A Correction on
Attenuation of Rayleigh waves by a combined periodic open trench-wave impeding block vibration isolating barrier considering tunnel influence
by Hou B, Li W and Pei J (2025). Front. Phys. 13:1643353. doi: 10.3389/fphy.2025.1643353
Affiliation Gansu Forestry Voctech University, Tianshui, China was erroneously given as Gansu Forestry Vocational and Technical University, Tianshui, China.
The original article has been updated.
Publisher’s note
All claims expressed in this article are solely those of the authors and do not necessarily represent those of their affiliated organizations, or those of the publisher, the editors and the reviewers. Any product that may be evaluated in this article, or claim that may be made by its manufacturer, is not guaranteed or endorsed by the publisher.
Keywords: periodic combined barrier, open trench, wave impeding block, vibration isolation performance, Rayleigh waves, broadband vibration isolation
Citation: Hou B, Li W and Pei J (2025) Correction: Attenuation of Rayleigh waves by a combined periodic open trench-wave impeding block vibration isolating barrier considering tunnel influence. Front. Phys. 13:1722211. doi: 10.3389/fphy.2025.1722211
Received: 10 October 2025; Accepted: 14 October 2025;
Published: 27 October 2025.
Approved by:
Frontiers Editorial Office, Frontiers Media SA, SwitzerlandCopyright © 2025 Hou, Li and Pei. This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.
*Correspondence: Junhua Pei, MTgwOTM4NTkzMzBAMTYzLmNvbQ==
Bin Hou