BRIEF RESEARCH REPORT article

Front. Energy Res., 29 September 2023

Sec. Advanced Clean Fuel Technologies

Volume 11 - 2023 | https://doi.org/10.3389/fenrg.2023.1267228

Enhancing the benefit of slide steering drilling systems in horizontal wells of unconventional reservoirs

  • 1. Engineering and Technology Research Institute, CNPC Xinjiang Oilfield Company, Karamay, Xinjiang, China

  • 2. Development Company, CNPC Xinjiang Oilfield Company, Karamay, Xinjiang, China

  • 3. School of Petroleum Engineering, China University of Petroleum (East China), Qingdao, Shandong, China

  • 4. CNPC Research Institute of Safety and Environment Technology, Beijing, China

Abstract

The slide steering drilling system consisting of a bent positive displacement motor (PDM) and measurement while drilling (MWD) system is widely used to continuously implement all wellpath control operations by alternately applying the slide and compound drilling modes. Due to the large friction force on the drilling string during slide drilling in the horizontal section, there is a significant adverse impact on both the drilling speed and horizontal extension ability. To efficiently and economically drill long horizontal sections, it is essential to increase the compound drilling proportion and decrease the alternative times of the two drilling modes. According to the features of wavy or tortuous horizontal sections and wellpath calculation models, a prediction and control method for the compound drilling proportion of horizontal sections is first established, and subsequently, its influencing factors and laws are analyzed and verified using an example. Theoretical research and drilling practice have shown that the compound drilling proportion of the horizontal section depends on the build-up rate of slide drilling and the inclination and azimuth change rates of compound drilling and is independent of the target area parameters and wellpath fluctuation ratio. In order to increase the compound drilling proportion and reduce the slide drilling frequency in the horizontal section, it is necessary to increase the build-up rate of slide drilling properly and reduce the inclination and azimuth change rates of compound drilling to the greatest extent. This paper is helpful to enhance the benefit of slide steering drilling systems in horizontal wells of unconventional reservoirs.

1 Introduction

A horizontal well is an important method to develop unconventional reservoirs, like shale gas (Guo et al., 2019; Lu et al., 2021), tight oil, gas hydrate (Zhang et al., 2022a), and even deep reservoirs (Zhang et al., 2022b; Cao et al., 2022). The slide steering drilling system composed of a bent positive displacement motor (PDM) and measurement while drilling (MWD) system is widely used in horizontal wells. This system has two working modes, namely, slide drilling mode and compound drilling mode (Samuel et al., 2005; Guan et al., 2021). By alternatively applying these two modes, it can continuously implement wellpath control operations without tripping operations. Currently, longer horizontal wells are being drilled to develop unconventional oil and gas (Guo et al., 2019; Lu et al., 2021; Yu et al., 2021; Ma et al., 2022). Because the drillstring does not rotate in the slide drilling mode, the friction force on the drillstring not only decreases the weight-on-bit transmission efficiency and causes low drilling speed but also influences the horizontal extension ability (Maidla and Haci, 2004; Samuel, 2010; Zhu et al., 2019).

Some researchers have pointed out that the actual wellpath of a horizontal section drilled by the slide steering drilling system is always in a wavy or tortuous shape, and the wellpath tortuosity influences the wellpath calculation, drag, and torque on the drillstring (Samuel et al., 2005; Samuel, 2010; Brands and Lowdon, 2012; Noshi and Schubert, 2019; Samuel et al., 2021). Some models have taken the wellpath tortuosity into account to enhance the calculation precision of the wellpath (Samuel et al., 2005; Noshi and Schubert, 2019) and the prediction precision of drag and torque on the drillstring (Samuel, 2010; Brands and Lowdon, 2012). Some researchers have realized that the wellpath tortuosity and drilling efficiency are influenced by the build-up rate of slide drilling and the inclination and azimuth change rates of compound drilling. Some models have been established to predict the build-up rate of slide drilling (Williams et al., 1989; Shi et al., 2017; Liu et al., 2019) or inclination and azimuth change rates of compound drilling (Peng and Di Qinfeng, 2000; Guo et al., 2013; Koulidis et al., 2021). Although it is well known that increasing the compound drilling proportion is the key to achieving fast and cost-effective drilling, the prediction and control method for the compound drilling proportion is still lacking.

