.3500
911.47459.645512.196110.297039.480135.57997.28026.119810.560011.246537.53006.7000
1014.788712.431312.339010.417240.321736.33836.69355.626513.610011.378138.33006.1600
1116.266413.673612.262110.352542.110037.95006.93255.827514.970011.307340.03006.3800
1216.299013.701011.976310.112143.309339.03077.41066.229415.000011.044241.17006.8200
1316.060013.500011.69059.871741.731337.60877.93226.667814.780010.781139.67007.3000
1415.853513.326511.39379.622043.866839.53328.47557.124514.590010.507941.70007.8000
1514.734312.385710.86619.178244.287639.91249.23617.763913.560010.022242.10008.5000
1612.854510.805510.10778.540343.835239.50487.71496.485111.83009.324041.67007.1000
1711.05079.28939.43737.976342.814838.58527.38896.211110.17008.706840.70006.8000
188.32346.99668.60197.273642.152137.98796.84565.75447.66007.937740.07006.3000
190.00000.00007.60176.432240.637336.62276.30235.29770.00007.016938.63005.8000
200.00000.00006.52455.526138.291434.50864.56373.83630.00006.025336.40004.2000
210.00000.00008.16226.903735.871932.32814.12913.47090.00007.533034.10003.8000
220.00000.00008.75587.403034.504331.09573.27072.74930.00008.079432.80003.0100
230.00000.00008.89877.523234.188730.81132.74912.31090.00008.210932.50002.5300
240.00000.00008.68987.347533.662830.33721.54301.29700.00008.018732.00001.4200

Locations of the input random variables for EM and corresponding costs.

TABLE 13

($) ($)2 ($)3 ($)4 ($) ($)
378.95481.6026e + 057.4056e + 073.6618e + 10378.9548129.0465

Statistical moments of total expected cost for Case 1.

The PDF of the total expected cost for case study 1 is shown in Figure 10. These results demonstrate that the proposed strategy with AHA could solve the EM problem in unpredictable environments.

FIGURE 10

7 Conclusion

In this paper, a new application of an efficient optimizer, AHA, has been proposed for solving the EM problem of grid-connected MG with DRP. Moreover, a probabilistic EM using hybrid AHA and 2m + 1 PEM has been investigated. The main objective of this study is to get the lowest conventional generating and transaction costs to maximize the MG operator benefit. For deterministic operation, different optimization techniques have been utilized to solve the EM problem in MG over 24 h (1 day) to achieve the optimum operation on both sides of generation and demand. According to AHA’s results, in the first case study, energy consumption has been reduced by 104 KWh, while that in the second case study was reduced by 2677 MWh. The results of two case studies for the studied optimization strategies evaluated have been discussed, thereby proving that the AHA has the lowest overall cost. A probabilistic EM is solved using AHA-PEM, which allows operators of the MG system to make more realistic decisions and examine the effect of input random variable uncertainties on the statistical indicators, which describe the MG system state.

Statements

Data availability statement

The original contributions presented in the study are included in the article/Supplementary Material. Further inquiries can be directed to the corresponding author.

Author contributions

All authors contributed to manuscript revision, read, and approved the submitted version.

Acknowledgments

NA is very grateful to the Egyptian Ministry of Higher Education for providing financial support in the form of a PhD scholarship. In addition, we thank the Japanese International Cooperation Agency for providing all facilities to accomplish this research. The icons used in this paper were developed using Freepik, AmethystDesign, Arkinasi, and Smashicons from www.flaticon.com.

Conflict of interest

The authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

Publisher’s note

All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations or those of the publisher, the editors, and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.

Supplementary material

The Supplementary Material for this article can be found online at: https://www.frontiersin.org/articles/10.3389/fenrg.2022.905788/full#supplementary-material

Abbreviations

  • MG

    Microgrid

  • DR

    Demand response

  • AHA

    Artificial Hummingbird Algorithm

  • EM

    Energy Management

  • RES

    Renewable Energy Sources

  • PEM

    Point Estimation Method

  • PV

    Photovoltaic

  • WT

    Wind turbine

  • PDR

    price-based DR

  • IDR

    incentive-based DR

  • PSO

    Particle swarm optimization

  • HBA

    Honey Badger Algorithm

Nomenclature

Variables and parameters

  • Transaction cost

  • Locational Marginal Prices

  • Power truncation

    Transacted power

  • Customer benefit function

  • Incentive payment

  • Customer cost

  • MG operator benefit function

  • power interruption cost

  • customer willing

  • , and

    Customer cost coefficients

  • fuel cost for conventional generator

  • and

    Minimum and maximum generation limits generator i

  • PV output power

  • Wind turbine output power

  • Power truncation

    Transacted power

  • Total power demand

  • Probability Density Function

  • cumulative density function (CDF)