In order to enhance the benefit of a slide steering drilling system, a prediction and control method for the compound drilling proportion of horizontal sections is established, and subsequently, its influencing factors and laws are analyzed.

2 Methods (compound drilling proportion of horizontal sections)

2.1 Wellpath description of the drilled horizontal section

As shown in Figure 1, the actual wellpath of the horizontal section drilled by a slide steering drilling system is always in a wavy or tortuous shape (Samuel et al., 2005; Noshi and Schubert, 2019). Because the inclination and azimuth commonly fluctuate slowly under compound drilling, the slide drilling must be alternated to decrease (or increase) the inclination and azimuth and control the wellpath within the target area once the drill bit is near the boundary lines of the horizontal target area. For a long horizontal section, two drilling modes may alternate multiple times. Then, the actual horizontal section has more control cycles. In one wavy cycle or control cycle, two drilling modes alternate once.

FIGURE 1

Suppose that the compound drilling tends to increase inclination and azimuth simultaneously, and then take the rectangular horizontal target area and the first wellpath control cycle as an example. The target half-width is set as a, and the target half-height is b; for the compound drilling interval, the starting point is No. 0 point, the lowest point on the vertical projection plot (the far left point on the horizontal plot) is No. 1 point, and the endpoint is No. 2 point; and for the slide drilling interval, the starting point is No. 2 point, the highest point (the far right point on the horizontal plot) is No. 3 point, and the last point is No. 4 point. To reduce the alternate times of slide and compound drilling, let the inclinations of the highest and lowest points on the vertical projection plot be equal to the target inclination and the azimuths of the far left and right points on the horizontal plot be equal to the target azimuth. All node parameters of the actual horizontal section are presupposed and shown in Figure 1. For the compound drilling interval, the key parameters include the compound drilling length (), the inclination change rate , and azimuth change rate ; for the slide drilling interval, the key parameters include the slide drilling length () and build-up rate ; and for these two intervals, the key parameters include the allowable inclination bias and azimuth bias .

2.2 Wellpath constraints of the drilled horizontal section

According to the wellpath calculation methods (Guan et al., 2021), the actual shapes of compound and slide drilling intervals are closest to the cylindrical spiral line and the inclined arc line, respectively. The cylindrical spiral method (curvature radius method) and inclined arc method (minimum curvature method) are applied alternatively to calculate all wellpath parameters of the actual horizontal section. According to the presupposed node parameters in Figure 1, the first wellpath control cycle from No. 0 point to No. 4 point can be divided into four intervals, and then all vertical depth increments (i = 1–4), N-coordinate increments (i = 1–4), E-coordinate increments (i = 1–4), and dog-leg angles can be calculated using Eqs 1–4, respectively:

As shown in Figure 1, while drilling the horizontal section, the actual horizontal wellpath must be controlled within the target area, and then the actual wellpath of the horizontal section must meet the inequality constraint as follows:or

If the designed target inclination and/or target azimuth , the next derivation process will be more complex. However, you can imagine that the horizontal section can be rotated in the horizontal direction on the vertical projection plot and in the east direction on the horizontal plot. After the rotation transformation, the shape of the actual horizontal section has not changed. Next, the node parameters in Figure 1 are substituted into Eqs 1–4 and then into Eq. 6. Finally, Eq. 6 can be deduced as follows:

Considering the allowed inclination bias and azimuth bias , which are characterized by the parameters of the compound drilling interval (inclination change rate , azimuth change rate , and length ) and slide drilling interval (build-up rate and length ), Eq. 6 can be transformed into Eq. 7.

From Eqs

6

,

7

, it can be observed that

  • (1) Once the target half-width a and target half-height b are given, the maximum allowed inclination bias and azimuth bias of the horizontal section, the maximum allowed compound drilling length , and slide drilling length in one wellpath control cycle depend on the build-up rate of slide drilling and the inclination change rate and azimuth change rate of compound drilling.

  • (2) Once the build-up rate of slide drilling and the inclination change rate and the azimuth change rate of compound drilling are given, the maximum allowed inclination bias and azimuth bias of the horizontal section can be solved using Eq. 6, and the maximum allowed compound drilling length and slide drilling length of the horizontal section in one wellpath control cycle can be solved using Eq. 7.