  • Concentration points

  • and

    skewness and kurtosis

  • Moments vector

  • Slandered deviation

  • mean

  • N

    Hummingbirds number (population)

  • Visit Table

  • MG

    Microgrid

  • DR

    Demand response

  • AHA

    Artificial Hummingbird Algorithm

  • EM

    Energy Management

  • RES

    Renewable Energy Sources

  • PEM

    Point Estimation Method

  • PV

    Photovoltaic

  • WT

    Wind turbine

  • PDR

    price-based DR

  • IDR

    incentive-based DR

  • PSO

    Particle swarm optimization

  • HBA

    Honey Badger Algorithm

References

  • 1

    AalamiH. A.MoghaddamM. P.YousefiG. R. (2010). Demand response modeling considering Interruptible/Curtailable loads and capacity market programs. Applied Energy87, 243–250. 10.1016/j.apenergy.2009.05.041

  • 2

    AghaeiJ.AlizadehM.-I. (2013). Multi-objective self-scheduling of CHP (combined heat and power)-based microgrids considering demand response programs and ESSs (energy storage systems). Energy55, 1044–1054. 10.1016/j.energy.2013.04.048

  • 3

    AghajaniG.GhadimiN. (2018). Multi-objective energy management in a micro-grid. Energy Reports4, 218–225. 10.1016/j.egyr.2017.10.002

  • 4

    AhmadianfarI.HeidariA. A.NoshadianS.ChenH.GandomiA. H. (2022). INFO: An efficient optimization algorithm based on weighted mean of vectors. Expert Systems with Applications195, 116516. 10.1016/j.eswa.2022.116516

  • 5

    AlaviS. A.AhmadianA.Aliakbar-GolkarM. (2015). Optimal probabilistic energy management in a typical micro-grid based-on robust optimization and point estimate method. Energy Conversion and Management95, 314–325. 10.1016/j.enconman.2015.02.042

  • 6

    ArabaliA.GhofraniM.Etezadi-AmoliM.FadaliM. S.BaghzouzY. (2013). Genetic-Algorithm-Based Optimization Approach for Energy Management. IEEE Trans. Power Delivery28, 162–170. 10.1109/tpwrd.2012.2219598

  • 7

    AsanoH.HatziargyriouN.IravaniR.MarnayC. (2007). Microgrids: an overview of ongoing research, development, and demonstration projects. IEEE Power Energy Magazine, 78–94.

  • 8

    AtwaY. M.El-SaadanyE. F.SalamaM. M. A.SeethapathyR.AssamM.ContiS. (2011). Adequacy Evaluation of Distribution System Including Wind/Solar DG During Different Modes of Operation. IEEE Trans. Power Syst.26, 1945–1952. 10.1109/tpwrs.2011.2112783

  • 9

    BaziarA.Kavousi-FardA. (2013). Considering uncertainty in the optimal energy management of renewable micro-grids including storage devices. Renewable Energy59, 158–166. 10.1016/j.renene.2013.03.026

  • 10

    Ben ChristopherS. J.Carolin MabelM. (2020). A bio-inspired approach for probabilistic energy management of micro-grid incorporating uncertainty in statistical cost estimation. Energy203, 117810. 10.1016/j.energy.2020.117810

  • 11

    BoussaïdI.LepagnotJ.SiarryP. (2013). A survey on optimization metaheuristics. Information sciences237, 82–117. 10.1016/j.ins.2013.02.041

  • 12

    DarwishA. (2018). Bio-inspired computing: Algorithms review, deep analysis, and the scope of applications. Future Computing and Informatics Journal3, 231–246. 10.1016/j.fcij.2018.06.001

  • 13

    FahriogluM.AlvaradoF. L. (2000). Designing incentive compatible contracts for effective demand management. IEEE Trans. Power Syst.15, 1255–1260. 10.1109/59.898098

  • 14

    FariaP.SoaresJ.ValeZ.MoraisH.SousaT. (2013). Modified Particle Swarm Optimization Applied to Integrated Demand Response and DG Resources Scheduling. IEEE Trans. Smart Grid4, 606–616. 10.1109/tsg.2012.2235866

  • 15

    García VeraY. E.Dufo-LópezR.Bernal-AgustínJ. L. (2019). Energy Management in Microgrids with Renewable Energy Sources: A Literature Review. Applied Sciences9, 3854.

  • 16

    HashimF. A.HousseinE. H.HussainK.MabroukM. S.Al-AtabanyW. (2021). “Honey Badger Algorithm: New metaheuristic algorithm for solving optimization problems,” in Mathematics and Computers in Simulation.

  • 17

    HongH. P. (1998). An efficient point estimate method for probabilistic analysis. Reliability Engineering & System Safety59, 261–267. 10.1016/s0951-8320(97)00071-9

  • 18

    JangamshettiS. H.RauV. G. (1999). Site matching of wind turbine generators: a case study. IEEE Trans. On energy Conversion14, 1537–1543. 10.1109/60.815102

  • 19

    JordehiA. R. (2019). Optimisation of demand response in electric power systems, a review. Renewable and Sustainable Energy Reviews103, 308–319. 10.1016/j.rser.2018.12.054

  • 20

    KhaliliT.JafariA.AbapourM.Mohammadi-IvatlooB. (2019). Optimal battery technology selection and incentive-based demand response program utilization for reliability improvement of an insular microgrid. Energy169, 92–104. 10.1016/j.energy.2018.12.024

  • 21

    LiP.ZhouZ.ShiR. (2014). “Probabilistic optimal operation management of microgrid using point estimate method and improved bat algorithm,” in Proceeding of the 2014 IEEE PES General Meeting | Conference & Exposition, 1–5.

  • 22

    MajidiM.NojavanS.Nourani EsfetanajN.Najafi-GhalelouA.ZareK. (2017). A multi-objective model for optimal operation of a battery/PV/fuel cell/grid hybrid energy system using weighted sum technique and fuzzy satisfying approach considering responsible load management. Solar Energy144, 79–89. 10.1016/j.solener.2017.01.009

  • 23

    MoghaddamA. A.SeifiA.NiknamT.Alizadeh PahlavaniM. R. (2011). Multi-objective operation management of a renewable MG (micro-grid) with back-up micro-turbine/fuel cell/battery hybrid power source. Energy36, 6490–6507. 10.1016/j.energy.2011.09.017

  • 24

    MohammadiS.MozafariB.SolimaniS.NiknamT. (2013). An Adaptive Modified Firefly Optimisation Algorithm based on Hong's Point Estimate Method to optimal operation management in a microgrid with consideration of uncertainties. Energy51, 339–348. 10.1016/j.energy.2012.12.013

  • 25

    MoralesJ. M.Perez-RuizJ. (2007). Point Estimate Schemes to Solve the Probabilistic Power Flow. IEEE Trans. Power Syst.22, 1594–1601. 10.1109/tpwrs.2007.907515

  • 26

    NguyenT. T.LeK. H.PhanT. M.DuongM. Q. (2021). An Effective Reactive Power Compensation Method and a Modern Metaheuristic Algorithm for Loss Reduction in Distribution Power Networks. Complexity2021, 8346738. 10.1155/2021/8346738

  • 27

    NguyenT. T.NguyenT. T.DuongM. Q.DoanA. T. (2020). Optimal operation of transmission power networks by using improved stochastic fractal search algorithm. Neural Comput & Applic32, 9129–9164. 10.1007/s00521-019-04425-0

  • 28

    NiknamT.GolestanehF.MalekpourA. (2012a). Probabilistic energy and operation management of a microgrid containing wind/photovoltaic/fuel cell generation and energy storage devices based on point estimate method and self-adaptive gravitational search algorithm. Energy43, 427–437. 10.1016/j.energy.2012.03.064

  • 29

    NiknamT.Kavousi FardA.BaziarA. (2012b). Multi-objective stochastic distribution feeder reconfiguration problem considering hydrogen and thermal energy production by fuel cell power plants. Energy42, 563–573. 10.1016/j.energy.2012.02.023

  • 30

    NwuluN. I.FahriogluM. (2013). A soft computing approach to projecting locational marginal price. Neural Comput & Applic22, 1115–1124. 10.1007/s00521-012-0875-8

  • 31

    NwuluN. I.XiaX. (2017). Optimal dispatch for a microgrid incorporating renewables and demand response. Renewable Energy101, 16–28. 10.1016/j.renene.2016.08.026

  • 32

    ParisioA.RikosE.GlielmoL. (2014). A Model Predictive Control Approach to Microgrid Operation Optimization. IEEE Trans. Contr. Syst. Technol.22, 1813–1827. 10.1109/tcst.2013.2295737

  • 33

    PeiZ.LeeS. T. (2004). Probabilistic load flow computation using the method of combined cumulants and Gram-Charlier expansion. IEEE Transactions on Power Systems19, 676–682.