2.3 Compound drilling proportion of the horizontal section

In one wellpath control cycle of the horizontal section, the allowed compound drilling length is , the slide drilling length is , and the compound drilling proportion is defined and calculated using Eq. 8.

If the build-up rate of slide drilling and the inclination change rate , and azimuth change rate of compound drilling are given, the maximum allowed compound drilling length and slide drilling length in one wellpath control cycle can be solved using Eq. 7. In fact, according to the last formula in Eq. 7, another relationship among these five characteristic parameters can be derived as follows:

According to Eq. 9, the upper limit of the compound drilling proportion can be estimated as follows:

Because the inclination change rate and azimuth change rate of compound drilling may be positive (the inclination and azimuth increase) or negative (the inclination and azimuth decrease), these two values in Eqs 9, 10 must use their absolute values.

According to Eq. 10, it can be observed that the compound drilling proportion of the horizontal section depends on the build-up rate of slide drilling and the inclination change rate and azimuth change rate of compound drilling and is independent of the target parameters and wavy amplitude of the horizontal section. In order to enhance the compound drilling proportion for faster and more cost-effective drilling, the build-up rate of slide drilling should be enhanced properly, and then the inclination change rate and azimuth change rate of compound drilling should be reduced to the greatest extent.

3 Results (influencing factors and laws of the compound drilling proportion)

3.1 Inclination change rate of compound drilling

According to the actual horizontal drilling data, the target area is set at 1.0Ā m (target half-height) Ɨ 6.0Ā m (target half-width), and then the key parameters of slide and compound drilling are set as follows: the build-up rates = 6.0°–9.0°/30Ā m (6.0°/30Ā m for 1.0° bent PDM, 7.5°/30Ā m for 1.25° bent PDM, and 9.0°/30Ā m for 1.5° bent PDM), the inclination change rate = 0.1°–1.5°/30Ā m, and azimuth change rate = 0.3°/30Ā m. The drilling results are estimated using Eqs 7, 8 and shown in Figures 2A, B. In the legend zone, ā€œSDā€ and ā€œCDā€ represent ā€œslide drillingā€ and ā€œcompound drilling,ā€ respectively, and the numbers represent the build-up rate (unit: °/30Ā m) of slide drilling.

FIGURE 2

If the inclination change rate of compound drilling increases, the compound drilling length decreases significantly, but the slide drilling length increases slightly, and then the compound drilling proportion decreases obviously. For a given inclination change rate under compound drilling, if the build-up rate of slide drilling increases, the compound drilling length increases slightly, but the slide drilling length decreases obviously, and then the compound drilling proportion increases obviously. It is proved that increasing the build-up rate of slide drilling and reducing the inclination change rate and azimuth change rate of compound drilling contribute to increasing the compound drilling length and proportion of the horizontal section.

3.2 Build-up rate of slide drilling

Taking 1.25° bent PDM as an example, the build-up rate of slide drilling is set at 7.5°/30Ā m, the inclination change rate of compound drilling is set at 0.5°–1.5°/30Ā m, and the azimuth change rate is set at 0.3°/30Ā m, and then the drilling results are estimated using Eqs 7, 8 and shown in Figures 2C, D. In the legend zone, ā€œSDā€ and ā€œCDā€ represent ā€œslide drillingā€ and ā€œcompound drilling,ā€ respectively, but the numbers represent the inclination change rates (unit: °/30Ā m) of compound drilling.

If the build-up rate of slide drilling increases, the compound drilling length increases slightly, but the slide drilling length decreases obviously, and then the compound drilling proportion increases obviously. For a given build-up rate under slide drilling, if the inclination change rate of compound drilling increases, the compound drilling length decreases significantly, but the slide drilling length increases slightly, and then the compound drilling proportion decreases obviously. It is proved again that increasing the build-up rate of slide drilling and reducing the inclination change rate and azimuth change rate of compound drilling contribute to increasing the compound drilling length and proportion of the horizontal section.

3.3 Case analysis

3.3.1 Drilling results

The LS3-3 horizontal well is located in China. The designed horizontal section is approximately 1200Ā m. The target area is 1.0Ā m (target half-height) Ɨ 6.0Ā m (target half-width). Target inclination is 88.15°, and target azimuth is 161.29°. Bottom-hole assembly (BHA) and drilling parameters are described as follows: BHA: φ152.4Ā mm PDC bit + φ127Ā mm bent PDM (1.25 for the first run and 1° for the second run) + float valve + Φ148Ā mm stabilizer + LWD + Φ96Ā mm non-magnetic drill pipe. Drilling parameters: weight on bit 30Ā kN, top drive speed 50Ā r/min, and drilling fluid flowrate 18Ā L/s.

The statistical horizontal section length is 1,138.66 m, and the alternation time of two drilling modes is 58 in total. Wellbore curvature (dogleg severity) and inclination change rate are shown in Figure 3. For the compound drilling, the inclination mainly increases and the azimuth mainly maintains the same change rate; the average inclination and azimuth change rates are approximately 0.5°/30 m and 0.2°/30 m, respectively; the cumulative length is 1,036.9 m; the average interval length is 17.9 m/time; the maximum interval length is 66.5 m; and the compound drilling proportion is 91.1%. For slide drilling, the build-up rates are approximately 7.5°/30 m and 6.0°/30 m for the first and second runs, respectively; the cumulative length is 101.8 m; the average interval length is 1.8 m/time; the maximum interval length is 3.4 m; and the slide drilling proportion is 8.9%.

FIGURE 3

3.3.2 Verifying analysis

Based on the statistical results, the build-up rate of slide drilling is set at 6.0°–7.5°/30Ā m and the inclination and azimuth change rates of compound drilling are set at 0.5°/30Ā m and 0.2°/30Ā m, respectively; the wellbore fluctuation ratio (amplitude of fluctuation vs. target height) is set at 0.5–0.6. The drilling results of the horizontal section are estimated and shown in Table 1. Here, is the wellbore fluctuation ratio equal to ( is the fluctuation amplitude along the wellbore axis on the vertical projection plot; b is the target half-height); the compound drilling proportions outside and inside brackets are estimated using Eqs 7, 10, respectively. Subsequently, the values outside brackets are set as the theoretical values; the values inside brackets are set as the estimated values.

TABLE 1

(°/30 m) (m) (m) (%)
6.00.5158.814.391.8 (92.3)
6.00.6174.015.691.8 (92.3)
7.50.5160.211.593.3 (93.8)
7.50.6175.512.693.3 (93.8)

Prediction results of slide and compound drilling.

Eq. 10 can estimate the compound drilling proportion. The theoretical prediction results show that the slide drilling length is approximately 11.5–15.6Ā m and the compound drilling length is approximately 158.8–175.5Ā m in one cycle. The compound drilling proportion is approximately 91.8%–93.3%. The actual drilling results show that the compound drilling length is approximately 17.9Ā m/time, the slide drilling length is approximately 1.77Ā m/time, and the compound drilling proportion is approximately 91.1%. The compound drilling proportion is in good agreement with the theoretical results, but the compound drilling and slide drilling lengths are less than the theoretical values. One reason is that the actual wellpath has a lagging effect while alternating compound or slide drilling modes (Su, 2000). Another reason is that the target half-height is only 1.0Ā m. As a result, the directional drilling engineer had to increase the wellpath adjustment frequency and shorten the interval lengths to avoid missing of the target.

3.3.3 Suggestions

The bottom-hole assembly and drilling parameters should be optimized totally to properly increase the build-up rate of slide drilling and reduce the inclination and azimuth change rates of compound drilling to the greatest extent. To achieve this purpose, BHA with two stabilizers (one stabilizer fixed near the drill bit and the other stabilizer fixed above the bent PDM) and medium weight-on-bit (WOB) are recommended (Peng and Di Qinfeng, 2000; Guo et al., 2013; Koulidis et al., 2021). At the same time, more attention should be paid to the formation. The lithology and mechanical properties of the pay zone also have a significant influence on drilling results (Yin et al., 2021; Zhu et al., 2021; Cao et al., 2022).

4 Conclusion

  • (1) The compound drilling proportion of the horizontal section is independent of the target parameters and the wellbore fluctuation amplitude but depends on the build-up rate of slide drilling and the inclination and azimuth change rates of compound drilling.

  • (2) The compound drilling proportion of the horizontal section can be estimated by the build-up rate of slide drilling and the inclination and azimuth change rates of compound drilling.