  • 34

    RadosavljevicJ. (2018). Metaheuristic Optimization in Power Engineering. Institution of Engineering and Technology.

  • 35

    RadosavljevićJ.JevtićM.KlimentaD. (2016). Energy and operation management of a microgrid using particle swarm optimization. Engineering Optimization48, 811–830.

  • 36

    RosenbluethE. (1975). Point estimates for probability moments. Proc. Natl. Acad. Sci. U.S.A.72, 3812–3814. 10.1073/pnas.72.10.3812

  • 37

    RosenbluethE. (1981). Two-point estimates in probabilities. Applied Mathematical Modelling5, 329–335. 10.1016/s0307-904x(81)80054-6

  • 38

    RubinsteinR. Y.KroeseD. P. (2016). Simulation and the Monte Carlo Method. Wiley Publishing.

  • 39

    SeoH. S.KwakB. M. (2002). Efficient statistical tolerance analysis for general distributions using three-point information. International Journal of Production Research40, 931–944. 10.1080/00207540110095709

  • 40

    ShivamDahiyaR. (2018). Stability analysis of islanded DC microgrid for the proposed distributed control strategy with constant power loads. Computers & Electrical Engineering70, 151–162. 10.1016/j.compeleceng.2018.02.020

  • 41

    SoroudiA.EhsanM. (2011). A possibilistic-probabilistic tool for evaluating the impact of stochastic renewable and controllable power generation on energy losses in distribution networks-A case study. Renewable and Sustainable Energy Reviews15, 794–800. 10.1016/j.rser.2010.09.035

  • 42

    TabatabaeeS.MortazaviS. S.NiknamT. (2016). Stochastic energy management of renewable micro-grids in the correlated environment using unscented transformation. Energy109, 365–377. 10.1016/j.energy.2016.04.067

  • 43

    VillanuevaD.PazosJ. L.FeijooA. (2011). Probabilistic Load Flow Including Wind Power Generation. IEEE Trans. Power Syst.26, 1659–1667. 10.1109/tpwrs.2010.2096436

  • 44

    WangL.BeesonD.WiggsG. (2004). “Efficient and Accurate Point Estimate Method for Moments and Probability Distribution Estimation,” in 10th AIAA/ISSMO Multidisciplinary Analysis and Optimization Conference. 10.2514/6.2004-4359

  • 45

    WaridW.HizamH.MariunN.Abdul-WahabN. (2016). Optimal Power Flow Using the Jaya Algorithm. Energies9, 678. 10.3390/en9090678

  • 46

    ZhaoW.WangL.MirjaliliS. (2022). Artificial hummingbird algorithm: A new bio-inspired optimizer with its engineering applications. Computer Methods in Applied Mechanics and Engineering388, 114194. 10.1016/j.cma.2021.114194

Summary

Keywords

energy management, Microgrid, renewable energy sources, generation uncertainty, optimization, artificial hummingbird algorithm

Citation

Alamir N, Kamel S, Megahed TF, Hori M and Abdelkader SM (2022) Developing an Artificial Hummingbird Algorithm for Probabilistic Energy Management of Microgrids Considering Demand Response. Front. Energy Res. 10:905788. doi: 10.3389/fenrg.2022.905788

Received

27 March 2022

Accepted

25 May 2022

Published

13 July 2022

Volume

10 - 2022

Edited by

Sorour Alotaibi, Kuwait University, Kuwait

Reviewed by

Baseem Khan, Hawassa University, Ethiopia

Minh Quan Duong, The University of Danang, Vietnam

Updates

Copyright

*Correspondence: Nehmedo Alamir,

This article was submitted to Process and Energy Systems Engineering, a section of the journal Frontiers in Energy Research

Disclaimer

All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.

Outline

Figures

Cite article

Copy to clipboard


Export citation file


Share article

Article metrics