  • (3) To enhance the compound drilling proportion of the horizontal section and reduce the adjustment frequency of slide drilling, it is necessary to increase the build-up rate of slide drilling and reduce the inclination and azimuth change rates of compound drilling.

Statements

Data availability statement

The original contributions presented in the study are included in the article/Supplementary material; further inquiries can be directed to the corresponding authors.

Author contributions

HC: writing–original draft. CX: writing–review and editing. KH: writing–review and editing. YG: writing–original draft. YS: writing–original draft and funding acquisition. BZ: formal analysis and writing–review and editing.

Funding

The author(s) declare that financial support was received for the research, authorship, and/or publication of this article. This study was supported by the Major Project of National Science and Technology ā€œDevelopment of Rotary Steerable Drilling System (2016ZX05022-002)ā€ and Major Project of China National Petroleum Corporation ā€œResearch and application of key technologies for exploration and development of medium and high maturity continental shale oil (2019E-2605).ā€ The funder was not involved in the study design, collection, analysis, interpretation of data, the writing of this article, or the decision to submit it for publication. This research was also sponsored by Beijing Nova Program.

Conflict of interest

Authors HC, CX, and YG were employed by the company Engineering and Technology Research Institute, CNPC Xinjiang Oilfield Company. Author KH was employed by the company Development Company, CNPC Xinjiang Oilfield Company.

The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

Publisher’s note

All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors, and the reviewers. Any product that may be evaluated in this article, or claim that may be made by its manufacturer, is not guaranteed or endorsed by the publisher.

References

  • 1

    BrandsS.LowdonR. (March 2012). Scaled tortuosity index: quantification of borehole undulations in terms of hole curvature, clearance and pipe stiffness. Proceedings of the IADC/SPE drilling conference and exhibition, San Diego, California, USA.

  • 2

    CaoL.SunJ.ZhangB.LuN.XuY. (2022). Sensitivity analysis of the changing law of temperature profile in the production string of the high-pressure high temperature gas well considering the coupling relation among the gas flow friction, gas properties, temperature and pressure. Front. Phys.10, 1050229. 10.3389/fphy.2022.1050229

  • 3

    GuanZhichuanChenTinggenLiaoHualin (2021). Theory and Technology of drilling engineering. Singapore: Springer.

  • 4

    GuoX.LiY.LiJ.FengM.DuanH. (2019). Discovery of fuling shale gas field and its prospects. Front. Energy13 (2), 354–366. 10.1007/s11708-018-0581-z

  • 5

    GuoZongluGaoDeliZhangHui (2013). Analysis and optimization of holding-inclination capability of steerable assembly with single bend and two stabilizers. Pet. Drill. Tech.41 (6), 19–24.

  • 6

    KoulidisA.KelessidisV.AhmedS., (May 2021). Exploitation of field drilling data with an innovative drilling simulator: highly effective simulation of rotating and sliding mode. Proceedings of the SPE/IADC Middle East drilling Technology conference and exhibition, Abu Dhabi, UAE.

  • 7

    LiuH.MaT.ChenP.WangX.WangX. (2019). Mechanical behaviors of bottom hole assembly with bent-housing positive displacement motor under rotary drilling. Arabian J. Sci. Eng.44, 6029–6043. 10.1007/s13369-017-2564-5

  • 8

    LuN.ZhangB.WangT.FuQ. (2021). Modeling research on the extreme hydraulic extension length of horizontal well: impact of formation properties, drilling bit and cutting parameters. J. Petroleum Explor. Prod.11 (3), 1211–1222. 10.1007/s13202-021-01106-4

  • 9

    MaT.LiuJ.FuJ.WuB. (2022). Drilling and completion technologies of coalbed methane exploitation: an overview. Int. J. Coal Sci. Technol.9 (1), 68. 10.1007/s40789-022-00540-x

  • 10

    MaidlaE.HaciM. (January 2004). Understanding torque: the key to slide-drilling directional wells. Proceedings of the IADC/SPE drilling conference, Dallas, Texas, USA.

  • 11

    NoshiC. I.SchubertJ. J. (March 2019). Calculating a tortuosity index metric using machine learning techniques, Proceedings of the SPE/IADC international drilling conference and exhibition, Hague, The Netherlands.

  • 12

    PengGuorongDi Qinfeng (2000). Predication of steering ability of the slide steering assembly in compounding drilling mode. Pet. Drill. Tech.28 (6), 4–5.

  • 13

    RobelloSamuel. (March 2010). Friction factors: what are they for torque, drag, vibration, bottom hole assembly and transient surge/swab analyses?Proceedings of the IADC/SPE drilling conference and exhibition, New Orleans, Louisiana, USA.

  • 14

    RobelloSamuelJonathan DaleLightfootWilliamTurner. (September 2021). Mechanical and geometrical tortuosities: vanishing and appearing tortuosities. Proceedings of the SPE annual technical conference and exhibition, Dubai, UAE.

  • 15

    RobelloSamuelKaiwanBharuchaYuejinLuo. (February 2005). Tortuosity factors for highly tortuous wells: A practical approach. Proceedings of the SPE/IADC drilling conference, Amsterdam, The Netherlands.

  • 16

    ShiYucaiGuanZhichuanZhaoHongshanHuangGenlu (2017). A new method for build-up rate prediction of bottom-hole assembly in well drilling. J. China Univ. Petroleum41 (1), 85–89.

  • 17

    SuYinao (2000). Wellpath control of horizontal well. Beijing, China: Petroleum Industry Press.

  • 18

    WilliamsJ. B.ApostalM. C.HaduchG. A. (October 1989). An analysis of predicted wellbore trajectory using a three-dimensional model of a bottomhole assembly with bent sub, bent housing, and eccentric contact capabilities. Proceedings of the SPE annual technical conference and exhibition, San Antonio, Texas.

  • 19

    YinQ.WuJ.JingH.HeM.MengQ. (2021). Shear mechanical responses of sandstone exposed to high temperature under constant normal stiffness boundary conditions. Geomechanics Geophys. Geo-Energy Geo-Resources7, 3510.1007/s40948-021-00234-9

  • 20

    YuR.GuoW.DingL.WangM.ChengF.ZhangX.et al (2021). Quantitative characterization of horizontal well production performance with multiple indicators: A case study on the weiyuan shale gas field in the sichuan basin, China. Front. Earth Sci.15 (2), 395–405. 10.1007/s11707-021-0885-x

  • 21

    ZhangB.JiangR.SunB.LuN.HouJ.BaiY.et al (2022a). Establishment of the productivity prediction method of Class III gas hydrate developed by depressurization and horizontal well based on production performance and inflow relationship. Fuel308, 122006. 10.1016/j.fuel.2021.122006

  • 22

    ZhangB.LuN.GuoY.WangQ.CaiM.LouE. (2022b). Modeling and analysis of sustained annular pressure and gas accumulation caused by tubing integrity failure in the production process of deep natural gas wells. J. Energy Resour. Technol.144 (6), 063005. 10.1115/1.4051944

  • 23

    ZhuC.HeM.ZhouY.QinX. z.YinQ. (2021). Numerical investigation on the fatigue failure characteristics of water-bearing sandstone under cyclic loading. J. Mt. Sci.18 (12), 3348–3365. 10.1007/s11629-021-6914-0

  • 24

    ZhuXiaohuaLiKeAnJiawei (2019). Calculation and analysis of dynamic drag and torque of horizontal well strings. Nat. Gas. Ind. B6, 183–190. 10.1016/j.ngib.2018.08.004

Summary

Keywords

slide steering drilling system, compound drilling, slide drilling, horizontal section, wellpath control, build-up rate, inclination change rate

Citation

Chu H, Xiong C, Hu K, Guo Y, Shi Y and Zhang B (2023) Enhancing the benefit of slide steering drilling systems in horizontal wells of unconventional reservoirs. Front. Energy Res. 11:1267228. doi: 10.3389/fenrg.2023.1267228

Received

26 July 2023

Accepted

11 September 2023

Published

29 September 2023

Volume

11 - 2023

Edited by

Xiaojin Zheng, Princeton University, United States

Reviewed by

Chun Zhu, Hohai University, China

Jun Yang, Changzhou University, China

Updates

Copyright

*Correspondence: Yucai Shi, ; Bo Zhang,

Disclaimer

All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article or claim that may be made by its manufacturer is not guaranteed or endorsed by the publisher.

Outline

Figures

Cite article

Copy to clipboard


Export citation file


Share article

Article metrics